HomeMy WebLinkAboutMaster Permit.710 E Durant Ave.0015.2019.ACBK
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
Commerical
Multi-Family
Single Family
Use of Building Class of Work
New
Addition
AlterationRepair
________
Yes
No
Will there be
any roof/wall
penetrations?
NOTICE: This permit becomes null and void if work
or construction authorized is not commenced within
180 days, or if construction or work is suspended or
abandoned for a period of 180 days at any time after
work is commenced.
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
PROJECTVALUATION
SQ FT OF BUILDING WORK AREA
UNIT SQ FT
SQ FT OF SOILDISTURBANCE
BUILDING FOOTPRINT
LOT SIZE(SQ FT)
PROJECT DETAILS (READ DEFINITIONS BELOW)
Mixed-Use
IFFR
Tenant FinishDemolition
Change Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
Building
Review
Building
Permit Fee Parks Impact
Engineering
Review
Zoning
Review (50%)
School Lands
Dedication
Zoning
Review (50%)
CMP (50%)TDM Impact
Energy Code
Review
REMP
Payment
Pedestrian
Amenity
CMP (50%)GIS Housing Cash in Lieu
Parks Review City Use
Tax Water Tap
Utility Review County Use
Tax Sanitation
SUBMITTAL FEES ISSUANCE FEES
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtub
____Lavatory (Wash Basin)
____Shower
____Kitchen Sink (+Disposal)
____Dishwasher
____Laundry Bar, Utility Sink
____Clothes Washer
____Floor Sink
____Floor Drain
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts Important Review Triggers
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Reviewer
Sign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.
Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.
Unit Sq Ft: Gross square footage, not FAR, of permitted unit.
Lot Size: Total surveyed square footage of property.
Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed
New Sq Ft: Total added square footage for additions to net livable or net leasable space.
Building Footprint: Grade floor square footage of the permitted structure.
Hardscape Area: Square footage of impervious lot surface.
Zone District: Underlying zone district of permitted parcel.
January 2019
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
HARDSCAPEAREA
NeedsReview
DEFINITIONSZONEDISTRICT
Major Engineering Review
• Projects involving less than 50%
hardscape area and work affecting
75% or greater of unit sq ft
• Projects involving greater than
50% hardscape area and work
affecting 50% or greater of unit
sq ft
• Projects involving 1,000+ sq ft of
soil disturbance area
Water Efficient Landscaping
• Projects that trigger a major
engineering review
•Projects involving interior
alterations affecting 50% or more
of exisiting gross square footage
THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY
Paddy Allen - owner Representive
10,800
Please note: The building already paid the EIC fee to upgrade the Electricial service from the city so we were told we may not need to pay EIC again
W-7
N/A
N/A
Jennifer Eis
818
9704292436
2/6/19
710 E Durrant Avenue w-7 Aspen, co 81611
970-948-9797 Ajaxsalonandspa@gmail.com
Electrical upgrade from 125 A to 200 Amps from basement to W-10 pannel and 3” core drill in basement ceiling
108
A 3” core Drill
2737182422006
Paddy@friasproperties.com
03/15/2019
0015.2019.ACBK
x
x
x
LL 3/15/19
162.50
102.38
27.00
162.50
157.50
NC
JRB 3/19/19
0
0
0
0
0
BM 5/9/19
NT 5/10/19
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
/ hereby certify that / have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. /t is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
/NSPEd/ONS: dŚe 'eneral ontractor ŵust scŚedule inspections online͘
Please ǀisit www͘aspenpitkin͘coŵͬDepartŵentsͬoŵŵunitLJ-Deǀelopŵent-Forŵsͬ to do so͘
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). zou must take a test and complete the owner/building affidavit.
(C/Tz USE KELz) Kwner builder approved by͗________________________Date͗______________________ Affidavit on file
ADDRESS͗ ____________________________PERM/T EUMBER͗ _______________________________
August 2017
970429
pO Box 1071
5elementselectric@gmail.com
81658
(970) 948-8706
970-948-9797
Epekkala@MSN.Com
Vail
5 elements
Paddy@friasproperties.com
Same
Capital Commercial Investment Inc.
