HomeMy WebLinkAboutFile Documents.601 E Hyman Ave.0096.2018 (6).ACBK Construction Management Plan 601 E. Hyman Ave 1. Project Introduction 1.1. Approximately one thousand, six hundred (1,600) square feet of interior tenant finish will occur. This includes building out the lower level unit of the Victorian Square building located at 601 E. Hyman Ave. Short term material staging and drop offs will be located in 2 reserved parking spaces off Hunter St. and overflow delivery and short term staging on the south side of the building in the alley access and long term storage will be in the space itself. 1.2. Vicinity Map: Qa Qa 1.3. The property contains a mixed use building located in downtown Aspen neighboring to the Muse building on the corner of Hyman and Hunter. There are existing occupied tenant spaces on the main level to this proposed build out space along with storage space units for and existing penthouse unit in the basement. The scope of this tenant finish will be completed in 1 phase. We anticipate starting the project in mid to late October with the expectation of total project buildout taking no more than 8 weeks. This building is serviced by public utilities. There are no plans for upgrading any of the utility services. 09/26/2018 2. Project Documentation 2.1. Adjacent properties will be notified of work and provided contact information via the posting of the project sign, and the immediate neighbors will be notified of this construction and informed on an as need basis of possible construction impacts. This sign will include a brief scope of work and list contractor’s contact information. Because impacts beyond the licensed ROW area are not anticipated, specific notification and on-site meeting should not be necessary. 2.2. A project sign will be posted on the entry door of the building with the contractor's contact information. 2.3. Contact List: Owner: Garfield and Hecht PC, 970-925-1936 General Contractor: G.F.Woods Construction, Greg Woods (970) 544-1833 / (970) 948-6483 Site Supervisor: Eric Wynne (970) 319-6938 Safety Officer: Eric Wynne (970) 319-6938 Traffic Officer: Eric Wynne (970) 319-6938 3. Project Implementation 3.1. Dates of Construction: Construction is expected to last 8 weeks (October 15, 2018 – December 10, 2017) and will only occur on approved dates Monday through Saturday. 3.2. Hours of Construction: Construction activity will only occur during the allowed hours of 7:30AM and 5:30PM Mon - Friday and 9AM to 5PM on Saturdays. 3.3. Excavation will not occur or encroach within 5’ of the property line. 3.4. Project is all interior scope so no job site fencing will be installed. 3.5. Project shall uphold utmost respect for public health and welfare. 4. Project Management 4.1. Parking for subcontractors and GF Woods Construction employees will be limited to street parking. Two reserved parking spaces will be acquired on Hunter St. adjacent to the building access. Temporary material staging will be utilized in the requested parking spaces and overflow staging and drop off located on the south side of the building in the alley as well. These areas are represented on the Construction Management Plan (Exhibit A). 4.2. Parking at the site is limited and is all metered. Carpooling and public transit will be encouraged and utilized to the greatest extent practicable. 4.3. Map of Construction Management Plan is attached as Exhibit A. 5. Traffic Control 5.1. Traffic Control Supervisor will manage operations, if and when necessary. 5.2. Designated haul routes will be followed. Exhibit B 5.3. Maximum vehicle weight shall not exceed 10,000lbs. 5.4. Any traffic control required for deliveries will be coordinated with the City of Aspen Engineering Department. Deliveries will not be scheduled outside of the approved hours of construction. No more than one delivery truck can be accommodated at any time. Deliveries will be unloaded via the entry doors on the Hyman Ave in early morning hours or through the alleyway to the south of the building. 5.5. A Traffic Control Plan is not included as road blockages or traffic stoppages are not scheduled or anticipated due to the limited scope and nature of the project. 09/26/2018 6. Pedestrian Protection 6.1. Pedestrian safety will be maintained per City Code Section 21.04.060, MUTCD Chapter 6D, the Americans with Disability Act, and IBC Chapter 33. 7. Sediment and Erosion Control – NA 8. Fugitive Dust Control – N/A. 9. Emissions – All construction vehicles will be maintained and in good running order. 10. Noise Suppression 10.1. Construction noise will be limited to 80 decibels at the property line whenever possible. And are not expected to be a concern with all construction activity contained indoors. 10.2. Loud or obtrusive work will be completed during the approved hours of 9AM to 5PM (Monday through Friday only). Neighbors will be notified 3 days advance. 09/26/2018 VICTORIAN SQUARE - 601 E. HYMAN - CMP SITE PLAN EXHIBIT A Reserved parking and stagingoff Hunter St.Main Construction Access 09/26/2018 E MAIN S T W MAI N S T E DURA N T A V E E HOP K I N S A V E GI B S O N A V E E COO P E R A V E W HAL L A M S T W BLE E K E R S T N THIRD STS ASPEN STW FRA N C I S S T N FIFTH STW HOP K I N S A V E N MILL STNORTH S T N SIXTH STW SMU G G L E R S T N FOURTH STS MONARCH STPARK AVES MILL STR E D M T N R D N FIRST STS ORIGINAL STLAKE AVEN SECOND STS GARMISCH STLO N E P I N E R D O A K L N S HUNTER STS WEST END STE BLEE K E R S T N SPRING STNEALE AVEVINE ST S FIRST STSHADY LNMIDLAND AVEE HYM A N A V E S GALENA STGILLESPIE AVE W HYM A N A V E DEAN S T KIN G S T RI O G R A N D E P LN EIGHTH STS SPRUCE STMA P L E L N PARK CIRN GARMISCH STRACE STE HALL A M S T WATER S A V EN ASPEN STS THIRD STN SPRUCE ST TEAL CTA J A X A V ENICHOLAS LN W COO P E R A V E JUAN S T WILLIAMS WYASPEN MTN R DPUPPY SM ITH ST QUEEN ST CLEVELAND STLACET LN FOUN D E R S P L A C E C O T T O NW O O D L N S RIVERSIDE AVEN SEVENTH STPEARL CT SOUTH AVE SUMMI T S T GILBE R T S TS FIFTH STS SIXTH STW NO R T H S T S FOURTH STS SPRING STN RIVERSIDE AVES SPRING STDEAN S T S GALENA STN SEVENTH STP A R K C I R DEAN S TS MILL STASPEN MTN RDMap prepared by Engineering and GIS Department City of Aspen, CO 81611 May 4,2007 0 600300 Feet Legend Designated Heavy Haul Route Roads Parcels City Boundary OFFICIAL HEAVY HAUL ROUTE MAP Exhibit B 09/26/2018