HomeMy WebLinkAboutFile Documents.700 Gillespie St.0129.2018 (19).ACBKAspen Center for Physics Outdoor Patio, 700 West Gillespie St
To: Justin Forman, Engineering, and Aaron Reed, Storm water/Engineering, City of
Aspen
Re: Building Comments Replies: 01/29/2019, based on telephone conversation on
1/22/2019
From: Jeffrey Woodruff, Harry Teague Architects
CC: Jeffrey Woodruff, S.L.O.W 2 Construction
Justin and Aaron,
As per our conversation the following documents have been updated to
reflect engineering and storm water’s comments:
1. Minor engineering review
a. No change to hardscape
b. Change from center drain to dry well (cut sheet provided)
c. Location of drywell confirmed with structural engineer and
excavation team.
2. CMP- updated as per our discussion. Changes to earlier
document sent to Ian/David (Parks) and reflect our
conversation. The major updates as per our conversation were with
respect to:
a. Concrete clean out
b. Neighborhood cleanliness- Truck cleanliness leaving the
parking lot (entering the neighborhood). Site cleanliness,
sweeping of site to maintain cleanliness.
c. Erosion and sediment control
d. Storm water narrative updated
3. A102 Landscape and Civil Plan.
a. The dry well was placed in the North East corner as per parks,
outside of the drip line of the existing aspen trees.
b. The Section on A401 shows we have 2’ of soil for the grape
ivy and other on site vegetation, over 1’ of gravel containing
the perforated pipe and draining to the dry well.
4. A dry well cut sheet has been added as per your request.
5. A letter from structural signing off on the placement of the drywell
has been added to the documentation.
01/29/2019