HomeMy WebLinkAboutFile Documents.630 E Hyman Ave.0073.2017 (16).ACBK Construction Management Plan for: 630 E. Hyman, Unit #207 Section: 1.0 General: Total SF of Soil Disturbance = N/A Total SF of Building Demo = N/A 2.0 Project Introduction: 2.1 Total Project Disturbance Area = N/A 2.2 Project Vicinity Map – See Attached 2.3 Background Information / Proposed Development Type – The scope of work covered by this permit is an interior tenant finish of existing commercial space. 3.0 Project Documentation: 3.1 Permit types, numbers TBD. 3.2 Project Notification – All neighbors within 300’ of site will be notified of work to be done by letter or personal introduction, including all General Contractor contact information. 3.3 Project Sign – Project Sign will be constructed and posted, General Contractor’s job sign and Building Permit will be posted. City of Aspen Received 07/14/17 Building Department 3.4 Contact List: Owners: General Contractor: Craig Barnes (970) 948-2550 Craig@CBCaspen.com Site Supervisor: Alan Arnold (970) 379-0270 Alanarnold@sopris.net Safety Officer: Alan Arnold (970) 379-0270 Alanarnold@sopris.net 4.0 Project Implementation: 4.1 Dates of Construction – Approximately 9/1/2017-10/15/2017 4.2 Hours of Construction – 7:30 AM to 5:00 PM Monday through Friday and as permitted by City of Aspen. 4.3 Construction Schedule – N/A 4.5 Describe project fencing – Fencing to be 6’ high chain link fencing with fabric visual barrier typical for a project of this type. N/A 4.6 Site map for tree protection – N/A 4.7 Parks Issues – N/A 5.0 Project Management: 5.1 Complete Parking management form – N/A 5.2 Read Emergency vehicle access and include a copy of Ordinance 35 - N/A 5.4 Map showing Location of: N/A: All finish materials to be transported directly into unit. All construction debris to be placed directly into truck for disposal. No job trailer necessary. Staging – N/A Trailer – N/A Materials – N/A City of Aspen Received 07/14/17 Building Department Waste Management – N/A Recycling – Specify exact plan – N/A 6.0 Traffic Control: All below is N/A: 6.2 Project haul routes - 6.3 Weight and size limitations of vehicles – 6.4 Construction vehicles activities defined – Specify Delivery Vehicle: Maximum number of deliveries at a time – Hours of deliveries – Exceptions to delivery schedule – 6.5 Include Traffic Control Plan – Including Site access locations – Street / site signage and barricades for traffic and pedestrian control – Traffic control related to peak traffic hours and special events – Traffic flagging areas and hours – 8.0 Sediment and Erosion Control: All below is N/A: 8.1 Storm Water Pollution Prevention Plan – Including: Erosion Control Measures – Mud track location – Tire washing location – Concrete wash location – City of Aspen Received 07/14/17 Building Department 9.0 Fugitive Dust Control: All below is N/A: 9.1 Complete a fugitive dust control plan – Including: Sediment tracking techniques – Water truck – 24 Hour Contact – 10.0 Emissions: All below is N/A: 10.1 Assure proper vehicle maintenance – 10.2 Opacity – no darker than 40% - 11.0 Noise Suppression: All below is N/A: 11.1 Include an signed noise suppression plan – See Attached 11.2 Specify noise equipment / methods used per CMP Manual - City of Aspen Received 07/14/17 Building Department