Loading...
HomeMy WebLinkAboutFile Documents.610 S West End St.0182.2018 (4).ARBKCONSTRUCTION MANAGEMENT Please Refer questions to PLAN CHECKLIST the Engineering Dept. NAME OF PROJECT: _________________ (970-920-5080) NOTES: 1.0 General (OFFICE USE ONLY) ‰Total SF of soil disturbance/SF of building Demo _____________________ ‰Table of Contents _____________________ 2.0 Project Introduction ‰2.1 Total project disturbance area? _____________________ ‰2.2 Project vicinity map _____________________ 2.3 Description that includes: ‰Background information _____________________ ‰Proposed development type _____________________ 3.0 Project Documentation ‰3.1 Describe permit types, list permit #’s and Include copies of all permits ‰3.2 Indicate project notification per CMP Manual ‰3.3 Project Sign is constructed and posted o (When construction exceeds 30 days) _____________________ 3.4 Contact list included for: ‰Owner _____________________ ‰Contractor _____________________ ‰Site supervisor _____________________ ‰Safety officer _____________________ ‰Traffic officer _____________________ ‰Erosion control representative _____________________ 4.0 Project Implementation (specify/include items below) ‰4.1 Dates of construction _____________________ ‰4.2 Hours of construction _____________________ ‰4.3 Construction schedule ‰4.5 Describe project fencing _____________________ ‰4.6 Site map for tree protection fencing/tree _____________________ drip lines (as applicable) ‰4.7 Parks Issues – driplines, permits, demo 5.0 Project Management ‰5.1 Complete Parking Management form (Appendix B)_____________________ ‰5.2 Read Emergency vehicle access and include a copy of ordinance 35 ‰5.4 Map showing location of: □Staging _____________________ □Trailer _____________________ Materials _____________________ Waste management _____________________ Recycling – specify exact plan Gant Unit B-102 975 SF (interior) (Sheet #3) (See Permit Contact Sheet) 8:30 am - 5:00 pm Sep. 6th - Dec. 1st. n/a n/a n/a n/a Residential remodel permit 07/06/2018 6.0 Traffic Control ‰6.2 Project haul routes _____________________ ‰6.3 Weight and size limitations of vehicles _____________________ ‰6.4 Construction vehicles activities defined _____________________ 6.4 Specify delivery vehicle: ‰Maximum number of deliveries at a time _____________________ ‰Hours of deliveries _____________________ □Exceptions to delivery schedule _____________________ 6.5 Include Traffic Control Plan – Prepared by a Certified Traffic Control Supervisor that includes a minimum of: ‰Site Access locations _____________________ ‰Street/site signage and barricades for _____________________ traffic and pedestrian control _____________________ ‰Traffic control related to peak traffic _____________________ hours and special events _____________________ ‰Traffic flagging areas and hours _____________________ 8.0 Sediment and Erosion Control ‰8.1 Storm Water Pollution Prevention Plan _____________________ 8.1 Plan Includes: ‰Erosion control measures _____________________ ‰Mud track location _____________________ ‰Tire washing location _____________________ ‰Concrete wash location _____________________ 9.0 Fugitive Dust Control ‰9.1 Complete a fugitive dust control plan Plan includes: Sediment tracking techniques Water Truck 24-hour contact 10.0 Emissions □10.1 Assure proper vehicle maintenance □10.2 Opacity – no darker than 40% _____________________ 11.0 Noise Suppression ‰11.1 Include a signed noise suppression plan _____________________ ‰11.2 Specify noise equipment/methods used per CMP Manual _____________________ REVIEWED BY: _____________________ DATE: n/a n/a 07/06/2018