Loading...
HomeMy WebLinkAboutFile Documents.601 E Hyman Ave.0022.2017 (2).ARBKMarkup Summary Subject: PlanCheck Page: 3 Checkmark: Unchecked Author: justinh File Name: 00.Plans.2017.02.28.pdf Are there any other pieces of equipment being proposed here besides the washer/dryer and the AC unit shown in the mechanical plans? Fuel fired appliances cannot be located in storage closets per IMC 303.3 00.Plans.2017.02.28.pdf (8) Subject: PlanCheck Page: 3 Checkmark: Unchecked Author: justinh File Name: 00.Plans.2017.02.28.pdf Fill out a REMP worksheet for this hot tub or provide specs/cutsheets that demonstrate it is exempt from REMP: -self contained spa, 64 SF or less, and be certified by the CEC or APSP-14 -R12 value for the cover and be listed to ASTM F-1346 Provide structural verification that the roof deck will support the load of the hot tub. The previously approved plans for this level show a deck drain under the proposed hot tub. The north half of the deck drains to that location, show how you intend to maintain compliant drainage for this half of the deck. Subject: PlanCheck Page: 3 Checkmark: Unchecked Author: justinh File Name: 00.Plans.2017.02.28.pdf Provide a lighting plan and specs on all recessed lighting - IECC 402.4.5 all recessed luminaries in the building thermal envelope shall be sealed and IC rated Subject: PlanCheck Page: 3 Checkmark: Unchecked Author: justinh File Name: 00.Plans.2017.02.28.pdf The approved plans for the building show this as a fixed window. Either provide a cutsheet on a new window in this location that complies as an egress window or note on the plans that you are claiming exemption 1 of IBC 1029.1. Subject: PlanCheck Page: 3 Checkmark: Unchecked Author: justinh File Name: 00.Plans.2017.02.28.pdf Either provide a cutsheet on an existing window in each bedroom that shows it complies as an egress window or note on the plans that you are claiming exemption 1 of IBC 1029.1. Subject: PlanCheck Page: 5 Checkmark: Unchecked Author: justinh File Name: 00.Plans.2017.02.28.pdf Are you proposing a different ceiling finish than what is shown? 302B 302A 307A 306A 306B 307B W/D RDW 6'-3"35/8"4'-8"1'-6"6"1'-6"4'-0"2'-2"1'-6"4'-0"6'-9"5'-03/4"6"9"6'-0" T.F.F. 124'-63/4" ELECTRIC PANELLOCATION 301 302 303 304 306 307 BEDROOM #1 FOYERMECH./LAUNDRY GALLERY KITCHEN DINING BATH #1 Are there any other pieces of equipmentbeing proposed here besides thewasher/dryer and the AC unit shown in the mechanical plans? Fuel firedappliances cannot be located in storageclosets per IMC 303.3 5 4 3 2.3 2.22.12 1 321 D L ROOF DECK #1 HOTTUB Fill out a REMP worksheet for this hot tub or provide specs/cutsheets thatdemonstrate it is exempt from REMP:-self contained spa, 64 SF or less, and be certified by the CEC or APSP-14-R12 value for the cover and be listed to ASTM F-1346 Provide structural verification that the roof deck will support the load of the hot tub. The previously approved plans for this level show a deck drain under theproposed hot tub. The north half of the deck drains to that location, showhow you intend to maintain compliant drainage for this half of the deck. GENERAL NOTES 1. PER IECC2009.404.1, A MINIMUM OF 50 PERCENT OF THE LAMPS IN PERMANENTLY INSTLALLED LIGHTING FIXTURES SHALL BE HIGH-EFFICANCY LAMPS. Provide a lighting plan and specson all recessed lighting - IECC 402.4.5 all recessed luminaries inthe building thermal envelope shall be sealed and IC rated 307A 306B 6'-3"35/8"306 307 BEDROOM #1 BATH #1 The approved plans for the building show this as a fixed window. Either provide a cutsheet on a new window in this location that complies as an egress window or note on the plans that you are claiming exemption 1 of IBC 1029.1. F.1FE.4E 11'-81/4"11'-81/4"11'-01/4"308 310BEDROOM #2 BEDROOM #3 311B Either provide a cutsheet on an existing window in each bedroom that shows it complies as an egress window or note on the plans that you are claiming exemption 1 of IBC 1029.1. City of Aspen Received 07/21/17 Building Department Subject: PlanCheck Page: 5 Checkmark: Unchecked Author: justinh File Name: 00.Plans.2017.02.28.pdf Are these stone pavers the same as what is shown in the approved plans for the entire building or are they being replaced along with other finishes? Subject: PlanCheck Page: 5 Checkmark: Unchecked Author: justinh File Name: 00.Plans.2017.02.28.pdf Show any applicable sound mat and finish materials in your flooring assembly. C @ C @ W/ED DER SLAB COM SMO STEE T.O RE STRUCT.RE:META STEE FILL COM INSU SCALE:A7.2 1 1/2" = 1'-0" R-2 GREEN ROOF ASSEMBLY W/ ED DER SLAB COM SMO STEE T.O RE STRUCT.RE:META STEE FILL COM INSU SCALE:A7.2 1 1/2" = 1'-0" R-2 GREEN ROOF ASSEMBLY Show any applicable sound mat and finish materials in your flooring assembly. City of Aspen Received 07/21/17 Building Department