HomeMy WebLinkAboutFile Documents.601 E Hyman Ave.0096.2018 (5).ACBK
Page 1 of 1
ALTENATE MEANS OF COMPLIANCE REQUEST
Project: 21503.70 – 601 E Hyman – Pilates Studio
Subject: WC Requirement
Date: 15 October 2018
Stephen Kanipe,
We propose using the second floor restroom as the second required water closet for the proposed
pilates studio. The pilates studio will be located in the basement where there is already one existing,
accessible restroom. The second, upstairs restroom is accessible via elevator and is currently open to
the occupants.
Please reach out with any questions or comments.
Thank you,
Bryan May
Rowland + Broughton
10/16/2018