HomeMy WebLinkAboutFile Documents.720 E Durant Ave.0064.2018.ACBK0064-2018-ACBK_BuildingComment1
Subject: PlanCheck
Page Label: 1
Author: justinh
File Name: COMCHECK.pdf
Provide cutsheets on all lighting
fixtures showing NRTL listing
and maximum fixture wattage.
COMCHECK.pdf (3)
Subject: PlanCheck
Page Label: 1
Author: justinh
File Name: COMCHECK.pdf
This SF is greater than what I
measure the space to be per
your plan (I measure the space
to be 675 SF of interior space
per the scale on the plan),
please revise.
Subject: PlanCheck
Page Label: 1
Author: justinh
File Name: COMCHECK.pdf
Fill out this portion of the project
information
Subject: PlanCheck
Page Label: A21 General Notes Demo & Tenant
Improvements
Author: justinh
File Name: Plans.pdf
Are you proposing any
mechanical alterations? If so
provide that mechanical plan,
otherwise show existing supply
and return air on your RCP to
demonstrate that all spaces are
being provided with adequate
ventilation.
Plans.pdf (9)
Subject: PlanCheck
Page Label: A21 General Notes Demo & Tenant
Improvements
Author: justinh
File Name: Plans.pdf
Show compliant lighting controls
per IECC C405.2. This will
require automatic occupant
sensor controls or time switch
controls (C405.2.1, C405.2.2) as
well as manual light reduction
controls (C405.2.2.2).
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allow
Watts /
1-Retail:Sales Area 800 1.59
Total Allowed
Proposed Interior Lighting Power
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtur
Retail: Sales Area (800 sq.ft.)
Track Lighting: Wattage based on 32 feet of track 0 0
Total Prop
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is c
building plans, specifications, and other calculations submitted with this permit application. The proposed
systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.3.5.1 and to co
applicable mandatory requirements listed in the Inspection Checklist.
Interior Lighting PASSES
Provide cutsheets on
all lighting fixtures
showing NRTL listing
and maximum fixture
wattage.
COMcheck Software Version 4.3.5.1
Interior Lighting Compliance Certificat
Project Title:
2015 IECC
Project Type:Alteration
Construction Site:
720 E DurantAspen, Colorado 81611
Owner/Agent:Designer/Contractor:
Project Information
Energy Code:
Green Joint
Allowed Interior Lighting Power
A
Area Category
B
Floor Area(ft2)
C
AllowedWatts / ft2 All
1-Retail:Sales Area 800 1.59
Total Allowed Watts =
Proposed Interior Lighting Power
D
FixtureWatt.
AFixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/Fixture
C
# ofFixture
Retail: Sales Area (800 sq.ft.)
Track Lighting: Wattage based on 32 feet of track 0 0 0
Total Proposed Watts
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent building plans, specifications, and other calculations submitted with this permit application. The proposed interior lig
systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.3.5.1 and to comply with applicable mandatory requirements listed in the Inspection Checklist.
Interior Lighting PASSES
This SF is greater than what I measure the
space to be per your plan (I measure the
space to be 675 SF of interior space per the
scale on the plan), please revise.
OMcheck Software Version 4.3.5.1
nterior Lighting Compliance Certificate
2015 IECC
Alteration
611
Owner/Agent:Designer/Contractor:
on
Green Joint
ighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
800 1.59 1272
1272Total Allowed Watts =
Lighting Power
E
(C X D)
D
Fixture
Watt.
A
D : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixture
00 sq.ft.)
Fill out this portion of
the project information
Leased Square Feet:
Location on Property:
Occupancy Group:
Adjacent tenant Occupancy Groups:
Structural systems:
Leased Unit Exits:
Required Exits:
Common Path of Travel:
Corridor:
Fire Alarm & Detection:
Occupancy Load:
704 SF
Unit E-3, Southwest side of building
M (Merchantile)
B (Office) East
No structural improvements
1
1 (2105 IEBC 805.3)
41'-0" (75 feet allowed)
No
A new fire alarm system shall be installed
Merchantile (60) 704 SF /12 occupants
Accessible:Yes
Type of Construction:Type V-B (assumed)
Vacant West
Classification of Work:Alteration- Level 2
per 2015 IEBC 804.4 and NFPA 72
Fire Sprinkler:No
Electrical:
Existing installations in Occupancy Group M are not required to
be upgraded (2015 IEBC 808.2)
All newly installed electrical equipment and wiring shall comply
with NFPA 70
Mechanical:
Provide mechanical ventilation per International Mechanical Code
All newly introduced devices, equipment, or operations that
produce airborne particulate matter,
odors, fumes, vapor in such quantities as to cause discomfort to
occupants shall be provided with local exhaust.
y
y
ected
rial may
er
, and
own
free of
mbered
ately
all
her
y
other
d
ith
pletion,
and
rical
d any
her
site to
Are you proposing any
mechanical
alterations? If so
provide that
mechanical plan,
otherwise show
existing supply and
return air on your RCP
to demonstrate that all
spaces are being
provided with
adequate ventilation.
