HomeMy WebLinkAboutFile Documents.308 E Hopkins Ave.0084.2018.ACBK8/10/2018 308 E Hopkins Ave Unit 101 Scope - Google Docs
https://docs.google.com/document/d/1Th65EfgBLurwc-T0jNxqeomYr7xBaxpqsk5dSOAvc54/edit 1/1
308 E Hopkins Ave Unit 101 Scope
Bar remove bar, fixtures, cabinets and equipment.
Bathrooms Remove doors, cabinetry, and fixtures for new layout
Dining Room Remove drywall at wall that divides bar & dining room. Remove decorative wall
and ceiling treatments. Built in furniture already removed by others.
Kitchen Remove a few shelves and clean. All appliances were already removed. Possible
ceiling tiles to be removed to investigate future sound mitigation.
Throughout remove drywall, flooring, lighting, wall and ceiling finishes. Leave studs. We are
not removing any exterior doors or windows
General Notes:
Estimated time of demolition 3 weeks.
Contractor to use trash trailer, no overnight parking
Recycle or donate as much material as possible
Building monitoring to remain.
Working with neighbors to minimize demolition sound. Owner of penthouse has been informed
and involved with project.
Landlord has reviewed and approved of demolition plan.
08/14/18
08/21/2018
johnb