HomeMy WebLinkAboutFile Documents.219 S 3rd St.0081.2019 (2).ARBK0081-2019-ARBK_BuildingComment1
Subject: PlanCheck
Page Label: A1.2 PROPOSED SNOWMELT
Author: justinh
File Name: 219 S Third St_CO2_Architectural.pdf
Color:
These square footages do not
match the square footages
shown for snowmelt in the
mechanical plans. Revise one
or the other so that these are
consistent between sets. I will
create a new 2009 REMP
worksheet for this change order
once the snowmelt amounts are
revised to be consistent (as this
permit is under the 2009 code
editions rather than the 2015s).
It looks like the previous change
order had incorrectly used a
2015 REMP worksheet as well.
I will reconcile all REMP fees
paid on the master and previous
change order against the 2009
REMP worksheet I create to
make sure you're not paying any
fees that you shouldn't be.
219 S Third St_CO2_Architectural.pdf (1)
Subject: PlanCheck
Page Label: M-0.3 MECHANICAL SCHEDULES
Author: justinh
File Name: 219 S Third St_CO2_Mechanical_2019-03-15.pdf
Color:
The mechanical set should be
signed and stamped.
219 S Third St_CO2_Mechanical_2019-03-15.pdf (1)
These square footages do not match the square footagesshown for snowmelt in the mechanical plans. Revise one orthe other so that these are consistent between sets. I willcreate a new 2009 REMP worksheet for this change order
once the snowmelt amounts are revised to be consistent (asthis permit is under the 2009 code editions rather than the
2015s). It looks like the previous change order hadincorrectly used a 2015 REMP worksheet as well. I willreconcile all REMP fees paid on the master and previous
change order against the 2009 REMP worksheet I create tomake sure you're not paying any fees that you shouldn't be.
FAN SCHEDULE
MARK TYPE
FAN MOTOR
MANUFACTURER*& MODEL #ACCESSORIES REMARKSCFMSONESESP @ALT (INWC)POWER(W)VOLT/PHASE
EF-1 CEILING 100 0.8 0.25 16.1 120/1 PANASONIC WHISPERGREEN SELECTFV-05-11VK1 --
EF-2 CEILING 50 0.3 0.25 16.1 120/1 PANASONIC WHISPERGREEN SELECTFV-05-11VK1 --
EF-3 ROOFMOUNTED 1,200 --360 120/1 TBD PER ARCH -INTERLOCKED WITH HOODCONTROLS.
FAN-1 IN-LINE 200 -0.4 53.2 120/1 PANASONICWHISPERLINEFV-20NLF1 DUCT HEATER (DH-1),2000 W ELECTRIC DUCTHEATER.-
ERV-1 ENERGYRECOVERY 200 -0.5 216 120/1 RENEWAIRE EV240 A -
MANUFACTURERS: * ACME, COOK, GREENHECK, PANASONIC, PENN GENERAL NOTES:A:PTL MASTER PERCENTAGE TIMER (INSTALLED AT UNIT) & PBL POINT-OF-USE PUSH BUTTONS (INSTALLED IN EVERY ROOM EXHAUSTED BY UNIT).B:
FAN COIL SCHEDULE
ARKSERVICE TYPE
FAN COOLING COIL HEATING COIL
FILTERMANUFACTURER*& MODEL #ACCESSORIES REMARKSCFMO.S.A.CFM ESP(IN.WC.)ELECTRICAL AIR CONDITIONS AIR CONDITIONS ELECTRICAL WATER CONDITIONS
MCA VOLT/PH E.A.T.DB/WB(°F)L.A.T.DB (°F)TOTALMBHSENSIBLEMBHE.A.T.DB (°F)L.A.T.DB (°F)SENSIBLEMBHMCA VOLT/PH E.W.T.(°F)L.W.T.(°F)GPMMAX.WTRP.D. (FT.)
U-1 (F)LLBEDROOMS(FUTURE)VERTICAL 585 40 0.3 3.0 230/1 75/57 45 18.0 14.0 70 100 14.0 20.0 230/1 ----2"PLEATED(MERV 13)MITSUBISHIPVFY-P18NAMU-E1 HP-2 NOT INSTALLED AT THIS TIME.
