Loading...
HomeMy WebLinkAboutFile Documents.610 S West End St.0182.2018 (3).ARBKCONSTRUCTION MANAGEMENT PLAN for GANT B102 610 S. WEST END ST. PREPARED BY: HUFKER DESIGN STUDIO JULY 3RD, 2018 07/06/2018 Page 2 of 3 2.2 This Construction Management Plan is being submitted for the site located at 610 S West End St. in the City of Aspen. The project is located in the R-15 zoning district. The remodel is located in the first floor of building B at The Gant. Unit B102 – The Gant 2.3 The scope of the project is a 975 square foot interior remodel. 5.3 The contractor will request parking spots for subcontractors as required. 5.4 The staging area will be located in a parking spot outside the unit and will be coordinate with the Gant. 5.5 The city right-of-way will not be affected by this project. 5.7 The contractor will coordinate a dumpster location with The Gant. 6.0 The contractor will follow all traffic control requirements as defined by the City of Aspen. All deliveries will use the main entry to the driveway. 07/06/2018 Page 3 of 3 7.0 Sidewalks will not be affected by this project. 11.0 Noise suppression will not be required as the project location is inside an existing building. 07/06/2018