1'-412"
05-14-18
Show compliant lighting controls per
IECC C405.2. This will require automatic
occupant sensor controls or time switch
controls (C405.2.1, C405.2.2) as well as
manual light reduction controls
(C405.2.2.2).
Subject: PlanCheck
Page Label: A21 General Notes Demo & Tenant
Improvements
Author: justinh
File Name: Plans.pdf
Your POS stations and ID check
are required to be accessible.
Provide details/interior
elevations that show your POS
stations meet the requirements
of 2009 ANSI A117.1 section
904.
Subject: PlanCheck
Page Label: A21 General Notes Demo & Tenant
Improvements
Author: justinh
File Name: Plans.pdf
This is a type VA building.
Revise this note.
Subject: PlanCheck
Page Label: A21 General Notes Demo & Tenant
Improvements
Author: justinh
File Name: Plans.pdf
Provide a plan showing an
accessible route to an
accessible restroom on site.
Provide photos documenting that
the existing restroom is
accessible.
Subject: PlanCheck
Page Label: A22 Reflected Ceiling Plan & Wall Types
Author: justinh
File Name: Plans.pdf
These light fixtures are not
included in the ComCheck, the
ComCheck shall include all
lighting within the space. Revise
the ComCheck to account for all
lighting.
Subject: PlanCheck
Page Label: A22 Reflected Ceiling Plan & Wall Types
Author: justinh
File Name: Plans.pdf
This is a residential code
provision, please remove it from
your plan.
6"Gree Ten Your POS stations and ID
check are required to be
accessible. Provide
details/interior elevations that
show your POS stations meet
the requirements of 2009 ANSI
A117.1 section 904.
ity
, E-3
ncy Groups:
704 SF
Unit E-3, Southwest side of building
M (Merchantile)
B (Office) East
Type V-B (assumed)
NTS:
Vacant West
ng Code (as adopted)
ng Building Code (as adopted)
Alteration- Level 2
nformation:
This is a type VAbuilding. Revise thisnote.
6"Green Joi Tenant Imp
Provide a plan showing an
accessible route to an accessible
restroom on site. Provide photos
documenting that the existing
restroom is accessible.
7'-012"9'-558"10'-0"4"#3-05OFFICE
#3-06SAFE ROOM9'-734"9'-734"10'-112"5'-834"5'-712"6'-134"
LIGHTING LEGEND
Recessed mount
Wall mounted
#3-05OFFICEMGR
both sides
w
8" o.c.ners
o ceiling
oam
ped seams
ped seams
These light fixtures are
not included in theComCheck, theComCheck shall
include all lightingwithin the space. Revise the ComCheck
to account for alllighting.
This is a residential
code provision, please
remove it from your
plan.
Subject: PlanCheck
Page Label: A22 Reflected Ceiling Plan & Wall Types
Author: justinh
File Name: Plans.pdf
Are you proposing any of this
type of fixture? If not please
remove them from your legend.
Subject: PlanCheck
Page Label: A22 Reflected Ceiling Plan & Wall Types
Author: justinh
File Name: Plans.pdf
UL U419 is an assembly that
uses steel studs which is not
what is shown in your detail.
Your detail much match a
listed/tested assembly to be
considered a compliant 1 hour
assembly. Please provide a
different listing that matches
your detail.
LIGHTING LEGEND
Recessed mount
Wall mounted
2 x 4 LED fixture
2 x 2 LED fixture
Track light LED
plateoor with
h sides
b
d nail @ 48" o.c.ds and corners
on ornsulating foambarrier, taped seams
h sides
4
ard
ansition
esh
on plywood
wall studs
wall studs
rlap seams
Are you proposing any
of this type of fixture?
If not please remove
them from your
legend.
LIGHTING LE
Recesse
Wall mou
2 x 4 LED
2 x 2 LED
de 5/8" type X gypsum board, both sides
2 x 4 stud wall @ 16" o.c.
full cavity
wi4x
attach 2x4 sill plateto existing subfloor with
wall type as described below
rubber base, both sides
existing floor slab
powder actuated nail @ 48" o.c.and 12" from ends and corners
5/8" type X gypsum board to ceiling
Leased UnitNeighboring Unitacoustic insulation orexpanded rigid insulating foam
6 mil poly vapor barrier, taped seams
6 mil poly vapor barrier, taped seams
fire caulking, both sides
existing wall 2 x 4
existing ceiling t & g board
metal angle trimat wall/ ceiling transition
UL U419 is an assembly that uses steel
studs which is not what is shown in your
detail. Your detail much match a
listed/tested assembly to be considered
a compliant 1 hour assembly. Please
provide a different listing that matches
your detail.