Loading...
HomeMy WebLinkAboutFile Documents.614 North St.0248.2017 (21).ARBKASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08 Verification of Building Location by Building Contractor For Building and Permit Information, please refer to our website at: http://www.aspenpitkin.com/depts/41/ Exemption A City verification of building location is not needed when the project creates less the 200 square feet of new floor area. PART A: Complete and Submit as part of the Building Permit Application o Building / Job Address or Location: _____________________________________________ o Your Name (Person Completing Part A): ____________________________________________ o Your Company: ________________________________________________________________ o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary. Are building ties shown? (circle one) ‘Yes’ ‘No’ o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the elevation of this benchmark? _________________________________ o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk. Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’ o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation: (i.e., 100’ first floor elev = 7962.50’) _______________________________ ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’ o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved building plans. o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________ o According to the building plans, what was the design elevation for the same place on the foundation wall? ______________________________ o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’ o If yes, why? ________________________________________________ The undersigned qualified individual certifies that the information in Part B is accurate - Signature: Date: _ Printed Name: Contact ph. # : ____________________ Company: ______________________________________________________________ 614 W NORTH ST RYAN LEE FORUM PHI 7891.05 7891'-9"= 100'-0" 10/11/17