Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:Alteration
Construction Site:
625 E HYMAN AVE
ASPEN, CO 81611
Owner/Agent:
633 SPRING II LLC
Designer/Contractor:
DANA ELLIS
ROWLAND+BROUGHTON
ARCHITECTURE
234 E HOPKINS AVE
ASPEN, CO 81611
970-544-9006
Project Information
Energy Code:
MTN FORGE TENANT RELOCATION
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-LEVEL ONE (Office)
N/ATotal Allowed Watts =
Area Category Exemption Qualifications
Activity Area
# Fixtures
Repl./AddedPre-Alt.null
Total # Watts
Pre-Alt.Post-Alt.
LEVEL ONE ( Office 1317 sq.ft.)8 0
Exemption: Less than 50% fixture replacement.
4800.000 4800.000
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
LEVEL ONE ( Office 1317 sq.ft.): Exempt
N/ATotal Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.0.0 and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES
Project Title:
Data filename:
MTN FORGE TENANT RELOCATION
P:\Proj-2017\21718.20_Mtn Forge - Tenant Design\02_Project Info\04_Building
Permit\COMcheck\Unit 104.cck
01/03/19Report date:
31 ofPage
Dana Ellis - Rowland+Broughton 2019-02-18
02/22/2019
02/25/2019
justinh
Inspection Checklist
Requirements: 0.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.0.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
MTN FORGE TENANT RELOCATION
P:\Proj-2017\21718.20_Mtn Forge - Tenant Design\02_Project Info\04_Building
Permit\COMcheck\Unit 104.cck
01/03/19Report date:
32 ofPage02/22/2019
Project Title:
Data filename:
MTN FORGE TENANT RELOCATION
P:\Proj-2017\21718.20_Mtn Forge - Tenant Design\02_Project Info\04_Building
Permit\COMcheck\Unit 104.cck
01/03/19Report date:
33 ofPage02/22/2019