HomeMy WebLinkAboutFile Documents.601 E Hyman Ave.0022.2017 (10).ARBK 1 July 18, 2017 Kevin Michelson City of Aspen Building Department Victorian Square Penthouse 0022.2017.ARBK Response Narrative Original submitted plans were dated 03.03.2017. Modifications in response to comments are described below: • Roof Chimneys/Vents – The fireplace and kitchen hood terminations on the roof have been relocated to a minimum of 20’ from the street facing building facades. • Mech. Room – The Mechanical equipment now has a dedicated closet, separate from the laundry. No fuel fired appliances are to be located in the mechanical room. The mechanical drawings indicate the proposed equipment for the space. • Hot Tub – The proposed Hot Tub has been removed from the design. Sheet A-103 has been revised accordingly. Please remove the previous submitted REMP form dated 03.03.2017. • Recessed Lighting – The general notes on Sheet A-103 has been modified to include a note concerning recessed luminaires to comply with IECC2009.402.4.5. • Egress Window (Bedroom #1) – The windows in this space have been modified from the originally submitted plans for the building to include an operable window that meets egress requirements. Either way, a note has been added to Sheet A-103 identifying the bedroom as excepted from the egress requirements per IBC 1029.1. • Egress Windows (Bedroom #2 & #3) – Operable windows that meet egress requirements are included in the originally submitted plans for the building and are currently installed in the building. • Floor/Roof Assemblies – Modifications as described below: o R1 –Ceiling finish has been modified to a Level 4 finish. o R3 – The stone pavers indicated on the plan are to be installed per the originally submitted plans for the building. The stone pavers will not be removed or replaced. o F2 – The finished flooring assembly has been modified above the concrete slab to include a Warmboard plywood product, vapor barrier, and the finished flooring material as shown on the plans. • Occupancy Group – The occupancy group indicated on the project information section on Sheet 1-Cover has been modified to (shared egress) R-2. Please contact our office with any questions. Respectfully, Kevin Michelson No. DATE BY TO PROJECT SUBJECT COMMENTS City of Aspen Received 07/21/17 Building Department