Are there any other pieces of equipment
being proposed here besides the
washer/dryer and the AC unit shown in
the mechanical plans? Fuel fired
appliances cannot be located in storage
closets per IMC 303.3
00.Plans.2017.02.28.pdf (8)
Subject: PlanCheck
Page: 3
Checkmark: Unchecked
Author: justinh
File Name: 00.Plans.2017.02.28.pdf
Fill out a REMP worksheet for this hot tub
or provide specs/cutsheets that
demonstrate it is exempt from REMP:
-self contained spa, 64 SF or less, and be
certified by the CEC or APSP-14
-R12 value for the cover and be listed to
ASTM F-1346
Provide structural verification that the roof
deck will support the load of the hot tub.
The previously approved plans for this
level show a deck drain under the
proposed hot tub. The north half of the
deck drains to that location, show how
you intend to maintain compliant drainage
for this half of the deck.
Subject: PlanCheck
Page: 3
Checkmark: Unchecked
Author: justinh
File Name: 00.Plans.2017.02.28.pdf
Provide a lighting plan and specs on all
recessed lighting - IECC 402.4.5 all
recessed luminaries in the building
thermal envelope shall be sealed and IC
rated
Subject: PlanCheck
Page: 3
Checkmark: Unchecked
Author: justinh
File Name: 00.Plans.2017.02.28.pdf
The approved plans for the building show
this as a fixed window. Either provide a
cutsheet on a new window in this location
that complies as an egress window or
note on the plans that you are claiming
exemption 1 of IBC 1029.1.
Subject: PlanCheck
Page: 3
Checkmark: Unchecked
Author: justinh
File Name: 00.Plans.2017.02.28.pdf
Either provide a cutsheet on an existing
window in each bedroom that shows it
complies as an egress window or note on
the plans that you are claiming exemption
1 of IBC 1029.1.
Subject: PlanCheck
Page: 5
Checkmark: Unchecked
Author: justinh
File Name: 00.Plans.2017.02.28.pdf
Are you proposing a different ceiling finish
than what is shown?
302B 302A
307A
306A
306B
307B
W/D
RDW 6'-3"35/8"4'-8"1'-6"6"1'-6"4'-0"2'-2"1'-6"4'-0"6'-9"5'-03/4"6"9"6'-0"
T.F.F. 124'-63/4"
ELECTRIC PANELLOCATION
301
302
303
304
306
307
BEDROOM #1
FOYERMECH./LAUNDRY
GALLERY
KITCHEN
DINING
BATH #1
Are there any other pieces of equipmentbeing proposed here besides thewasher/dryer and the AC unit shown in
the mechanical plans? Fuel firedappliances cannot be located in storageclosets per IMC 303.3
5
4
3
2.3
2.22.12
1
321 D
L
ROOF DECK #1
HOTTUB
Fill out a REMP worksheet for this hot tub or provide specs/cutsheets thatdemonstrate it is exempt from REMP:-self contained spa, 64 SF or less, and be certified by the CEC or APSP-14-R12 value for the cover and be listed to ASTM F-1346
Provide structural verification that the roof deck will support the load of the
hot tub.
The previously approved plans for this level show a deck drain under theproposed hot tub. The north half of the deck drains to that location, showhow you intend to maintain compliant drainage for this half of the deck.
GENERAL NOTES
1. PER IECC2009.404.1, A MINIMUM OF 50 PERCENT OF THE LAMPS IN PERMANENTLY INSTLALLED LIGHTING FIXTURES SHALL BE HIGH-EFFICANCY LAMPS.
Provide a lighting plan and specson all recessed lighting - IECC
402.4.5 all recessed luminaries inthe building thermal envelope
shall be sealed and IC rated
307A
306B
6'-3"35/8"306
307
BEDROOM #1
BATH #1
The approved plans for the building
show this as a fixed window. Either
provide a cutsheet on a new window
in this location that complies as an
egress window or note on the plans
that you are claiming exemption 1 of
IBC 1029.1.
F.1FE.4E
11'-81/4"11'-81/4"11'-01/4"308 310BEDROOM #2 BEDROOM #3
311B
Either provide a cutsheet on an
existing window in each bedroom that
shows it complies as an egress
window or note on the plans that you
are claiming exemption 1 of IBC
1029.1.
City of Aspen
Received
07/21/17
Building Department
Subject: PlanCheck
Page: 5
Checkmark: Unchecked
Author: justinh
File Name: 00.Plans.2017.02.28.pdf
Are these stone pavers the same as what
is shown in the approved plans for the
entire building or are they being replaced
along with other finishes?
Subject: PlanCheck
Page: 5
Checkmark: Unchecked
Author: justinh
File Name: 00.Plans.2017.02.28.pdf
Show any applicable sound mat and
finish materials in your flooring assembly.
C
@
C
@
W/ED
DER SLAB
COM SMO
STEE
T.O
RE
STRUCT.RE:META
STEE
FILL
COM
INSU
SCALE:A7.2 1 1/2" = 1'-0"
R-2 GREEN ROOF ASSEMBLY
W/
ED
DER SLAB
COM
SMO
STEE
T.O RE
STRUCT.RE:META
STEE
FILL COM
INSU
SCALE:A7.2 1 1/2" = 1'-0"
R-2 GREEN ROOF ASSEMBLY
Show any applicable sound mat and finish
materials in your flooring assembly.
City of Aspen
Received
07/21/17
Building Department