U-2 (F)MEDIA &GYM(FUTURE)VERTICAL 585 50 0.3 3.0 230/1 75/57 45 18.0 14.0 70 100 14.0 20.0 230/1 ----2"PLEATED(MERV 13)MITSUBISHIPVFY-P18NAMU-E1 HP-2 NOT INSTALLED AT THIS TIME.
CU-3 MASTERBEDROOM& BATH VERTICAL 735 35 0.3 3.0 230/1 75/57 45 24.0 18.7 70 100 18.7 25.0 230/1 ----2"PLEATED(MERV 13)MITSUBISHIPVFY-P24NAMU-E1 HP-1, H-1 HUMIDIFIER -
CU-4 DEN HORIZONTAL500 0 0.28 1.5 230/1 75/57 45 15.0 11.7 70 100 11.7 20.0 230/1 ----1"PLEATED(MERV 13)MITSUBISHIPEFY-P15NMAU-E3 HP-1 -
CU-5BEDROOMANDBATHROOM3HORIZONTAL885 25 0.28 2.7 230/1 75/57 45 24.0 18.7 70 100 18.7 25.0 230/1 ----1"PLEATED(MERV 13)MITSUBISHIPEFY-P24NMAU-E3 HP-1, H-1 HUMIDIFIER -
CU-6 LIVING,DINING,KITCHEN,ENTRY VERTICAL 3700 50 ERV &1,200MAKE UPAIR 0.35 6.9 230/3*75/57 45 54.8 43.7 70 92.6 113.9 --140 130 24 9.7 2"PLEATED(MERV 13)CARRIER39SVA09NZLJ534DMXG
CU-1, H-2 HUMIDIFIER.PROVIDE FREEZESTATFOR MD-1 DAMPERCONTROL AT FCUDISCHARGE.
*UNIT CONTROLLED BY VFDWHICH CONVERTSSINGLE-PHASE POWER TO3-PHASE POWER FOR UNIT.NUFACTURERS: * CARRIER, ENVIROTEC, MCQUAY, TRANENERAL NOTES:A:B:
GRILLE, REGISTER, DIFFUSER & LOUVER
SYMBOL USE PATTERN FINISH MANUFACTURER*& MODEL #ACCESSORIES REMARKS
CEILINGEXHAUST FIXED LOUVERPAINT TOMATCH PRICE LBP 15B A, C -
EXTERIORWALL LOUVER DRAINABLEBLADEPER ARCH GREENHECK ESD-202 --
FLOOR GRILLE LINEAR BARGRILLEPAINT TOMATCH PRICE LBMH 25C A, B, C -
WALL SUPPLY/RETURN LINEAR BARGRILLEPAINT TOMATCH PRICE LBMH 25C A, B, C -
CEILINGSUPPLY/RETURN LINEAR SLOTDIFFUSERPAINT TOMATCH PRICE LBP 15B A, B, C -
-------
MANUFACTURERS:GRD KRUEGER, METALAIRE, TITUSLOUVER GREENHECK, L&D, RUSKIN GENERAL NOTES:
A:PROVIDE BALANCING DAMPERS FOR ALL GRILLES AND BALANCE TO VALUES SHOWN ON PLANS. DAMPERS TO BE ADJUSTABLEAFTER CONSTRUCTION IS COMPLETE VIA PHYSICAL ACCESS, CABLE ACTUATOR, OR OTHER MEANS. DAMPERS AT SUPPLYGRILLES ARE ACCEPTABLE AS A LAST RESORT.B:PROVIDE ENGINEERED PLENUM OR ENGINEER APPROVED ALTERNATE.C:PROVIDE MANUFACTURER'S CONCEALED PLASTER FRAME.