Co
Co
2/15/19
Ajaxsalonandspa@gmail.com
710 E Durrant Avenue w-7 Aspen, co 81611
Same
Aspen
81611
Eric Pekkala
81611
Co
9709481335Asset builders Inc
Co
Bryanmason@colordao.edu
81623
9702743747
7209368787
Jennifer Eis
Aspen
Ajax Salon & Spa
Co
Nate torres
9704292436
5elementselectric@gmail.com
(970) 948-8706
P.O. Box 11315
Same
Bryan mason
730 E Durant Ave
Aspen
5 elements
Same
Carbondale
Nmt252@yahoo.com
76 Deer Run
710 E Durrant Avenue w-7
81612
03/15/2019
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
Asbestos is a known human carcinogen and is an airborne hazard. Knce airborne, asbestos fibers can stay suspended in the air for days,
weeks, or even months before settling out of the air. The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future, long after the renovation activity occurred. The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989 “ban” on asbestos-containing materials is commonly misunderstood. /n fact, in 1ϵϵ1 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called ͞Asbestos Ban and Phaseout Rule͟ and remanded it to the EPA. Thus, much of the original 1ϵ8ϵ EPA ban
on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was
set aside and D/D EKT TA<E EFFECT. Therefore, ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS INFORMATION
Yes No
Residential: Will you be removing more than ϯϮ sq ft, 50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel ʹ examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
Yes No
Commercial: Will you be removing more than 1ϲ0 sq ft, Ϯϲ0 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel ʹ examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/
or deŵolition perŵit͘ zou will also need to proǀide plans indicating areas to be deŵolisŚed and deterŵine if a
O state deŵolition license is required͘ A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. /f the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean. This letter must be received
BEFKRE a permit will be issued. (See the local or statewide zellow Pages, DexKnLine, or http͗//www.cdphe.state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAzS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDP,E in addition to the
Aspen permit app. This form may be found at https͗//www.colorado.gov/pacific/cdphe/asbestos-forms EKTE͗
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDP,E approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
ASBESTOS CHECKLIST
/ ŚerebLJ certifLJ tŚat tŚe aboǀe inforŵation is true and coŵplete͘
Owner______________________________ Phone #___________________________
Applicant (print name)_________________________________ Phone η___________________
Applicant Signature ___________________________________ Date ______________________
Please call the City of Aspen Environmental ,ealth Department at ϵϮ0-50ϯϵ at any time if you have questions
about asbestos, interpreting your test results, or other matters.
ADDRESS͗ ____________________________PERM/T EUMBER͗ _______________________________
August 2017
- owner of Ajax salon
Capital Commercial Investment Inc.
710 E Durrant Avenue w-7 Aspen, co 81611
970 429 2436
2/6/19
970 9489797Jennifer Eis
03/15/2019
Code Editions
Fire Sprinkler System
Type Kf Construction Fire Alarms /nstalled
Required Special /nspections
Energy Code Compliance
Exterior Energy Use Total Approved Kn-Site Snowmelt________ Spa_______ Pool _________
Building Type/Kccupancy Group
CKMMUE/Tz DEVELKPMEET DEPARTMEET
BUILDING DESCRIPTION FORM - IRC & IBC
C/Tz KF ASPEE 1ϯ0 S. GALEEA ST ͮ ASPEE, CK 81ϲ11
BUILDING CODE INFORMATION
Ϯ015 /RC
Existing?EFPA 1ϯ EFPA 1ϯ R
,igh-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Kther _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
η Stories Above Grade ______ η Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
η Bedrooms ______ η Full Baths ______ Deck Area ______
η ϯ/ϰ Baths ______ η 1/Ϯ Baths ______
η <itchens ______ η Wood Fireplaces ______
η Gas Appliances ______ η Gas Logs______
EFPA 1ϯ D
RESCheck UA Alternative
zes Eo
Kne Family Two Family
Townhouse
Reviewed By͗ _____________________Date͗__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
Ϯnd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
ϯrd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
/s there an ADU?
η Living Rooms_____
η <itchens _____
η Full Baths _____
η ϯ/ϰ Baths _____
η 1/Ϯ Baths _____
η Bedrooms _____
η Kther Rooms (List)____________
ADU BUILDING DESCRIPTION
zes
Eo
PERM/T EUMBER͗ _______________________________
(As Adopted and Amended)
Kther (Please Explain)
_________________
_________________
VA VB /V ///A ///B //A //B /A /B
Sprayed Fire-Resistants
CKMCheck UA Alternative
(Existing + Eew)
A__B
B (A ф50)
F__
,__
/ __
E R__
S__
U
M
I
R
C
I
B
C
Ϯ015 /BC
(As Adopted and Amended)
zes
Eo Required?zes
Eo Type
January 2018
Ϯ015 /EBC
(As Adopted
and Amended)
Kther _____________
Gross Area of Building͗ __________ Gross Area of Unit͗ __________
Kccupant Load͗ ___________
03/15/2019
0015.2019.ACBK
x
x x
x
X
14263
n/a
Letter of Completion Only
Bonnie Muhigirwa 5/9/19
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
Applicability: All development projects must comply with the City͛s zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City͛s oning Kfficer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
/n addition, the oning Kfficer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. /ndependent of this policy, all
projects must comply with all applicable zoning limitations.
The oning Kfficer will inform the applicant during building permit review if verification will be required.
,owever, circumstances may require zoning compliance verification of a project which is already underway.
Timing: ,eight verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the oning Kfficer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City͛s oning Kfficer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information͗
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
Ϯ-For location verification͗ A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
ϯ-For height verification͗ Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary.
ADDRESS͗ ____________________________PERM/T EUMBER͗ _______________________________
August 2017
710 E Durrant Avenue w-7 Aspen, co 81611
03/15/2019
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
ϰ-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
ϲ-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: The oning Kfficer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The oning Kfficer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
/ (contractor name) ______________________________ understand this policy. / agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. / understand that a Certificate of Kccupancy will not be issued until this
project complies with all applicable zoning limitations.
Contractor Signature͗ ___________________________________________
Date͗ ________________________________________________________
ADDRESS͗ ____________________________PERM/T EUMBER͗ _______________________________
August 2017
2/15/19
710 E Durrant Avenue w-7 Aspen, co 81611
03/15/2019