Loading...
HomeMy WebLinkAboutFile Documents.675 E Durant Ave.0043.2019 (21).ACBKConsulting Engineers • Mechanical • Structural • Energy Crested Butte & Golden Colorado • reginc.com The Little Nell – Lobby and Chair 9 Renovation Change Order 1 Change Narrative May 10, 2019 E101 • Load calculation for Chair 9 section updated to include additional receptacle load. • (2) Convenience receptacles added on plan West side of Chair 9 space. • Data configuration for TVs updated from (4) data drops to (1) data drop and coax • Access panel noted on plan in Chair 9 section • (2) Convenience receptacles added on plan East side of Chair 9 space. • Popcorn maker receptacle to remain instead of being relocated • Existing pantry receptacle to be removed. • (2) RCPTs added in hallway for vitrines • Access panel noted on plan in Lobby area • “Remove clock RCPT” added to Lobby area • Music controls notation for existing controls updated to clarify “Remove music controls” • Added (4) power locations for sconces on fireplace • Updated note in Concierge Desk to read “Add (16) Data Drops and (2) circuits for (4) duplex RCPTs from floor. See Concierge Desk plan for detailed power and data requirements and routing” • Updated note in Reception Desk to read “Add (12) Data Drops and (2) circuits for (3) duplex RCPTs from floor. See Reception Desk plan for detailed power and data requirements and routing” • Updated location for relocating sign drivers and misc. equipment • Added undercounter refrigerator in backroom of Concierge Desk • Added dedicated circuit for charging radios 05/14/2019