Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.590 N Mill St.0077.2017.ACBK
BuildingComment2 Subject: PlanCheck Page: A-1.03 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Elevator to be be proposed in Phase III of Old Powerhouse project scope. NA for Phase II permit submission. When the second floor of this building was remodeled earlier this year the installation of an elevator was brought up to improve accessible access to the second floor. At that point it was decided that the elevator would be addressed when the first floor was remodeled, is that no longer the case? 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf (16) Subject: PlanCheck Page: A-1.03 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Sprinklers to be installed in Phase III of Old Powerhouse project scope. NA for Phase II permit submission. Are fire sprinklers going to be installed under this scope of work? This building should be sprinklered per local amendment to IFC 903.2 (COA 8.50.010 - resolution No. 6-1 series of 2016 item n). Subject: PlanCheck Page: A-1.03 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Per 8/13/17 Meeting between Denis Murray & Jeff Pendarvis of City of Aspen Asset Management Department, One drinking fountain as specified to be installed at ANSI / ICC dimensions for accessibility compliance. A drinking cup dispenser will also be provided accordingly. Two drinking fountains, one for standing persons and one for people using wheelchairs, are required per IBC 1109.5. See ICC A117.1-2000 sec 602 for the requirements of the wheelchair accessible drinking fountain. Alternatively, exception 1 to 1109.5 allows a single drinking fountain with two separate spouts that comply with the requirements for wheelchair and standing use to satisfy this requirement. Subject: PlanCheck Page: A-7.01 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Plan & Interior elevation drawings & applicable details revised to reflect 33" to 36" min grab bar location above finished floor. Grab bars must be located 33"-36" above the floor. Revise in all applicable details. Subject: PlanCheck Page: A-7.01 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Dispenser height notations and applicable details revised to reflect max. side reach height of 48". Maximum unobstructed side reach height is 48" per 308.3.1 of ICC A117.1-2009. Revise this note and dimension the dispenser height on your details. E-6 E-7 E-8 E-9 62'-6" 9'-914"3'-114"6'-10"3'-114"6'-1012"3'-114"6'-1114"3'-114"6' WOMEN'S RESTROOM R.O.R.O.R.O.R.O. WORKSTATION WORKSTATION A7.01 21201918 A7.01 17161514 9 10 6 7 8 (Sarah & Liz Existing)(Amy New) When the second floor of this building was remodeled earlier this year the installation of an elevator was brought up to improve accessible access to the second floor. At that point it was decided that the elevator would be addressed when the first floor was remodeled, is that no longer the case? E-9 E-10 6'-1114"3'-114"6'-10"3'-114"9'-834" R.O.R.O. KSTATION WORKSTATION M-109-E M-109-F (Julia Existing) & Liz Existing) Are fire sprinklers going to be installed under this scope of work? This building should be sprinklered per local amendment to IFC 903.2 (COA 8.50.010 - resolution No. 6-1 series of 2016 item n). E-6 38'-0" 9'-914"3'-114"6'-10" CORRIDOR M-101 STORAGE M-106 RECEIVING M-103 SHOP M-105 WOMEN'S RESTROOM M-108 R.O. 103A Receiving 103 existing9' double door to beremoved / framing &drywall infill to matchexisting conditions. Fullheight wall construction 18'-1"10'-412"812"3'-2"6'-6"R.O.Existing