HomeMy WebLinkAboutFile Documents.865 Moore Dr.0067.2016 (2).ARBK`i'
U u
Co L—;' -.w--
6 (.,,
AN
NOS i l+-
37
Lt X 3LQ `
5704
5 0Ui 1t3
7°
=
4.
/lei
,
Co L—;' -.w--
6 (.,,
AN
6� V 3 G 0 a3.7 (o k �J
NOS i l+-
37
Lt X 3LQ `
5704
5 0Ui 1t3
7°
=
4.
/lei
SouT�f
�°
K 3CQo •:
Z,1�
37 0
ZZ x 3(v C' �-
U�IESi
-S-70
( 1 K '�Gv
` �. `?�'
6� V 3 G 0 a3.7 (o k �J
PV WORKSHEET
CITY OF ASPEN VERSION 113 UPDA TED DECEMBER 13, 2017
PROJECT ADDRESS: 863 Moore Dr
Parcel ID #:
Collector Group
Collector Group
Collector Group
Collector Group
Collector Group
Collector Group i
Collector Group
Collector Group I
Collector Group !
Collector Group 11
Collector Group 1'
Collector Group 1:
Collector Group 1,
Collector Group 1,
Collector Group 1'
Collector Group 1E
Collector Group i-,
Collector Group 1 f
Collector Group 1E
Collector Group 2(
Collector C
Aspect, Degressollector Tilt,
from True South Degrees From
Horizontal
Permit Number:
Solar
Orientation
Adjustment DC side capacity Inverter capacity kW for kW Mitigation
Factor IkW% rLtnn
150
30
30
120
60
37
37
14
37
37
50.69%
97.90%
.4 0
0
0
5.04
4.68
2.16
7.92
3.96
4.13
3.84
1,77
6.5
3.25
4.13
3.84
1.77
6.5
3.25
_ vM2`09 kW
3.76 kW
1.64 kW
4.44 kW
2.99 kW
7
0
0.00 kW
°
0
0.00 kW
87. 0
0
0.00 kW
87.0 0
0
0.00 kW
7 °
0
0
0.00 kW
0.00 kW
87.00%,
0
87.00%0
87.00%-
0
7.00 0
0
7' °
0
10k
°
0
87.00%
0
87,00%
0
°
n
i
Total:
$ Mitigation Credit:
Instructions:
1) Determine how many collector groups you have. Groups are used to differentiate between collectors
(panels) with different tilts, aspects, sizing, or inverters. If all your collectors are installed similarily, you
might have just one group.
2) Enter the aspect and tilt for each group. The solar orientation adjustment factor is automatically
calculated.
3) DC side capacity is the total labled panel output kW in a group.
4) Inverter capacity is the recommended input power in kW of your inverter(s).
5) You will be given credit for the lesser of the labeled panel output or the inverter.
6) The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit.
7) The kW mitigation credit is totalled and multiplied by $6865.32/kW to get the $ Mitigation Credit
8) The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP and
CREMP, it will automatically divide the credits up, with priority given to mitigating the CREMP payment.
PREPARED BY: Date: 10/2/2018
Print Name: Mike Tierney
Signature: mike
Phone & EMail: 970-925-3659 mike@aspensolar.com
REVIEWED:
Date:
Gnu i- s ,-�Y �-t -T--, r
,� r- Pr 3