HomeMy WebLinkAboutFile Documents.700 Gillespie St.0129.2018 (15).ACBKCOMcheck Software Version COMcheck-Web
Envelope Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
700 West Gillespie Avenue
Aspen, Colorado 81611
Owner/Agent:Designer/Contractor:
Project Information
Energy Code:
Aspen Center for Physics
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Additional Efficiency Package(s)
Envelope Assemblies
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
Envelope TBD: No envelope assemblies specified
Project Title:
Data filename:
Aspen Center for Physics 01/25/19Report date:
81 ofPage
COMcheck Software Version COMcheck-Web
Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Construction Site:
700 West Gillespie Avenue
Aspen, Colorado 81611
Owner/Agent:Designer/Contractor:
Project Information
Energy Code:
Aspen Center for Physics
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Additional Efficiency Package(s)
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
Unspecified 0 0.00 0
N/ATotal Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixture
Unspecified (wattage exempt for this area)
0Total Proposed Watts =
Interior Lighting TBD: Invalid building use type
Project Title:
Data filename:
Aspen Center for Physics 01/25/19Report date:
82 ofPage
COMcheck Software Version COMcheck-Web
Exterior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Construction Site:
700 West Gillespie Avenue
Aspen, Colorado 81611
Owner/Agent:Designer/Contractor:
Project Information
Energy Code:
Aspen Center for Physics
2 (Neighborhood business district)Exterior Lighting Zone
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts /
D
Tradable
Wattage
E
Allowed Watts
(B X C)
Classroom (Outdoor sales area/lot)1818 ft2 0.25 Yes 454
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
454
454
600
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixture
Classroom (Outdoor sales area/lot, 1818 ft2): Tradable Wattage
LED: LED PAR 18W:1 18 18 324
LED: LED Linear 8W:1 3 8 26
350Total Tradable Proposed Watts =
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version COMcheck-Web and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Exterior Lighting PASSES: Design 67% better than code
Project Title:
Data filename:
Aspen Center for Physics 01/25/19Report date:
83 ofPage
COMcheck Software Version COMcheck-Web
Mechanical Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
700 West Gillespie Avenue
Aspen, Colorado 81611
Owner/Agent:Designer/Contractor:
Project Information
Energy Code:
Aspen Center for Physics
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Additional Efficiency Package(s)
Mechanical Systems List
Quantity System Type & Description
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version COMcheck-Web and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
Aspen Center for Physics 01/25/19Report date:
84 ofPage
Inspection Checklist
Requirements: 66.0% were addressed directly in the COMcheck software
COMcheck Software Version COMcheck-Web
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR8]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the exterior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: A103
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Center for Physics 01/25/19Report date:
85 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
C405.2.5
[EL25]null
Automatic lighting controls for exterior
lighting installed. Controls will be
daylight controlled, set based on
business operation time-of-day, or
reduce connected lighting > 30%.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Center for Physics 01/25/19Report date:
86 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C405.5.1
[FI19]1
Exterior lighting power is consistent
with what is shown on the approved
lighting plans, demonstrating
proposed watts are less than or equal
to allowed watts.
Complies
Does Not
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Center for Physics 01/25/19Report date:
87 ofPage
Project Title:
Data filename:
Aspen Center for Physics 01/25/19Report date:
88 ofPage