gallerydouble doors to beremoved WORKS M-1 A7.01 21201918 A7.0117161514 A7.01 1 3 1 9 10 6 7 8 4 5 2 2'-6" x 8'-0" areaof wall partition to removed fromWomen'sRestroom M-108 inorder to meet ADA18" clearance on p side of door accesrequirement 2'-6" x 8'-0" area 11 New drinking Fountainwith Bottle Filler. ADACompliant per IBC 13 (Amy Two drinking fountains, one for standing persons and one for people using wheelchairs, are required per IBC 1109.5. See ICC A117.1-2000 sec 602 for the requirements of the wheelchair accessible drinking fountain. Alternatively, exception 1 to 1109.5 allows a single drinking fountain with two separate spouts that comply with the requirements forwheelchair and standing use to satisfy this requirement. Grab bars must be located 33"-36" above the floor. Revise in all applicable details. GENERAL 1. REFER 2. REFER 3. REFERHEZ ARCHITECT, 2017B A7. Maximum unobstructed side reach height is 48" per 308.3.1 of ICC A117.1-2009. Revise this note and dimension the dispenser height on your details. Subject: PlanCheck Page: A-7.01 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Changing station height notation and applicable details, dimensions revised to reflect height between 28" min. and 34" max. The height of the changing station needs to be between 28"-34" per 603.5 ICC A117.1-2009, revise this note and the dimensions on the details. Subject: PlanCheck Page: A-7.01 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Grab bar details and notations have been revised to reflect a min. height of 33" and max. height of 36" on all notation and applicable detail information. Grab bars must be located 33"-36" above the floor. Revise in all applicable details. Subject: PlanCheck Page: A-7.01 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Vertical Grab Bar details & notations have been added to comply with ICC A117.1-2009 requirements. Vertical grab req'd per 604.5.1 of ICC A117.1-2009. Subject: PlanCheck Page: A-7.01 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Vertical Grab Bar details & notations have been added to comply with ICC A117.1-2009 requirements. Vertical grab req'd per 604.5.1 of ICC A117.1-2009. Subject: PlanCheck Page: A-7.01 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Men's & Women's bathroom Stall hinging revised to initiate from the corner of the stall opposite per 1CC A117.1-2009 in and plan and detail information. The door to the accessible stall in both the men's and women's bathroom must hinge from the corner of the stall opposite the toilet per ICC A117.1-2009 section 604.9.3.1. See figure 604.9.3.1 for more information and examples. GENERAL NOTES:1. REFER TO LIGHTING PLAN FOR LIGHT FIXTURE TYPES2. REFER TO SPECIFICATIONS FOR FINISH MATERIAL DEFINITONS 3. REFER TO MECHANICAL DRAWINGS FOR MECHNICAL EQUIPMENT SPECIFICATIONS AND DETAILS. 4. REFER TO REFLECTED CEILING PLAN FOR CEILING HEIGHTS5. ALL THERMOSTATS TO BE HIDDEN FROM VIEW. PLACE IN BUILT-INS OR CLOSETS. U.N.O. ALL SENSORS TO BE HIDDEN. 