Loading...
HomeMy WebLinkAboutFile Documents.267 Roaring Fork Dr.0050.2017 (2).ARBU0050-2017-ARBU_BuildingComments_1 Page: 1 File Name: IRC Building Description Form.pdf Subject: PlanCheck Author: nickt Color: What structural welding is being performed? Provide structural plans and details and fully signed special inspection agreement form. Structural plans should have special inspection program. IRC Building Description Form.pdf (1) Page: 1.1 File Name: Permit Set_032817.pdf Subject: PlanCheck Author: nickt Color: Make your signature more visible on your stamp on each page. Permit Set_032817.pdf (11) Page: 1.1 File Name: Permit Set_032817.pdf Subject: PlanCheck Author: nickt Color: Provide the lab data from the asbestos test as well as an asbestos abatement clearance report. Page: 3.3 File Name: Permit Set_032817.pdf Subject: PlanCheck Author: nickt Color: Provide sheet 6.1. Must include dimensioned stair details. Rise, run, open riser opening size, framing, handrails with returns, and guards. If glass guards are used, show method of support that will resist 200 lb load. Page: 3.6 File Name: Permit Set_032817.pdf Subject: PlanCheck Author: nickt Color: You are removing the drywall as part of your asbestos abatement and have details suggesting that the new envelope tightness will be increased. Provide exterior air to the fireplace per 2009 IRC R1006. Unit #: MC 2009 IPC 2009 IFGC 2009 IECC 2009 IFC 2011 NEC ___ YES NFPA _____ th Bolting ____Epoxy Anchors ____Structural Steel Welding Micropiles _____Other (specify): ______________________ Table ____ResCheck Performace ____ResCheck UA Tradeoff _sq ft Existing ______sq ft New Spa _____ Pool ____ Drive ollwood Subdivision her Kroeger Drive x What structural welding is being performed? Provide structural plans and details and fully signed special inspection agreement form. Structural plans should have special inspection program. 1.1 Make your signature more visible on your stamp on each page. Provide the lab data from the asbestos test as well as an asbestos abatement clearance report. CD 16.1 2 40'-7" EXISTING TILETO REMAINNEW STAIR 15.1 15.1 14.1 Provide sheet 6.1. Must include dimensioned stair details. Rise, run, open riser opening size, framing, handrails with returns, and guards. If glass guards are used, show method of support that will resist 200 lb load. B C16'-51/2"1'-51/2"10'-8"51/2"4'-31/2"12'-2"NEW LINEARING HEARTH EPURPOSED OOD MANTEL EXISTING WOOD FIREPLACE You are removing the drywall as part of your asbestos abatement and have details suggesting that the new envelope tightness will be increased. Provide exterior air to the fireplace per 2009 IRC R1006. Signed attached inspection form and signed structural drawings All stamped images have been replaced All tests and results are attached Sheet 6.1 updated and form attached for guard support Vent added Received 6/6/17 Page: 3.6 File Name: Permit Set_032817.pdf Subject: PlanCheck Author: nickt Color: New hearth extension must comply with manufacturer's instructions if the fireplace is factory built. If fireplace is site built, it must be 20" deep and extend to each side of the opening at least 12" and it must be supported entirely by non-combustible structure and materials all the way to grade. 