A
B
C
D
E
MISCELLANEOUS MECHANICAL EQUIPMENT SCHEDULE
MARK SERVICE TYPE CAPACITY ELECTRICAL MANUFACTURER* &MODEL #ACCESSORIES REMARKSPOWERVOLT/PH
DH-6 BASEMENTSUPPLEMENTALHEATING ELECTRIC DUCT HEATER 6.8 KBTU 2 KW 240/1 GREENHECK IDH OREQUIVALENT ON/OFF CONTROLLED -
H-1 HUMIDIFICATION STEAM HUMIDIFIER 11 GAL/DAY 11.5 A 120/1 CARRIER HUMCCSTM -A,B
H-2 HUMIDIFICATION STEAM HUMIDIFIER 22 GAL/DAY 11.5 A 240/1 CARRIER HUMCCSTM -A,B
MD-1 MAKE UP AIR INSULATED CONTROLDAMPER 1200 CFM --GREENHECK ICD --
ZD-1 MASTER BATHROOM ZONE DAMPER 400 CFM --CONTRACTOR'S CHOICE --
HS-1 BOILER PLANT HYDRONIC SEPARATOR ---CALEFFI HYDRO SEPARATORSERIES 548 DIRT REMOVER, AIR VENT, INSULATEDJACKET LINE SIZE
GF-1 BOILER PLANT GLYCOL FEEDER 6.6 GALLON 15 A 120/1 AXIOM MF200 -FILL HYDRONIC SYSTEM WITHPROPYLENE GLYCOL-WATERSOLUTION PER PIPING DIAGRAMS. GENERAL NOTES:A:PROVIDE MODULATING CONTROL BASED ON OUTDOOR AIR TEMPERATURE (HUMIDITRACK AUTOMATIC CONTROL) IN RETURN DUCT. SEE FLOOR PLANS FOR HUMIDISTAT LOCATIONS.B:SEE FAN COIL UNIT SCHEDULE FOR HUMIDIFIER QUANTITY/PAIRING.
CONDENSING UNIT SCHEDULE
MARK SERVICETYPE
EVEPORATOR ELECTRICAL
SEER MANUFACTURER*& MODEL ACCESSORIES REMARKSAMBIENTTEMP. DB(°F)TOTALMBH VOLT/PH MCA MOCP
CU-1 SPACECOOLING AIRCOOLED 84 60 240/1 31.1 50 14 CARRIER 24AHA PROVIDE LOW AMBIENTKIT (OPERATIONBELOW 40° REQUIRED)-
HP-1 SPACECOOLING AIRCOOLED 84 60 240/1 35 40 16.5 MITSUBISHIPUMY-P60NKMU -
HP-2 (F)SPACECOOLING AIRCOOLED 84 36 240/1 26 30 14.3 MITSUBISHIPUMY-P36NHMU --
GENERAL NOTES:A:B:
COPYRIGHT 2018 ROWLAND+BROUGHTON ARCHITECTURE AND URBAN DESIGNTHE INFORMATION AND DESIGN INTENT CONTAINED ON THIS DOCUMENT ISTHE PROPERTY OF ROWLAND+BROUGHTON ARCHITECTURE AND URBANDESIGN. NO PART OF THIS INFORMATION MAY BE USED WITHOUT THE PRIORWRITTEN PERMISSION OF ROWLAND+BROUGHTON ARCHITECTURE AND URBANDESIGN. ROWLAND+BROUGHTON ARCHITECTURE AND URBAN DESIGN SHALLRETAIN ALL COMMON LAW STATUTORY AND OTHER RESERVED RIGHTS,INCLUDING COPYRIGHT THERETO.
Consultants
Issue:
SHEET TITLE
PROJECT NO:
DWG FILE:
1830 blake st, ste 200denver, co 80202303.308.1373 o303.308.1375 f
234 e hopkins aveaspen, co 81611970.544.9006 o970.544.3473 f
rowland+broughtonarchitecture / urban design / interior design
SCALE:
9977.00M0.3 - Schedules.dwg
FOSTER LOT 2
219 S. THIRD ST.ASPEN, CO 81612
9977
ALBUQUERQUE | AVON | DENVER | FORT COLLINS303.278.3820www˛bgbuildingworks˛comProject No. 9977.00 Copyright 2018
03.15.19CHANGE ORDER 2
MECHANICALSCHEDULES
M-0.3