Loading...
HomeMy WebLinkAboutFile Documents.800 S Mill St.0123.2018 (7).ARBK1 CONSTRUCTION WASTE MANAGEMENT PLAN Company Name: ASPEN CONTRUCTION, INC Contact Person: DAVID MILLER Address: 208 ABC ASPEN CO 81611 Telephone #: 970 379-9331 Project Location: 800 SOUTH MILL STREET #7 Contractor: ASPEN CONSTRUCTION Contact Person: DAVID MILLER Telephone #: 970 379-9331 Recycling Coordinators: Contact Person: Telephone # Project Description: INTERIOR RENOVATION OF CONDOMINIUM INCLUDING THE REPLACEMENT OF FIXTURES AND FINISHES. NO EXTERIOR OR STRUCTURAL WORK SHALL BE DONE. Waste Management Goals: ➢ This project will recycle or salvage for reuse a minimum of 75 generated on-site. % by weight of the waste ➢ Waste reduction will be achieved through building design, and reuse and recycling efforts will be maintained throughout the construction process. Waste Prevention Planning: ➢ Compliance with Chittenden Solid Waste District’s (C.S.W.D.) mandatory recycling requirements for businesses. C.S.W.D. mandatory recyclables include: o newspaper o corrugated cardboard o white and colored office paper o plastic and glass bottles and jars o metal cans 04/26/2018 2 ➢ Compliance with C.S.W.D. and Pitkin County’s Landfill Bans, i.e. no disposal of tires, appliances, yard waste, mandatory recyclables, hazardous waste, batteries, fluorescent tubes, electronic waste and large metal items. ➢ Project Construction Documents – Requirements for waste management which will be included in all work. The General Contractor will contractually require all subcontractors to comply with the C.S.W.D. mandatory recycling requirements. ➢ The Construction Waste Reduction Plan shall be implemented and executed as follows and as on the chart: o Salvageable materials will be diverted from disposal where feasible. o There will be a designated area on the construction site reserved for a row of dumpsters each specifically labeled for respective materials to be received. o Hazardous waste will be managed by a licensed hazardous waste vendor. 04/26/2018 3 1. Salvage Yes No Do you plan to salvage materials from this project prior to demolition or construction? X If YES, list the materials that will be salvaged (e.g., doors, windows, casing, toilets, sinks, fixtures, wood siding, tiles, etc.) Facility or Salvage company receiving material Receipt attached Y/N ? 1. WINDOWS, DOORS, CASINGS, SIDING, MASONRY HABITIAT FOR HUMANITY NO 2. 3. 4. 5. 2. Source Separation Yes No Do you plan to source separate any materials for delivery to a recycling facility (e.g. separation of material such as wood, concrete, metal into separate bins) Materials Hauler Facility GLASS, TIN, CARDBOARD, NEWSPAPER SELF ASPEN RECYCLE CENTER 3. On-Site Use Yes No 04/26/2018 4 Do you plan any on-site reuse activities for this project (e.g. reuse of wood forms for concrete, on-site crushing of concrete for on-site use, use of reusable containers or pallets for material deliveries, etc.)? (please provide photos of locations these items were reused) X If yes, please describe: 4. Disposal at landfill Will any materials be disposed of (not recycled or salvaged) at the landfill? Yes No Estimate the number of tons of material to be taken to the landfill for disposal : 1 TON INCLUDING DRYWALL, TILE, EXCESS MATERIALS X 04/26/2018 Construction & Demolition Summary Report (CDSR) This form must be completed for the following types of projects: • All New Construction • All Demolition, (excluding single family & duplex) • Addition/Alteration with construction valuation exceeding $50,000 (excluding single family & duplex residential) Completed Summary Reports must be submitted prior to sign off at Final Inspection and issuance of certificate of occupancy or temporary certificate of occupancy. A separate Summary Report is required for each permit issued. Deliver completed CDSR to Building Inspector. Call (XXX) XXX-XXXX or email with inquiries regarding this form. DO NOT ATTACH ADDITIONAL ITEMS For lines 1, 2 &3 please check only 1 item for each 1) Project Type: New Construction Addition/Alteration Demolition 2) Building Type: Non-residential Single Family/Duplex Apartment/Multifamily Sewer/Storm Drain Streets, Sidewalks, Traffic Bridge Landscape, Parks, Open Space 3) Tenant Improvement (check one): Yes No 4) Size of Project 0 SF NET sq. ft. Project Valuation $ 89,500 5) Completion Date 06 / 30 / 18 6) Describe any difficulties you encountered in complying with your waste management plan and tell us how to remedy the problem in the future. d.miller@aciaspen.com Email: Phone: 970 920-3960 Fax: 970 429-1137 Company: _ASPEN CONSTRUCTION, INC. Contact Mailing Address: PO BOX 4446 City ASPEN State CO ZIP 81611 Title: PROJECT MANAGER Contact Name: DAVID MILLER Permit #: Project Address: (include floor, suite, etc.): 800 SOUTH MILL STREET #7 Counter Staff Diversion Goal Approved Good Cause Non-Attainment Conditional Approval Not Approved, reason CDSR Submitted / / Received / / For City Use Only: App Filed / / 04/26/2018 0.5 0.25 0.2 55 0.25 0.25 0.5 0.25 0.2 NA 0.25 0.25 0.1 0.1 0 0 0.1 0.1 REQUIREMENT: Recycle % of Asphalt & Concrete materials and no less than % of all other debris (measured in tons). Instructions: Using receipts and invoices list the tonnage of materials recycled during construction or demolition. See the Conversion Worksheet to change all materials to tons. Complete the chart below and make sure your column totals are correct. Include destinations for all materials. Use Materials Conversion Worksheet to convert from cubic yards, square feet, board feet, etc. to tons Column A – Tons of scrap or debris for each material type. Columns B, C, D – quantities of A to be salvaged or reused, recycled, or disposed. See worksheet for definitions. Column E – list vendors or facilities used for salvage or reuse, recycling, or disposal. Address: 222 SOUTH CLEVELAND ST. Permit #: 04/26/2018