HomeMy WebLinkAboutFile Documents.216 S Monarch St.0040.2018 (2).ACBK
Lily Reid Cabin Remodel
150 S. Main Street
Buffalo, WY 82834
421 East Fourth Street
Loveland, CO 80537
1717 Washington Ave., #100
Golden, CO 80228
April 5, 2018
Ms. Dana Ganssle Ellis
Rowland+Broughton Architecture and Urban Planning
234 E. Hopkins Avenue
Aspen, CO 81611
Re: Lily Reid Cabin Renovations
Dear Dana:
It is our understanding that the remodel to the Lily Reid cabin is not intended to have an impact
on the existing structure. Currently, not all of the existing structure is visible or accessible and
structural drawings of the building are not available. Upon demolition of finishes of the
building, KL&A will observe the structure and determine if any retrofit is required as a result
of the remodel. If retrofit is required, KL&A will provide the structural design and details for
that retrofit.
Sincerely,
Brett McElvain, PE
Engineering Principal
04/05/2018
04/17/2018