Loading...
HomeMy WebLinkAboutFile Documents.225 Cottonwood Ln.0013.2017.ARBKMarkup Summary Subject: PlanCheck Page: 17.2.22_225 Cottonwood_Permit Set A-1.2 Your note states window to be replaced but the existing floor plan shows this as a door. Please clarify. Provide header detail if this was actually a door and the existing opening is changing. 17.2.22_225 Cottonwood_Permit Set A-1.2 (2) Subject: PlanCheck Page: 17.2.22_225 Cottonwood_Permit Set A-1.2 Provide a cut sheet or schedule for the new proposed egress window as this was not existing and is shown as a door on the existing floor plans. Provide a header detail stamped by a structural engineer if this is changing. Subject: PlanCheck Page: 17.2.22_225 Cottonwood_Permit Set A-7.2 Recessed luminaires installed in the building thermal envelope are required to be sealed and IC rated (IECC 402.4.5). Provide cut sheet on the proposed fixture that demonstrates compliance. 17.2.22_225 Cottonwood_Permit Set A-7.2 (1) Subject: PlanCheck Page: 17.2.22_225 Cottonwood_Permit Set A-l.l Handrails required on at least one side of stair where there are 4 or more risers IRC 311.7.7 17.2.22_225 Cottonwood_Permit Set A-l.l (2) Subject: PlanCheck Page: 17.2.22_225 Cottonwood_Permit Set A-l.l Egress windows must meet the requirements of IRC 310.1.1-310.1.4. Provide specs or a schedule for all windows being replaced and identify which windows will be used for egress. Call out any applicable safety glazing or egress hardware and give sill height for required egress windows. Your note states window to be replaced but the existing floor plan shows this as a door. Please clarify. Provide header detail if this was actually a door and the existing opening is changing. Provide a cut sheet or schedule for the new proposed egress window as this was not existing and is shown as a door on the existing floor plans. Provide a header detail stamped by a structural engineer if this is changing. Recessed luminairesinstalled in the buildingthermal envelope arerequired to be sealedand IC rated (IECC402.4.5). Provide cutsheet on the proposedfixture thatdemonstratescompliance. Handrails required on at least one side of stair where there are 4 or more risers IRC 311.7.7 Egress windows must meet the requirements of IRC 310.1.1-310.1.4. Provide specs or a schedule for all windows being replaced and identify which windows will be used for egress. Call out any applicable safety glazing or egress hardware and give sill height for required egress windows. Egress windows were initially shown with a 'swing' to show operability. I updated dwgs removing this confusion. All egress windows and doors to remain as such, even if being replaced. This is existing egress door to remain. I updated dwgs and note to clarify. IC Rated/Sealed housing cut sheet provided, as well as updated noted on RCP dwgs. Handrail and note added to stair in DWG. Handrail to follow IRC 311.7.7 All replacement windows to meet IRC 310.1.1-310.1.4. Window sizes and sill heights to remain. Window schedule sheet has also been added (A-5.1) showing cut sheets from window manufacturer with proper insulation and sizing numbers. City of Aspen Received 4/24/17 Building Department