CONSTRUCTION WASTE MANAGEMENT PLAN
Company Name: ASPEN CONTRUCTION, INC Contact Person: DAVID MILLER
Address:
208 ABC ASPEN CO 81611
Telephone #: 970 379-9331
Project Location: 800 SOUTH MILL STREET #7
Contractor: ASPEN CONSTRUCTION
Contact Person: DAVID MILLER
Telephone #: 970 379-9331
Recycling Coordinators:
Contact Person:
Telephone #
Project Description:
INTERIOR RENOVATION OF CONDOMINIUM INCLUDING THE
REPLACEMENT OF FIXTURES AND FINISHES. NO EXTERIOR OR
STRUCTURAL WORK SHALL BE DONE.
Waste Management Goals:
➢ This project will recycle or salvage for reuse a minimum of 75
generated on-site.
% by weight of the waste
➢ Waste reduction will be achieved through building design, and reuse and recycling efforts will be
maintained throughout the construction process.
Waste Prevention Planning:
➢ Compliance with Chittenden Solid Waste District’s (C.S.W.D.) mandatory recycling
requirements for businesses. C.S.W.D. mandatory recyclables include:
o newspaper
o corrugated cardboard
o white and colored office paper
o plastic and glass bottles and jars
o metal cans
04/26/2018
2
➢ Compliance with C.S.W.D. and Pitkin County’s Landfill Bans, i.e. no disposal of tires,
appliances, yard waste, mandatory recyclables, hazardous waste, batteries, fluorescent tubes,
electronic waste and large metal items.
➢ Project Construction Documents – Requirements for waste management which will be included
in all work. The General Contractor will contractually require all subcontractors to comply with
the C.S.W.D. mandatory recycling requirements.
➢ The Construction Waste Reduction Plan shall be implemented and executed as follows and as
on the chart:
o Salvageable materials will be diverted from disposal where feasible.
o There will be a designated area on the construction site reserved for a row of
dumpsters each specifically labeled for respective materials to be received.
o Hazardous waste will be managed by a licensed hazardous waste vendor.
04/26/2018
3
1. Salvage Yes No
Do you plan to salvage materials from this project prior to
demolition or construction? X
If YES, list the materials that will be salvaged (e.g., doors,
windows, casing, toilets, sinks, fixtures, wood siding, tiles, etc.)
Facility or Salvage company receiving
material
Receipt attached
Y/N ?
1. WINDOWS, DOORS, CASINGS, SIDING, MASONRY HABITIAT FOR HUMANITY NO
2.
3.
4.
5.
2. Source Separation Yes No
Do you plan to source separate any materials for delivery to a recycling facility (e.g. separation of material
such as wood, concrete, metal into separate bins)
Materials Hauler Facility
GLASS, TIN, CARDBOARD, NEWSPAPER SELF ASPEN RECYCLE CENTER
3. On-Site Use Yes No
04/26/2018
4
Do you plan any on-site reuse activities for this project (e.g. reuse of wood forms for concrete, on-site crushing
of concrete for on-site use, use of reusable containers or pallets for material deliveries, etc.)? (please provide
photos of locations these items were reused)
X
If yes, please describe:
4. Disposal at landfill
Will any materials be disposed of (not recycled or salvaged) at the landfill? Yes No
Estimate the number of tons of material to be taken to the landfill for disposal :
1 TON INCLUDING DRYWALL, TILE, EXCESS MATERIALS X
04/26/2018
Construction & Demolition Summary Report (CDSR)
This form must be completed for the following types of projects:
• All New Construction
• All Demolition, (excluding single family & duplex)
• Addition/Alteration with construction valuation exceeding $50,000
(excluding single family & duplex residential)
Completed Summary Reports must be submitted prior to sign off at Final Inspection and issuance of certificate of
occupancy or temporary certificate of occupancy. A separate Summary Report is required for each permit issued.
Deliver completed CDSR to Building Inspector. Call (XXX) XXX-XXXX or email with
inquiries regarding this form.
DO NOT ATTACH ADDITIONAL ITEMS
For lines 1, 2 &3 please check only 1 item for each
1) Project Type: New Construction Addition/Alteration Demolition
2) Building Type: Non-residential Single Family/Duplex Apartment/Multifamily
Sewer/Storm Drain Streets, Sidewalks, Traffic Bridge
Landscape, Parks, Open Space 3) Tenant Improvement (check one): Yes No
4) Size of Project 0 SF NET sq. ft. Project Valuation $ 89,500
5) Completion Date 06 / 30 / 18
6) Describe any difficulties you encountered in complying with your waste management plan and tell us how to remedy
the problem in the future.
d.miller@aciaspen.com Email: Phone: 970 920-3960 Fax: 970 429-1137
Company: _ASPEN CONSTRUCTION, INC.
Contact Mailing Address: PO BOX 4446
City ASPEN State CO ZIP 81611
Title: PROJECT MANAGER Contact Name: DAVID MILLER
Permit #:
Project Address: (include floor, suite, etc.): 800 SOUTH MILL STREET #7
Counter Staff
Diversion Goal Approved Good Cause Non-Attainment Conditional Approval
Not Approved, reason
CDSR Submitted / / Received / / For City Use Only: App Filed / /
04/26/2018
0.5
0.25
0.2
55
0.25 0.25
0.5
0.25
0.2
NA
0.25 0.25
0.1 0.1
0 0
0.1
0.1
REQUIREMENT:
Recycle % of Asphalt & Concrete materials and no less than % of all other debris (measured in
tons).
Instructions: Using receipts and invoices list the tonnage of materials recycled during construction or demolition. See
the Conversion Worksheet to change all materials to tons. Complete the chart below and make sure your column totals
are correct. Include destinations for all materials.
Use Materials Conversion Worksheet to convert from cubic yards, square feet, board feet, etc. to tons
Column A – Tons of scrap or debris for each material type.
Columns B, C, D – quantities of A to be salvaged or reused, recycled, or disposed. See worksheet for definitions.
Column E – list vendors or facilities used for salvage or reuse, recycling, or disposal.
Address: 222 SOUTH CLEVELAND ST. Permit #:
04/26/2018