2009 IRC R1001.9 and R1001.10 Page: 3.6 File Name: Permit Set_032817.pdf Subject: PlanCheck Author: nickt Color: Door to washer/dryer closet must have a minimum 100 square inch opening for makeup air (2009 IMC 504.5). Page: 3.9 File Name: Permit Set_032817.pdf Subject: PlanCheck Author: nickt Color: New cans in insulated ceiling must be IC rated and sealed and gasketed. Page: 4.1 File Name: Permit Set_032817.pdf Subject: PlanCheck Author: nickt Color: New window at stairs must be safety glazed (2009 IRC R308.4). Page: 5.2 File Name: Permit Set_032817.pdf Subject: PlanCheck Author: nickt Color: LED cans recessed into faux beams must be listed for this type of installation. Provide specs. Non-IC type cans must be 1/2" from combustible materials; IC type cans may contact combustibles (2014 NEC 410.116). 3 16'-51/2"28'-55/8"1'-51/2"10'-8"51/2"16'-0"40'-7"4'-31/2"15.1 34.2 HARDWOODROUGHOUT BASEBOARDROUGHOUT NEW LINEARFLOATING HEARTH NEW REPURPOSEDWOOD MANTEL EXISTING WOODFIREPLACE GREAT ROOM DECK 0 New hearth extension must comply with manufacturer's instructions if the fireplace is factory built. If fireplace is site built, it must be 20" deep and extend to each side of the opening at least 12" and it must be supported entirely by non-combustible structure and materials all the way to grade. 2009 IRC R1001.9 and R1001.10 XX X FW/D 51/2"11'-0"51/2"7'-1"31/2"2'-0"31/2" NEW TILE FLOORING ANDNEW TILE AT SHOWERWALLS E HEATER TO BEAND VENTED ATCLOSET BASE NEW TILE FLOORIN AT KITCHE NEW HARDWOODFLOORING CENTER NEW WINDOWON STAIR OPENING MASTER BEDROOM MASTER CLOSET WET BAR MASTER BATH W2 STAIRW2 51/2"5'-21/8"31/2"3'-11/4"NEW BATH PLAN REFERNCE DRAWINGS BYACCENTS ON CABINETS ETS REFERNCE GS BY ACCENTSON CABINETS Door to washer/dryer closet must have a minimum 100 square inch opening for makeup air (2009 IMC 504.5). 1 GENERAL LIGHTING NOTES: 1. ALL NEW LIGHT CANS INSTALLED TO BE HIGH EFFIC New cans in insulated ceiling must be IC rated and sealed and gasketed. 201 New window at stairs must be safety glazed (2009 IRC R308.4). AB X12 FAUX WOODMS W/ RECESSED LED LIGHTS;SEE DETAIL 1/7.3 EXISTING WOOD BEAMWRAPPED W/ 8X24 NEW FAUX WOOD BEAM;SEE DETAIL 1/7.3 LED cans recessed into faux beams must be listed for this type of installation. Provide specs. Non-IC type cans must be 1/2" from combustible materials; IC type cans may contact combustibles (2014 NEC 410.116). Structural details attached, hearth revised Vent added to door Specs attached Noted Specs attached Received 6/6/17 Page: 7.1 File Name: Permit Set_032817.pdf Subject: PlanCheck Author: nickt Color: Revise details on 7.1, 7.2 and 7.4 to indicate which elements are existing and which are new. Are these details here to show proposed insulation after the drywall is removed for the asbestos abatement? Page: 8.2 File Name: Permit Set_032817.pdf Subject: PlanCheck Author: nickt Color: Detail how the new hearth is supported. DESIGN CORPSALIUS DESIGN CORPSALIUS ASPEN, COKROEGER REMODELMTEN/A ISSUE PROJECT No:DRAWN BY: DRAWING SET267 ROARING FORK DRIVECOPYRIGHT 2017 ALIUS DESIGNCORPS LLC. ALL RIGHTS RESERVED FLOOR ASSEMBLIES &DETAILS 7.1 NOT FOR CONSTRUCTION 3/29/2017SCHEMATIC5/8"1'-2"3/4"3/4"5/8"1'-2"3/4"3/4"5/8"1'-2"3/4"3/4"1"6"2"4"5/8"1'-2"3/4"1 1/2"3/4"5/8"11 7/8"3/4"3/4"T&G WOOD FLOORING -SEE INTERIOR FINISHSCHEDULEFOR SPECIES AND FINISH TILE FLOORING ANDSETTING BED - SEEINTERIOR FINISHSCHEDULE FOR TILE ¾" PLYWOOD SHEATHING ¾" PLYWOOD SHEATHING6" SOUND-ATTENUATIONBATTS @ LIVING SPACES JOISTS RE: STRUCT. 