Loading...
HomeMy WebLinkAboutFile Documents.308 E Hopkins Ave.0084.2018 (5).ACBKCMP for 308 E. Hopkins Ave Unit 101 1.0 General 2000 sqft of interior space renovated. Table of Contents 2.0 Project Introduction 2.1 Total project disturbance area roughly 2000 sqft 2.2 Project vicinity map is included 2.3 The project is located at 308 E Hopkins Av. Unit 101,. The 22,265 sqft building is 3 stories. This IFFR permit is for the street level unit that is 2679 sqft. The space is currently a restaurant space and will become a new restaurant. 3.0 Project Documentation 3.1 At the time of this CMP no permits have been issued. 3.2 Indicate project notification per CMP Manual for all properties within 300ft. Our office will notify all properties within 300’ via signs, mail, and door to door. 3.3 Project Sign will be placed on the front door 3.4 Contact list included for: Owner Alan Giaquinto - alan@shark-bar.com Contractor Lester Development – 970.424.1001 Site supervisor Alberto Bucio – 970.618.6192 Safety officer Alberto Bucio – 970.618.6192 4.0 Project Implementation 4.1 Dates of construction ___8/15/2018 to 09/15/18_________ 4.2 Hours of construction __7:30 am to 5:00 pm Monday to Friday and Saturday 9am to 5pm 4.3 Construction schedule: IFFR Only, 3-4 Weeks 4.6 Site map is provided. Contractor will work the parking department for all required parking passes need for staging and deliveries. Since this is demo only one space will be required for dump trailer. The trailer will not be left overnight. 5.0 Project Management 5.2 Read Emergency vehicle access. We, Lester Development (General Contractor) will maintain continuous emergency vehicle access, on and around site, including but not limited to police, fire and ambulance services. This includes projects adjacent to roads and alleys. 5.4 Map showing location of: Staging ___Inside______ Trailer ______Hopkins_________ Materials ______inside ________ Waste management _____inside_________ 6.0 Traffic Control 6.2 Project haul routes _____Hopkins to Main Street_______ 6.3 Weight and size limitations of vehicles ___N/A______ 6.4 Construction vehicles activities defined _______N/A________ 6.4 Specify delivery vehicle: Maximum number of deliveries at a time ___N/A_______ Hours of deliveries ____N/A__________ Exceptions to delivery schedule ___Holidays & high traffic times – Lester Development will contact engineering if necessary. 08/14/18 CMP for 308 E. Hopkins Ave Unit 101 8.0 Sediment and Erosion Control 9.0 Fugitive Dust Control 9.1 Complete a fugitive dust control plan Plan includes: N/A Sediment tracking techniques N/A Water Truck N/A 24-hour contact - Tom Lester 379-4655 10.0 Emissions 10.1 Assure proper vehicle maintenance 10.2 Opacity – no darker than 40% 11.0 Noise Suppression 11.1 Include a signed noise suppression plan ____N/A__________ 11.2 Read the Noise controls and reduction plan... Lester Development will remind and require laborers and sub-contractor about construction noise policy and requirements. Hours: 9am to 5pm Monday to Friday for all activities exceeding 80 decibels. 08/14/18