6. ALL DIMENSIONS ARE TO FACE OF FINISH MATERIAL7. FIRE SUPPRESION DEVICES ARE SHOWN IN DESIRED LOCATIONSONLY. EXACT NUMBERS AND LOCATIONS TO BE DETERMINED BY CONTRACTOR PER APPLICABLE CODES. CONTRACTOR TO COORDINATE FINAL LOCATIONSWITH DESIGNERc GILBERT SANCHEZ ARCHITECT, 2017B A7.01 MENS BATHROOM : M-1 SCALE : 3/8" = 1'-0" The height of the changing station needs to be between 28"-34" per 603.5 ICC A117.1-2009, revise this note and the dimensions on the details. Grab bars must be located 33"-36" above the floor. Revise in all applicable details. WI Asp Chri PO Asp T: 9 www asp GE Co Ca Asp 130 Asp T: 9 ww Vertical grab req'd per 604.5.1 of ICC A117.1-2009. ISSUANC DRAWIN DRAWIN PROJEC SCALE 01 AUGUS FLOO & INT ELEV Vertical grab req'd per 604.5.1 of ICC A117.1-2009. The door to the accessible stall in both the men's and women's bathroom must hinge from the corner of the stall opposite the toilet per ICC A117.1-2009 section 604.9.3.1. See figure 604.9.3.1 for more information and examples. Subject: PlanCheck Page: A-7.01 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Forward approach information has been revised to state an area of 30" x 48", not 36" x 48" for both men's and women's bathroom areas. Forward approach requires a 30"x48" clear space, not 36" wide. Please revise this note as well as the details for both men's and women's bathrooms. Subject: PlanCheck Page: A-7.01 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Sink controls to be reset per existing conditions. Lavatory sinks to be re-used for Phase II retrofit. Phase III will require all lavatory sink controls to comply with 309 ICC A117.1-2009. Provide more information on the sink controls to show they comply with the requirements of 309 of ICC A117.1-2009. Subject: PlanCheck Page: A-7.01 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Toilet flush controls to be reset per existing conditions. Lavatory sinks to be re- used for Phase II retrofit. Phase III will require all toilet flush controls to comply with 309 ICC A117.1-2009. Provide more information on the flush controls of the existing toilets to show they comply with the requirements of 309 ICC A117.1-2009. Subject: PlanCheck Page: A-7.01 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Men's & Women's bathroom Stall hinging revised to initiate from the corner of the stall opposite per 1CC A117.1-2009 in and plan and detail information. Similar to the women's bathroom, this door must hinge from the corner of the stall opposite the toilet per ICC A117.1-2009 sec 604.9.3.1. Subject: PlanCheck Page: E1.0 Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Electrical Plan E1.0 has been revised to include notation stating all lighting to remain "as is" and existing halogen bulbs to be exchanged with LED lighting per specified notation. Energy anticipated to be reduced by a factor of 5 times in reduced usage. ComCheck information to be provided by MKK Engineering. Provide a lighting ComCheck for all spaces where lighting is being altered. The ComCheck needs to include both existing to remain and new lighting in the altered spaces. Submit cutsheets on all lighting fixtures highlighting maximum fixture wattage and NRTL listing. The cutsheet provided for the Edison Style pendant fixture does not specify maximum fixture wattage, this information is a requirement. A A7.0 Forward approach requires a 30"x48" clear space, not 36" wide. Please revise this note as well as the details for both men's and women's bathrooms. Provide more information on the sink controls to show they comply with the requirements of 309 of ICC A117.1-2009. Provide more information on the flush controls of the existing toilets to show they comply with the requirements of 309 ICC A117.1-2009. Similar to the women's bathroom, this door must hinge from the corner of the stall opposite the toilet per ICC A117.1-2009 sec 604.9.3.1. 