Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.629 W Smuggler St.0173.2017 (6).ARBK
Iglehart Construction 617 W Main St Aspen, CO 81611 (970) 925.5990 Item/Cost Code Description Amount 1181 Jimmie Johnson 1 General Requirements 10150.000 Superintendent 35,000.00 10200.007 Winter Protection 3,000.00 10200.009 General Labor 10,000.00 10200.010 Trash Dumpster 2,300.00 10200.011 Te mporary Fencing 1,000.00 10201.000 Contractor Fee 40,519.00 10206.000 Parking Permits 5,500.00 10500.001 Rental Equipment 3,200.00 10527.000 Portable Toilet 800.00 10800.000 Surveying 2,500.00 Division Total:103,819.00 2 Site Requirements 20231.001 Demolition 15,000.00 20231.009 Crane 2,100.00 20235.000 Excavation 8,500.00 20236.000 Backfill 3,500.00 20262.000 Drywell 7,500.00 21200.004 Irrigation 500.00 21202.000 Slab Prep 1,850.00 Division Total:38,950.00 3 Concrete 30331.003 Concrete 9,132.00 Division Total:9,132.00 4 Masonry 40000.000 Masonry 140,000.00 Division Total:140,000.00 7 Thermal/Moisture Protection 70901.000 Thermal&Moisture Protection 1,200.00 Division Total:1,200.00 15 Mechanical 150350.000 Snowmelt 16,250.00 Division Total:16,250.00 City of Aspen Received 8/4/17 Building Department Proposal 2 of 2 Continued... 07/20/17 Page jamespi Report 6-1-11-52 Item/Cost Code Description Amount 16 Electrical 160101.000 Electrical 1,300.00 Division Total:1,300.00 Grand Total:310,651.00 City of Aspen Received 8/4/17 Building Department