HomeMy WebLinkAboutFile Documents.601 E Hyman Ave.0022.2017 (3).ARBK022.2017.ARBK_Zoning_1
Page: 3
Checkmark: Unchecked
Author: jimp
File Name: 00.Plans.2017.02.28.pdf
Please show how this hot tub meets the
height and setback requirements of
26.575.020.F.4.l), Permanent Rooftop
Amenities.
00.Plans.2017.02.28.pdf (4)
Page: 4
Checkmark: Unchecked
Author: jimp
File Name: 00.Plans.2017.02.28.pdf
17'-6"
Page: 4
Checkmark: Unchecked
Author: jimp
File Name: 00.Plans.2017.02.28.pdf
7'-8 1/2"
Page: 4
Checkmark: Unchecked
Author: jimp
File Name: 00.Plans.2017.02.28.pdf
Show how this vent meets the setback
requirement for a mixed-use building in
26.575.020.F.4.a), Chimneys, flues, and
similar venting apparatus.
HOT
TUB
Please show how this hot tub
meets the height and setback
requirements of 26.575.020.F.4.l),
Permanent Rooftop Amenities.
17'-6"7'-8 1/2"NEW FIREPLACEVENT CAP ON TOP OF8" HIGH CURB Part No. XG1302 - 101201.2Page 4
Part No. XG1302 - 101201.2Page 4
Show how this ventmeets the setback
requirement for amixed-use building in26.575.020.F.4.a),
Chimneys, flues, andsimilar ventingapparatus.
City of Aspen
Received
07/21/17
Building Department