Loading...
HomeMy WebLinkAboutFile Documents.660 Moore Dr.0134.2018 (3).ARBKConstruction Management Plan 660 Moore 1. General a. No soil to be disturbed 2. Project Introduction a. No soil to be disturbed b. See attached map i. This project encompasses a total reroof don in CeDUR Walden Shake 3. Project Documentation a. A building permit will be required for this work, no # received yet b. Pacific Sheet Metal Sign to be posted at front of 660 Moore c. Contact List i. Owner: Michael J Dubilier 917-601-1016 ii. Owner Agent : Brad Randel 505-259-8900 lbr131@hotmail.com iii. Contractor: Pacific Sheet Metal Inc., C/O Les Simms 970-401-0923 les@pacificsheetmetal.com iv. Site Supervisor: Dave Hoffman 970.948.2567 dave@pacificsheetmetal.net v. Safety Officer: Steve Narvaez 970.379.9466 cmolina@pacificsheetmetal.com vi. Traffic Officer: Dave Hoffman 970.948.2567 dave@pacificsheetmetal.net vii. Erosion Control Rep: N/A no soil disturbed 4. Project Implementation a. Dates of Construction: May 10 2018 – June 10, 2018 b. Hours of Construction: Mon-Fri 7:30 AM to 5 PM i. Saturday work as necessary to meet project timeline, 9 AM to 5 PM c. Construction Schedule i. Phase I: Tear off existing roof ii. Phase II: Install Carlisle WIP 300 ice an water shield iii. Phase III: Install roof flashings and shingles iv. Phase IV: Install gutter, downspout and heat cable v. Final detailing and close out of project – d. Project Fencing i. No soil disturbed, no work over public ROW 5. Project Management a. Parking Management: vehicles to make use of carpool permits and park in eligible zones in residential area b. See attached ordinance 35 c. Project Management Map: See attached map i. Materials to be staged on existing roof and in driveway ii. Trailers and Man Lifts not used iii. Waste to be managed via roll-off dumpsters iv. Materials to be disposed of and not recycled 05/07/2018 6. Traffic Control a. Project Haul Routes: See attached map b. Weight and Size Limitations: deliveries from full size semi-trucks c. Delivery Vehicle: Semi-trucks i. Maximum of 1 delivery per day ii. Deliveries to be carried out between 8:00 am and 10:00 am iii. Exceptions to delivery schedule: unexpected delays in shipping 7. Traffic Control Plan a. See attached map b. See attached map c. Peak traffic hours: no deliveries during peak times 8. Sediment and Erosion Control a. N/A no soil disturbed 9. Fugitive Dust Control a. N/A no soil disturbed 10. Emissions a. All vehicles meet local emissions standards 11. Noise Suppression a. We will be working with roofing hand tools b. Hours will be limited to 7:30AM-5:30PM ( accepted times for making noise) 05/07/2018 05/07/2018