Loading...
HomeMy WebLinkAboutFile Documents.601 E Hyman Ave.0096.2018 (5).ACBK Page 1 of 1 ALTENATE MEANS OF COMPLIANCE REQUEST Project: 21503.70 – 601 E Hyman – Pilates Studio Subject: WC Requirement Date: 15 October 2018 Stephen Kanipe, We propose using the second floor restroom as the second required water closet for the proposed pilates studio. The pilates studio will be located in the basement where there is already one existing, accessible restroom. The second, upstairs restroom is accessible via elevator and is currently open to the occupants. Please reach out with any questions or comments. Thank you, Bryan May Rowland + Broughton 10/16/2018