Loading...
HomeMy WebLinkAboutFile Documents.555 E Durant Ave.0120.2017 (2).ARBKCON ENVIRONMENTAL CONSULTANTS ...brp-athe e-asU... Final Clearance Air Monitoring Services Date: May 25, 2017 Project: Abatement of ACM ceiling texture, floor tile and sheet vinyl flooring prior to interior renovation at North of Nell Condominiums, Unit 2I, Aspen, Colorado. Contractor: Prestige Environmental Services, Aurora, Colorado Air Monitoring Description: Phase Con provided final clearance air monitoring services at the project site listed above on May 25, 2017. Air samples were situated inside the enclosure so as to be representative of the entire work space. Air samples were obtained utilized aggressive sampling methods to aid in ensuring that any fibrous material left in the enclosure would be entrained in the air during the sampling period. Abatement Description: Abatement of ACM ceiling texture, floor the and sheet vinyl flooring prior to interior renovation. Comments and Recommendations: PCM analysis of the final clearance air samples revealed airborne fiber levels inside the containment area(s) to be less than the Colorado State Maximum Allowable Asbestos Level (MAAL) and the EPA clearance level of 0.010 fibers per cubic centimeter of air; therefore, the area(s) may be re-occUp+ finder non -abatement conditions. Do as A. Close orado State Air Monitoring Specialist #2930 2 2166 Peregrine Court Grand Junction, CO81507 Office: 970-260-33411 pceconsultants@gwestoffice.net --wSE CON ENVIRONMENTAL CONSULTANTS PCM LABORATORY ANALYSIS OSHA Reference Method - NIOSH 7400 Client: North of Nell Condominium Assoc. Sampling Date: 5/25/17 Aspen, Colorado Technician/Analyst: D. Close Project: North of Nell Condominium, Unit 2I CDPHE Technician ID: 2930 Aspen, Colorado Abatement Contractor: Prestige Environmental Services, Aurora, Colorado Description of Work: Abatement of ACM ceiling texture, floor tile and sheet Vinyl flooring prior to interior renovation. SAMPLE SAMPLE DESCRIPTION AIR VOLUME fibers/fields ID f /nn 01 Final Clearance Sample - 446 L 5.0/100 Unit Interior Enclosure <0.008 f/cc 02 Final Clearance Sample - 446 L 6.0/100 Unit Interior Enclosure <0.008 F/CC 03 Final Clearance Sample - 446 L 6.5/100 Unit Interior Enclosure <0.008 F/CC 04 Final Clearance Sample - 446 L 5.0/100 Unit Interior Enclosure <0.008 F/CC 05 Final Clearance Sample - 446 L 6.0/100 Unit Interior Enclosure <0.008 F/CC 06 Blank ----- NONE DETECTED 07 Blank ----- NONE DETECTED * Colorado State Clearance Level is 0.010 f/cc of air Technician/Analyst: 2160 Peregrine court. Grand junction, Co 8-',07 Rif, JO: 0--200--3341 oce,: ons5.�l ants kq estoffice.nef Certificates Phase Con Environmental Consultants, LLC 2166 Peregrine Court Grand Junction, CO 81507 (970) 260-3341 pceconsultants@qwestoffice.net BILL TO North of Nell Condominium Association 555 E. Durant Street Aspen, CO 81611 Please detach top portion and return with your payment. OWNerrucoraur+um INVOICE # 7567 DATE 05/29/2017 DUE DATE 05/29/2017 TERMS Due on receipt ACTIVITY AMOUNT Asbestos Air Monitoring 500.00 Asbestos Final Clearance Air Monitoring Services - North of Nell Condominium, Unit 21, Aspen, Colorado - 5/25/17: Mileage 140.00 Mileage: 250 Miles @ $0.56/Mile: ----------- ---------------------------------- ------------------ ------------------------------ ----------- ----------- -..-..-. TAX ID#: 26-2007377. This BILL is due upon receipt. BALANCE DUE $640.00 Thank you. THIS BILL IS DUE TO BE PAID WHEN RECEIVED