Loading...
HomeMy WebLinkAboutFile Documents.590 N Mill St.0077.2017 (6).ACBKCOMcheck Software Version 4.0.5.5 Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Construction Site: 590 N Mill Aspen, CO 81611 Owner/Agent: City of Aspen 130 S Galena St Aspen, CO 81611 Designer/Contractor: MKK Consulting Engineers Inc 7600 E Orchard RD Suite 250-S Greenwood Village, CO 80111 Project Information Energy Code: Unspecified Additional Efficiency Package Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-Common Space Types:Office - Open Plan 2258 0.98 2213 2-Common Space Types:Office - Enclosed 166 1.11 184 3-Common Space Types:Restrooms 320 0.98 314 2711Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures 1-Common Space Types:Office - Open Plan Track lighting 1: 15 amp breaker: 55x25W trackheads,: Wattage based on circuit breaker capacity (15 amps x 120 volts) 0 0 0 1800 LED 4: pendant light: Other:1 6 6 36 2-Common Space Types:Office - Enclosed LED 1: LED A Lamp 25W:1 6 25 150 3-Common Space Types:Restrooms LED 2: LED A: Other:1 2 53 106 LED 3: LED B: Other:1 2 33 66 2158Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.5.5 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Interior Lighting PASSES: Design 20% better than code Project Title: Data filename:M:\city\building permits & plans\2017\0077.2017.ACBK\ComCheck.cck 09/14/17Report date: 61 ofPage Name - Title Signature Date Project Title: Data filename:M:\city\building permits & plans\2017\0077.2017.ACBK\ComCheck.cck 09/14/17Report date: 62 ofPage Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version 4.0.5.5 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:M:\city\building permits & plans\2017\0077.2017.ACBK\ComCheck.cck 09/14/17Report date: 63 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least 50%. Complies Does Not Not Observable Not Applicable C405.2.1 [EL18]1 Occupancy sensors installed in required spaces. Complies Does Not Not Observable Not Applicable C405.2.1, C405.2.2. 3 [EL23]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable C405.2.2. 1 [EL22]2 Automatic controls to shut off all building lighting installed in all buildings. Complies Does Not Not Observable Not Applicable C405.2.3 [EL16]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. Complies Does Not Not Observable Not Applicable C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable C405.2.3, C405.2.3. 1, C405.2.3. 3 [EL21]1 Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable C405.2.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable C405.2.4 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable C405.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:M:\city\building permits & plans\2017\0077.2017.ACBK\ComCheck.cck 09/14/17Report date: 64 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable C405.4.1 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C408.2.5. 1 [FI16]3 Furnished as-built drawings for electric power systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename:M:\city\building permits & plans\2017\0077.2017.ACBK\ComCheck.cck 09/14/17Report date: 65 ofPage Project Title: Data filename:M:\city\building permits & plans\2017\0077.2017.ACBK\ComCheck.cck 09/14/17Report date: 66 ofPage