Loading...
HomeMy WebLinkAboutFile Documents.601 E Hyman Ave.0022.2017 (3).ARBK022.2017.ARBK_Zoning_1 Page: 3 Checkmark: Unchecked Author: jimp File Name: 00.Plans.2017.02.28.pdf Please show how this hot tub meets the height and setback requirements of 26.575.020.F.4.l), Permanent Rooftop Amenities. 00.Plans.2017.02.28.pdf (4) Page: 4 Checkmark: Unchecked Author: jimp File Name: 00.Plans.2017.02.28.pdf 17'-6" Page: 4 Checkmark: Unchecked Author: jimp File Name: 00.Plans.2017.02.28.pdf 7'-8 1/2" Page: 4 Checkmark: Unchecked Author: jimp File Name: 00.Plans.2017.02.28.pdf Show how this vent meets the setback requirement for a mixed-use building in 26.575.020.F.4.a), Chimneys, flues, and similar venting apparatus. HOT TUB Please show how this hot tub meets the height and setback requirements of 26.575.020.F.4.l), Permanent Rooftop Amenities. 17'-6"7'-8 1/2"NEW FIREPLACEVENT CAP ON TOP OF8" HIGH CURB Part No. XG1302 - 101201.2Page 4 Part No. XG1302 - 101201.2Page 4 Show how this ventmeets the setback requirement for amixed-use building in26.575.020.F.4.a), Chimneys, flues, andsimilar ventingapparatus. City of Aspen Received 07/21/17 Building Department