Loading...
HomeMy WebLinkAboutFile Documents.625 E Hyman Ave.0011.2019 (7).ACBK aec Architectural Engineering Consultants, Inc. Mechanical, Electrical, & Lighting Design Services An Office with LEEDTTMM Accredited Professionals 40801 US Hwy 6 & 24, Suite 214, Eagle-Vail, CO 81620 Post Office Box 8489, Avon, CO 81620 phone: 970-748-8520 email: stan@aec-vail.com web: www.aec-vail.com Ventilation Report – Mountain Forge Tenant Relocation to 625 E Hyman Units 103 & 104 This report is intended to verify compliance of ventilation air requirements in the 625 E Hyman Units 103 & 104 for the new tenant being relocated from the Mountain Forge building. The information included is based on previous mechanical designs for units 103 & 104 and the currently installed fan coils and planned outside air airflows. To verify compliance, actual airflows should be tested in the field. OUTDOOR AIR VENTILATION ROOM ROOM SIZE (SQ.FT.) DENSITY (# / 1000 SF) # PEOPLE CFM/ PERSON CFM/ SF O.A REQUIRED (CFM) O.A. PROVIDED (CFM) UNIT 103 OFFICE 528 5 3 5 0.06 47 CONFERENCE ROOM 114 50 6 5 0.06 37 HUDDLE 108 5 1 5 0.06 11 TOTAL (FROM EXISTING FC-12): 95 240** UNIT 104 82 30 3 5 0.06 20 LOUNGE 71 30 3 5 0.06 19 MAIN OFFICE SPACE 365 5 2 5 0.06 32 CONFERENCE 122 50 7 5 0.06 42 OFFICE 72 5 1 5 0.06 9 OFFICE 56 5 1 5 0.06 8 PHONE BOOTH 32 5 1 5 0.06 7 TOTAL (FROM EXISTING FC-13): 138 280 *AIR VOLUME REQUIREMENTS BASED UPON LARGEST REQUIREMENTS LISTED IN TABLE 403.3.1.1 OF 2015 IMC **BASED ON 40% OF AIR FLOW FROM FC-12 SERVING THIS SPACE & 585 CFM TOTAL PREVIOUSLY PLANNED OUTSIDE AIR TO THE UNIT 02/22/2019 02/25/2019 justinh