5/8" GYP. BD. @ LIVINGSPACES STAYSWASHED GRAVEL - MIN. 6" UNDISTURBED SOILOR COMPACT FILL 4" CONC. SLAB R-11 RIGID INSULATION CARPET ATOP CARPETPAD-SEE INTERIOR FINISHSCHED.FOR CARPET TYPE ¾" PLYWOOD SHEATHING 1½" RADIANT SLABREINFORCED W/ W.W.M. TILE FLOORING ANDSETTING BED - SEEINTERIOR FINISHSCHEDULE FOR TILE 6" SOUND-ATTENUATIONBATTS OVER LIVINGSPACE JOISTS RE: STRUCT. 5/8" TYPE 'X' GYP. BD. STAYSFOUNDATION WALLPER STRUCTURAL BITUMINOUSWATERPROOFMEMBRANE 2" POLYISORIGID INSULATION WASHED GRAVEL -MIN. 6" 1½" RADIANT SLABREINFORCED W/ W.W.M. FLOOR JOISTS PERSTRUCTURAL 3/4" PLYWOOD 4" CONCRETE SLAB W/RADIANT HEAT (PERPLAN) SLOPE TODRAIN 2x8 SILL PLATE W/ 1/2"DIA. ANCHOR BOLTS 2x6 SILL PLATE 3/4" PLYWOOD 2x FURRING FINISH FLOOR - SEE PLANS R-42 SPRAY-IN RIGIDCLOSED-CELLINSULATION @CRAWLSPACE (ACTS ASVAPOR BARRIER) ¾" PLYWOOD SHEATHING 6" SOUND-ATTENUATIONBATTS @ LIVING SPACES JOISTS RE: STRUCT. 5/8" GYP. BD. @ LIVINGSPACES STAYS R-42 SPRAY-IN RIGIDCLOSED-CELLINSULATION @CRAWLSPACE (ACTS ASVAPOR BARRIER) LIVING SPACECRAWL SPACE LIVING SPACECRAWL SPACE 6" SOUND-ATTENUATIONBATTS @ LIVING SPACES JOISTS RE: STRUCT. 5/8" GYP. BD. @ LIVINGSPACES STAYS R-42 SPRAY-IN RIGIDCLOSED-CELLINSULATION @CRAWLSPACE (ACTS ASVAPOR BARRIER) LIVING SPACECRAWL SPACE R-28 SPRAY-IN RIGIDCLOSED-CELLINSULATION (ACTS ASVAPOR BARRIER) R-42 SPRAY-IN RIGIDCLOSED-CELLINSULATION (ACTS ASVAPOR BARRIER) MAINTAIN R-28INSULATION @ RIMJOISTS SEAL JOIST CAVITIES PER'09 IECC CHAPTER 4 R-28 SPRAY-IN RIGIDCLOSED-CELLINSULATION (ACTS ASVAPOR BARRIER) 1" THICK FAUX WOODBEAM; SEE PLAN FORSIZING AND LOCATION 4" RECESSED LED LIGHT FRAMED FLOOR W/ TILE FRAMED FLOOR W/ CARPET 1 ½" = 1'-0" 7.1 FRAMED FLOOR W/ WOOD SLAB ON GRADE @ CRAWLSPACES F1 F2 F3 F5 1 ½" = 1'-0"1 ½" = 1'-0" 1 ½" = 1'-0" T. O. PLYWOOD88'-0" or 100'-0" or 111'-0" 1 ½" = 1'-0"F41 HOUR RATED FRAMED FLOOR W/ TILE OVER11/2" SLAB DESIGN BASED ON GA FILE NO. FC 53101 HOUR RATING40 TO 44 STC RATINGFIRE TESTING: UL R 1319-47, 5-8-63 UL DESIGN L508 UL DESIGN L508 T. O. FIN. FLOOR88'-03/4" or 100'-03/4" or 111'-03/4" T. O. PLYWOOD88'-0" or 100'-0" or 111'-0" T. O. FIN. FLOOR88'-03/4" or 100'-03/4" or 111'-03/4" T. O. PLYWOOD88'-0" or 100'-0" T. O. FIN. FLOOR88'-03/4" or 100'-03/4" T. O. SLAB93'-111/4" T. O. FIN. FLOOR111'-2 1/4" T. O. PLYWOOD111'-0" 1 ½" = 1'-0"THRESHOLD @ EXT. SLAB1 1 1/2" FLOOR DETAIL & ASSEMBLY TEMPLATE T. O. PLYWOOD100'-0" or 111'-0" 2 INSULATION DETAIL @ RIM JOIST1 ½" = 1'-0" 3 LIGHTING DETAIL @ FAUX BEAM1 ½" = 1'-0" Revise details on 7.1,7.2 and 7.4 to indicatewhich elements areexisting and which arenew. Are these detailshere to showproposed insulationafter the drywall isremoved for theasbestos abatement? WOOD MANTEL, VERIFY NEW FLOATING HEARTH Detail how the new hearth is supported. Noted new and existing Structural drawings signed and attached Received 6/6/17