HomeMy WebLinkAboutFile Documents.555 E Durant Ave.0050.2018 (4).ARBK
Katz Residence
555 E. Durant Ave., Unit 3E
North of Nell Condominiums
Aspen, Co 81611
City of Aspen
Construction Management Plan
January 29, 2018
2.0 Project Introduction
2.1 Disturbance Area:
None: Interior renovation
2.2 Location:
555 E. Durant Avenue, Unit 3E, North of Nell Condominiums
Aspen, CO 81611
2.3 Description:
A complete interior renovation of 2 bedroom/ 2 bath condominium. No
exterior work to be performed.
3.0 Project Documentation
3.1 Permits: A City of Aspen permit has been applied for on February x,2018.
3.2 Public Notification:
A project letter will be sent to the HOA and management company
before the start of construction complying with City of Aspen
requirements.
3.3 Project Sign
N/A.
3.4 Contact List
Owner: Linnie and Michael Katz
Contractor: TBD
Supervisor: TBD
Safety Officer: TBD
Traffic Officer: TBD
Erosion Control representative: N/A
3/06/2018
Received 3/14/18
AK
Please provide
square footage
Required
Required
4.0 Project Implementation
4.1 Dates of Construction:
TBD
4.2 Hours of Construction:
Per City of Aspen regulations:
Monday – Friday 7:30 am to 5:30 pm
Saturday 9:00 am to 5:00 pm
4.3 Construction Schedule:
5.0 Parking Management
5.1 Parking Management Form
5.2 Emergency Vehicle Access and Ordinance 35
Emergency vehicle access will remain open at all times
5.4 Staging Areas
TBD
5.5 Construction Trailer, materials storage and Waste Management
No trailer, parking lot for material delivery, dumpster provided by HOA?
6.0 Traffic Control
Not Applicable to this permit
6.5 Traffic Control Plan
Not Applicable to this permit
8.0 Sediment and Erosion Control
Not Applicable to this permit
9.0 Fugitive Dust Control
Not Applicable to this permit
10.0 Emissions
Not Applicable to this permit
11.0 Noise Suppression
11.1 General
Compliance with the 70-decibel noise limit will be insured from June 1st
through Labor Day. Compliance of the 80-decibel noise limit will be
insured from Labor Day through May 31st.
11.2 Noise Suppression Plan
Exhibit”C” is the signed copy of the City of Aspen Construction Noise
Suppression Plan.
11.3 Requirements for Activities Exceeding 80 Decibels
All applicable rules & regulations will be complied with. Written
notification to surrounding neighbors within 300 feet of the project will be
distributed as necessary.
3/06/2018
Required
Required
Please confirm
3/06/2018
3/06/2018
3/06/2018
3/06/2018
3/06/2018