Construction Management Plan
601 E. Hyman Ave
1. Project Introduction
1.1. Approximately one thousand, six hundred (1,600) square feet of interior tenant
finish will occur. This includes building out the lower level unit of the Victorian
Square building located at 601 E. Hyman Ave. Short term material staging and
drop offs will be located in 2 reserved parking spaces off Hunter St. and overflow
delivery and short term staging on the south side of the building in the alley
access and long term storage will be in the space itself.
1.2. Vicinity Map:
Qa Qa
1.3. The property contains a mixed use building located in downtown Aspen
neighboring to the Muse building on the corner of Hyman and Hunter. There are
existing occupied tenant spaces on the main level to this proposed build out
space along with storage space units for and existing penthouse unit in the
basement. The scope of this tenant finish will be completed in 1 phase. We
anticipate starting the project in mid to late October with the expectation of total
project buildout taking no more than 8 weeks. This building is serviced by public
utilities. There are no plans for upgrading any of the utility services.
09/26/2018
2. Project Documentation
2.1. Adjacent properties will be notified of work and provided contact information via
the posting of the project sign, and the immediate neighbors will be notified of
this construction and informed on an as need basis of possible construction
impacts. This sign will include a brief scope of work and list contractor’s contact
information. Because impacts beyond the licensed ROW area are not
anticipated, specific notification and on-site meeting should not be necessary.
2.2. A project sign will be posted on the entry door of the building with the
contractor's contact information.
2.3. Contact List:
Owner: Garfield and Hecht PC, 970-925-1936
General Contractor: G.F.Woods Construction, Greg Woods (970) 544-1833 /
(970) 948-6483
Site Supervisor: Eric Wynne (970) 319-6938
Safety Officer: Eric Wynne (970) 319-6938
Traffic Officer: Eric Wynne (970) 319-6938
3. Project Implementation
3.1. Dates of Construction: Construction is expected to last 8 weeks (October 15,
2018 – December 10, 2017) and will only occur on approved dates Monday
through Saturday.
3.2. Hours of Construction: Construction activity will only occur during the allowed
hours of 7:30AM and 5:30PM Mon - Friday and 9AM to 5PM on Saturdays.
3.3. Excavation will not occur or encroach within 5’ of the property line.
3.4. Project is all interior scope so no job site fencing will be installed.
3.5. Project shall uphold utmost respect for public health and welfare.
4. Project Management
4.1. Parking for subcontractors and GF Woods Construction employees will be
limited to street parking. Two reserved parking spaces will be acquired on
Hunter St. adjacent to the building access. Temporary material staging will be
utilized in the requested parking spaces and overflow staging and drop off
located on the south side of the building in the alley as well. These areas are
represented on the Construction Management Plan (Exhibit A).
4.2. Parking at the site is limited and is all metered. Carpooling and public transit will
be encouraged and utilized to the greatest extent practicable.
4.3. Map of Construction Management Plan is attached as Exhibit A.
5. Traffic Control
5.1. Traffic Control Supervisor will manage operations, if and when necessary.
5.2. Designated haul routes will be followed. Exhibit B
5.3. Maximum vehicle weight shall not exceed 10,000lbs.
5.4. Any traffic control required for deliveries will be coordinated with the City of
Aspen Engineering Department. Deliveries will not be scheduled outside of the
approved hours of construction. No more than one delivery truck can be
accommodated at any time. Deliveries will be unloaded via the entry doors on
the Hyman Ave in early morning hours or through the alleyway to the south of
the building.
5.5. A Traffic Control Plan is not included as road blockages or traffic stoppages are
not scheduled or anticipated due to the limited scope and nature of the project.
09/26/2018
6. Pedestrian Protection
6.1. Pedestrian safety will be maintained per City Code Section 21.04.060, MUTCD
Chapter 6D, the Americans with Disability Act, and IBC Chapter 33.
7. Sediment and Erosion Control – NA
8. Fugitive Dust Control – N/A.
9. Emissions – All construction vehicles will be maintained and in good running order.
10. Noise Suppression
10.1. Construction noise will be limited to 80 decibels at the property line whenever
possible. And are not expected to be a concern with all construction activity
contained indoors.
10.2. Loud or obtrusive work will be completed during the approved hours of 9AM to
5PM (Monday through Friday only). Neighbors will be notified 3 days advance.
09/26/2018
VICTORIAN SQUARE - 601 E. HYMAN - CMP SITE PLAN EXHIBIT A
Reserved parking and stagingoff Hunter St.Main Construction
Access
09/26/2018
E MAIN
S
T
W MAI
N
S
T
E DURA
N
T
A
V
E
E HOP
K
I
N
S
A
V
E
GI
B
S
O
N
A
V
E
E COO
P
E
R
A
V
E
W HAL
L
A
M
S
T
W BLE
E
K
E
R
S
T N THIRD STS ASPEN STW FRA
N
C
I
S
S
T
N FIFTH STW HOP
K
I
N
S
A
V
E N MILL STNORTH
S
T
N SIXTH STW SMU
G
G
L
E
R
S
T
N FOURTH STS MONARCH STPARK AVES MILL STR
E
D
M
T
N
R
D
N FIRST STS ORIGINAL STLAKE AVEN SECOND STS GARMISCH STLO
N
E
P
I
N
E
R
D
O
A
K
L
N
S HUNTER STS WEST END STE BLEE
K
E
R
S
T N SPRING STNEALE AVEVINE ST
S FIRST STSHADY LNMIDLAND AVEE HYM
A
N
A
V
E
S GALENA STGILLESPIE AVE
W HYM
A
N
A
V
E
DEAN
S
T
KIN
G
S
T
RI
O
G
R
A
N
D
E
P
LN EIGHTH STS SPRUCE STMA
P
L
E
L
N
PARK CIRN GARMISCH STRACE STE HALL
A
M
S
T
WATER
S
A
V
EN ASPEN STS THIRD STN SPRUCE ST
TEAL CTA
J
A
X
A
V
ENICHOLAS
LN
W COO
P
E
R
A
V
E
JUAN S
T WILLIAMS WYASPEN MTN
R
DPUPPY SM
ITH
ST
QUEEN ST
CLEVELAND STLACET LN
FOUN
D
E
R
S
P
L
A
C
E
C
O
T
T
O
NW
O
O
D
L
N
S RIVERSIDE AVEN SEVENTH STPEARL CT
SOUTH AVE
SUMMI
T
S
T
GILBE
R
T
S
TS FIFTH STS SIXTH STW NO
R
T
H
S
T
S FOURTH STS SPRING STN RIVERSIDE AVES SPRING STDEAN S
T S GALENA STN SEVENTH STP
A
R
K
C
I
R
DEAN S
TS MILL STASPEN MTN RDMap prepared by Engineering and GIS Department
City of Aspen, CO 81611 May 4,2007
0 600300
Feet
Legend
Designated Heavy Haul Route
Roads
Parcels
City Boundary
OFFICIAL HEAVY HAUL ROUTE MAP
Exhibit B
09/26/2018