HomeMy WebLinkAboutFile Documents.219 S 3rd St.0081.2019 (6).ARBK
Page 1 of 5
TRANSMITTAL
Project: 219 S. Third St.
Subject: Change Order 2
Date: 15 March 2019
To: Phil LeHue
From: Delvon Nemechek
Via: Jump Drive
Attachments: See Below
If you do not receive all attachments listed below please call immediately.
Hi Phil,
Please find enclosed drawings and items pertaining to Change Order 2.
1. Architectural (Rowland and Broughton)
a. Drawings
b. Updated Fireplace Registration Form and spec sheets
c. Updated REMP Calculation Worksheet
d. RDS stucco approval email
2. Structural (Monroe Newell)
a. Drawings
3. Structural (Landon Anderson)
a. Drawings
4. Mechanical (BG Building Works)
a. Drawings
Below is a comprehensive narrative in bullet point form from each discipline describing the scope
changes made in this revision.
Architectural:
· As discussed with Jim as part of our revision and comments to Change Order 1 we are
submitting a fully coordinated set of drawings consisting of the site plan, floor plans, reflected
ceiling plans, elevations, sections, stair sections and assemblies. Below is our list of specific
sheets that have changed beyond Change Order 1 correspondence.
o Full list of architectural sheets submitted with Change Order 2:
A0.0, A0.1
A1.1, A1.2
A2.0, A2.1, A2.2, A2.3, A2.4
A3.0, A3.1, A3.2, A3.3
A4.1, A4.2, A4.3, A4.4
A5.1, A5.2, A5.3, A5.4, A5.5, A5.6
A6.31
04/05/2019
Page 2 of 5
A7.1, A7.2
· A1.2
o Revised snowmelt areas
o See attached REMP calculation worksheet
· A2.1
o Relocated Powder Room 102, Closet 110, and Broom Closet 114.
o Eliminated floor drains in lieu of sloping the garage slab from back to front. Drainage
will exit out the garage door to a trench drain in the driveway.
o Electrical and gas meters have moved the corral to the west of the garage.
o Addition of a rain shower head in the master bathroom shower 107.
o Elimination of fireplace in master bedroom 103.
· A2.2
o New make/model of fireplace at the living room, see attached updated fireplace
registration form and specifications.
o Addition of a gas appliance fireplace in the den, see attached updated fireplace
registration form and specifications.
o Updated condenser locations; see also updated mechanical drawings.
o Back patio coordinated with landscape design.
· A2.3
o Chimney flue for the den added.
o Kitchen range hood exhaust added.
· A2.4
o Eliminated the chimney flue at the upper roof volume. The new fireplace venting is out
the south side wall.
· A4.1
o Addition of chimney flue for den fireplace.
o Material change from concrete panels to stucco, see attached approval letter from
RDS.
o Chimney flue at upper roof volume has been removed.
o Kitchen range hood exhaust added.
· A4.2
o Addition of chimney flue for den fireplace.
o Material change from concrete panels to stucco, see attached approval letter from
RDS.
o Gas and electric meters have been moved to the corral.
o Updated mechanical equipment and pad.
· A4.3
o Updated mechanical equipment and pads.
o Updated living room fireplace exhaust has been added.
o Chimney flue at upper roof volume has been removed.
· A4.4
o Material change from concrete panels to stucco, see attached approval letter from
RDS.
o Chimney flue at upper roof volume has been removed.
· A5.2
o Updated stair and elevator framing.
· A5.3
o Updated stair design.
· A5.5
04/05/2019
Page 3 of 5
o Updated stair design.
o Elevator to roof deck was eliminated.
· A6.21
o Sheet was eliminated from set.
· A6.31
o Updated stair design plans and sections.
· A7.1
o Updated roof assemblies, Class A and R-Value requirements remains compliant.
o F-8 floor assembly was added.
· A7.2
o W-1 wall assembly was updated for stucco.
o W-3a wall assembly was added.
Structural – Monroe Newell:
· S2.0
o Added wall for condenser Grid K &10.
· S2.1
o Updated stair framing.
o Added dowels at front patio
· S2.2
o Add note for shear wall end stud attachment.
o Updated support for Den fireplace.
o Updated support for Livingroom fireplace.
o Added dowels at back patio.
· S2.3
o Updated stair framing.
o Added Den fireplace framing in shear wall.
· S2.4
o Updated support beam for skylight/window.
· S3.0
o Updated sections 9 -14.
o Added section 15.
· S3.1
o Updated sections 1 and 6
o Added sections 8 - 13
· S3.2
o Sheet added to set
· S4.0
o Added sections 14 and 15
Structural – Landon Anderson:
· S1.0, S1.1, and S5.2
o Sheets added to set.
o These sheets were part of the original structural scope and documentation, and
shouldn’t have been pulled from the original set. We are adding these back into the set.
o This scope has remained unchanged.
04/05/2019
Page 4 of 5
Mechanical – BG Building Works:
· M1.0
o No revisions.
· M0.1
o Added mechanical equipment control sequence/information
· M0.2
o Chiller system removed.
o Pump schedule revised.
o Chilled water and hot water buffer tanks removed.
· M0.3
o Condensing units added.
o Fan coil unit schedule revised.
o Fan schedule revised
o Grille schedule revised
o Miscellaneous mechanical equipment schedule revise.
· M1.1
o Chillers removed.
o Condensing unit added.
o Heat pumps added.
o Electrical panels shown.
o Gas and electrical meters relocated.
· M2.0
o Ducting revised.
o Mechanical room equipment layout revised.
· M2.1
o Ducting and fan coil unit locations revised.
· M2.2
o Ducting and grille locations revised.
· M2.3
o Boiler and fireplace flues shown.
o Kitchen exhaust fan relocated.
· M3.0
o Mechanical details revised and re-organized.
o Gas one-line diagram revised.
· M3.1
o Sheet added to set.
o Boiler and domestic water heater diagram shown.
o Snowmelt heat exchanger diagram shown.
o Space heating and snowmelt control diagrams shown.
o Hydronic details (pumps, snowmelt, etc.) shown.
· P2.0
o Radiant zones revised.
o Radiant zone schedule updated.
· P2.1
o Radiant zones revised.
o Radiant zone schedule updated.
o Snowmelt zones revised.
o Snowmelt zone manifold schedule updated.
04/05/2019
Page 5 of 5
· P2.2
o Radiant zones revised
o Radiant zone schedule updated
o Snowmelt zone revised.
o Snowmelt zone manifold schedule updated.
· P2.3
o Radiant zones revised.
o Radiant zone schedule updated.
o Snowmelt zone revised.
o Snowmelt zone manifold schedule updated.
Thank you and please be in touch with any questions or requests for more information.