Loading...
HomeMy WebLinkAboutFile Documents.700 Ute Ave.0069.2018 (11).ARBK Rivkin Unit #215, Aspen Alps willis pember architects, inc | 412 n. mill st | aspen, co 81611 3.23.18 CMP To John Barker From Willis Pember Architects Subject CMP – first draft Date 3.82.2018 Project: 700 Ute Avenue, Unit #215 – interior remodel 1.0 General Zero Sq. Ft of soil disturbance 2.0 Project Introduction Total disturbance area is 1,250 sq. ft. - the GSF of the unit. It is located on the second floor of the 200 building towards the east of the complex. 2.2 Site Vicinity Map 2.3 Description Scope of work is a total interior renovation of a 1,252 Sq ft condominium at the aspen alps 200 building. Minor exterior improvements include new skylights, enlarged east elevation openings and the addition of a roof-top condenser unit. 3.0 Project Documentation Permit types: Alteration/Remodel 3/30/2018 Rivkin Unit #215, Aspen Alps willis pember architects, inc | 412 n. mill st | aspen, co 81611 3.23.18 3.0 Project Documentation - continued Project Notification: a. General Contractor Chad Yates Project Manager Silver Sage Building Company (970) 948-0935 b. Owner: Deb Slott 1500 Ocean drive Miami, FL (917) 647 3868 3.3 Project Sign Project will exceed 30 days – we will fabricate a construction sign. 3.4 Contact List: Owner: Deb Slott 1500 Ocean drive Miami, FL (917) 647 3868 GC: Chad Yates Project Manager Silver Sage Building Company (970) 948-0935 Site Supervisor: Chad Yates (see above) Safety officer: NA Traffic Officer: NA Erosion Control: NA 4.0 Project Implementation 4.1 Dates of Construction: 9/15-12/15/2018 – 3 months. 4.2 Hours of Construction: 7:30am - 5:30pm M-F, 9am-5pm Saturday, No work on Sundays or Holidays 4.3 Asbestos Remediation: 9/15-9/19. General Construction: 9/22-12/15. 4.5 Fencing: none required 4.6 NA 4.7 Parks Issues: none – no trees 3/30/2018 Rivkin Unit #215, Aspen Alps willis pember architects, inc | 412 n. mill st | aspen, co 81611 3.23.18 5.0 Project Management 5.1 Complete Parking Management Form (appendix B) 5.2 Read Emergency – see above 5.4 Map – see staging area above 6.0 Traffic Control 6.2 Project haul routes – arrival off of Durant behind Sky Hotel – exit onto Original street and 82. 6.3 Weight and size Limitations of Vehicles – Vehicles need to not exceed width of a standard pick-up truck. Gated domestic entry and exit into and out of site. 3/30/2018 Rivkin Unit #215, Aspen Alps willis pember architects, inc | 412 n. mill st | aspen, co 81611 3.23.18 6.0 Traffic Control - continued 6.4 Construction Vehicles Activities - hours same as above, exceptions as above. - two deliveries at a time max. 6.5 Traffic Plan – NA 8.0 Sedimentation and Erosion Control – NA. Interior remodel, no soil disturbed or excavation. 9.0 Fugitive Dust Control – NA. Interior remodel – no dust generated, no mud on vehicles. 10.0 Emissions 10.1 Vehicles will be properly maintained. 11.0 Noise Suppression 11.2 As no outdoor work will be performed, no noise suppression techniques required. All work 11interior. 3/30/2018 CONSTRUCTION MANAGEMENT Please Refer questions to PLAN CHECKLIST the Engineering Dept. NAME OF PROJECT: _________________ (970-920-5080) NOTES: 1.0 General (OFFICE USE ONLY) ‰ Total SF of soil disturbance/SF of building Demo _____________________ ‰ Table of Contents _____________________ 2.0 Project Introduction ‰ 2.1 Total project disturbance area? _____________________ ‰ 2.2 Project vicinity map _____________________ 2.3 Description that includes: ‰ Background information _____________________ ‰ Proposed development type _____________________ 3.0 Project Documentation ‰ 3.1 Describe permit types, list permit #’s and Include copies of all permits ‰ 3.2 Indicate project notification per CMP Manual ‰ 3.3 Project Sign is constructed and posted o (When construction exceeds 30 days) _____________________ 3.4 Contact list included for: ‰ Owner _____________________ ‰ Contractor _____________________ ‰ Site supervisor _____________________ ‰ Safety officer _____________________ ‰ Traffic officer _____________________ ‰ Erosion control representative _____________________ 4.0 Project Implementation (specify/include items below) ‰ 4.1 Dates of construction _____________________ ‰ 4.2 Hours of construction _____________________ ‰ 4.3 Construction schedule ‰ 4.5 Describe project fencing _____________________ ‰ 4.6 Site map for tree protection fencing/tree _____________________ drip lines (as applicable) ‰ 4.7 Parks Issues – driplines, permits, demo 5.0 Project Management ‰ 5.1 Complete Parking Management form (Appendix B) _____________________ ‰ 5.2 Read Emergency vehicle access and include a copy of ordinance 35 ‰ 5.4 Map showing location of: □ Staging _____________________ □ Trailer _____________________ Materials _____________________ Waste management _____________________ Recycling – specify exact plan 700 ute ave - #215 3/30/2018 6.0 Traffic Control ‰ 6.2 Project haul routes _____________________ ‰ 6.3 Weight and size limitations of vehicles _____________________ ‰ 6.4 Construction vehicles activities defined _____________________ 6.4 Specify delivery vehicle: ‰ Maximum number of deliveries at a time _____________________ ‰ Hours of deliveries _____________________ □ Exceptions to delivery schedule _____________________ 6.5 Include Traffic Control Plan – Prepared by a Certified Traffic Control Supervisor that includes a minimum of: ‰ Site Access locations _____________________ ‰ Street/site signage and barricades for _____________________ traffic and pedestrian control _____________________ ‰ Traffic control related to peak traffic _____________________ hours and special events _____________________ ‰ Traffic flagging areas and hours _____________________ 8.0 Sediment and Erosion Control ‰ 8.1 Storm Water Pollution Prevention Plan _____________________ 8.1 Plan Includes: ‰ Erosion control measures _____________________ ‰ Mud track location _____________________ ‰ Tire washing location _____________________ ‰ Concrete wash location _____________________ 9.0 Fugitive Dust Control ‰ 9.1 Complete a fugitive dust control plan Plan includes: Sediment tracking techniques Water Truck 24-hour contact 10.0 Emissions □ 10.1 Assure proper vehicle maintenance □ 10.2 Opacity – no darker than 40% _____________________ 11.0 Noise Suppression ‰ 11.1 Include a signed noise suppression plan _____________________ ‰ 11.2 Specify noise equipment/methods used per CMP Manual _____________________ REVIEWED BY: _____________________ DATE: 3/30/2018