Loading...
HomeMy WebLinkAboutFile Documents.614 E Cooper Ave.0098.2018 (3).ACBK10/01/18 SITE LOGISITICS PLANCON-SLPPHASE 1FLOOR TOCEILINGPLASTIC WITHZIPPER DOORALL CONSTRUCTION TRAFFICTHROUGH BACK DOOR WITHMATERIALS DELIVERY THROUGH BACKDOORBATHROOMS FORCONSTRUCITONTO BE USED VIAOWNERAPPROVALTHOUGH BACKALLEYMOVEABLE TRASH CANS ANDRECYCLE BINS TO BE PLACED INTHE CONSTRUCITON AREA ANDUTILIZED AS NEEDEDSAFETYPROTECTIONFROM STAIRSTHIS AREA TO REMAIN INOPERATION DURINGCONSTRUCTION - ISOLATEDAND SEALED FROM ALLACTIVITY10/01/18