4.0 3.0 5.0 6.0 1.0 2.0 I.0H.0G.0F.0 J.0E.0D.0C.0B.0A.0 I.0H.0G.0F.0 J.0E.0D.0C.0B.0A.0 4.0 3.0 5.0 6.0 1.0 2.0 FLAG NOTES (THIS SHEET):1. INSTALL DECORATIVE PENDANT FIXTURE OVER CONFERENCE ROOMTABLE. PROVIDE 6 PENDANT FIXTURES TOTAL. EDISON LIGHT GLOBES,E26 BAKELITE PENDANT, LARGE TEARDROP FILAMENT LAMP, 6W LED.8' TO 10' CABLE LENGTH. COORDINATE INSTALLATION, EXACT CABLELENGTHS, AND LOCATION WITH ARCHITECT.2. ALL EXISTING TRACK LIGHT FIXTURES SHOWN IN LIGHT LINEWEIGHTAND ARE TO BE PROVIDED WITH NEW 22W LED PAR LAMP. REMOVEEXISTING INCANDESCENT LAMP AND INSTALL THE LED LAMPS. FINALFIXTURE AIMING PER OWNER'S REQUEST. VERIFY EXISTING LAMPTYPE. SUBMIT SELECTED LAMP TYPE TO ENGINEER FOR APPROVAL.VERIFY EXACT QUANTITY OF LAMPS REQUIRED. 3. REPLACE LIGHT FIXTURES IN RESTROOM WITH SIMILAR TYPE WITHLED LAMP IN SAME LOCATION.JENTRYM-100 CORRIDORM-101 STORAGEM-106 OFFICEM-102 MECHANICALM-104 RECEIVINGM-103 SHOPM-105 MEN'S RESTROOMM-107 WOMEN'S RESTROOMM-108 WORKSTATION WORKSTATION WORKSTATION WORKSTATIONM-109-A WORKSTATION WORKSTATION OFFICEM-110 CONFERENCE M-109-B M-109-C M-109-D M-109-E M-109-F M-109-G FILE ROOMM-109-H MEETINGM-109-I JJJJJJJJJJJJJJJJJJJJJJJJ J J J J J J J J J JJ GENERAL NOTES:A. DEVICES SHOWN IN LIGHT LINE WEIGHT ARE EXISTING TO REMAIN,UNLESS NOTED OTHERWISE. DEVICES SHOWN IN HEAVY LINE WEIGHTARE NEW, UNLESS NOTED OTHERWISE. B. ALL LIGHT FIXTURES SHOWN ARE EXISTING TO REMAIN EXCEPT FORNEW LIGHTING IN CONFERENCE ROOM AND REST ROOMS. J J1 J 3 3 2TYP. ALL TRACK FIXTURES 2 1 1 1 1 1 ISSUANCE SEAL DRAWING NO: DRAWING TITLE:PROJECT #SCALE DATE 590 MILL - OP 01AUGUST 2017 PERMIT ISSUE c GILBERT SANCHEZ ARCHITECT, 2017OLD POWERHOUSE INTERIORPHASE ii MODIFICATIONSACRA590 North Mill Street , Aspen , CO 81611©2017 GILBERT SANCHEZ ARCHITECT . THE INFORMATION AND DESIGN INTENT CONTAINED ON THIS DOCUMENT IS THE PROPERTY OF GILBERT SANCHEZ ARCHITECT. NO PART OF THIS INFORMATION MAY BE USED OR COPIED WITHOUT THE PRIOR WRITTEN PERMISSION OF GILBERT SANCHEZ ARCHITECT. GILBERT SANCHEZ ARCHITECT SHALL RETAIN ALL COMMON LAW STATUTORY AND ALL OTHER RESERVED RIGHTS, INCLUDING COPYRIGHT THERETO. ALL RIGHTS RESERVEDa r c h i t e c t3 0 0 s o u t h s p r i n g s t r e e t , s u i t e 1 0 2 . a s p e n, c o 8 1 6 1 1g r s a n c h e z a i a @ g m a i l . c o m 9 7 0 . 9 4 8 . 0 5 9 7 ( m )DATE OF SHEET ISSUE: AUGUST . 2017 . INTERIORS gilbert r sanchez , aiaWINDOW RESTORATION Aspen Preservation Company LLCChris Thompson, OwnerPO BOX 1814Aspen, Colorado 81612T: 908.907.1600www.houzz /aspenpreservationcompany.com MEP ENGINEERMKK Consulting Engineers Inc.7600 East Orchard Road, Suite 250-SGreenwood Village, CO 80111T: 303.796.6000www.mkkeng.com GENERAL CONTRACTORContractor per City of AspenCapital Asset DepartmentAspen City Hall130 South Galena Street, 2nd FloorAspen, Colorado 81611T: 970.429.2786www.aspenpitkin.com SCALE: NORTH ELECTRICAL LIGHTING PLAN3/16" = 1'-0"1 E1.0 ELECTRICALLIGHTING PLAN Provide a lighting ComCheck for all spaces where lighting is beingaltered. The ComCheck needs to include both existing to remainand new lighting in the altered spaces. Submit cutsheets on alllighting fixtures highlighting maximum fixture wattage and NRTLlisting. The cutsheet provided for the Edison Style pendant fixturedoes not specify maximum fixture wattage, this information is arequirement. Subject: PlanCheck Page: Survey Author: justinh File Name: 590MILL-ACRA-Phase II_Permit Set_8-16-2017.pdf RE: Detailed parking plan layout provided to describe location of accessible parking space per IBC 1106.1 on survey sheet / existing site plan as provided. You must provide a van accessible parking space per IBC 1106.1.You must provide a van accessible parking space per IBC 1106.1.