HomeMy WebLinkAboutFile Documents.555 E Durant Ave.0120.2017 (2).ARBKCON
ENVIRONMENTAL CONSULTANTS
...brp-athe e-asU...
Final Clearance Air Monitoring Services
Date: May 25, 2017
Project: Abatement of ACM ceiling texture, floor tile and sheet vinyl
flooring prior to interior renovation at North of Nell Condominiums, Unit
2I, Aspen, Colorado.
Contractor: Prestige Environmental Services, Aurora, Colorado
Air Monitoring Description:
Phase Con provided final clearance air monitoring services at the project
site listed above on May 25, 2017. Air samples were situated inside the
enclosure so as to be representative of the entire work space. Air
samples were obtained utilized aggressive sampling methods to aid in
ensuring that any fibrous material left in the enclosure would be
entrained in the air during the sampling period.
Abatement Description:
Abatement of ACM ceiling texture, floor the and sheet vinyl flooring prior
to interior renovation.
Comments and Recommendations:
PCM analysis of the final clearance air samples revealed airborne fiber
levels inside the containment area(s) to be less than the Colorado State
Maximum Allowable Asbestos Level (MAAL) and the EPA clearance level
of 0.010 fibers per cubic centimeter of air; therefore, the area(s) may
be re-occUp+ finder non -abatement conditions.
Do as A. Close
orado State Air Monitoring Specialist #2930
2
2166 Peregrine Court
Grand Junction, CO81507
Office: 970-260-33411 pceconsultants@gwestoffice.net
--wSE CON
ENVIRONMENTAL CONSULTANTS
PCM LABORATORY ANALYSIS
OSHA Reference Method - NIOSH 7400
Client: North of Nell Condominium Assoc. Sampling Date: 5/25/17
Aspen, Colorado Technician/Analyst: D. Close
Project: North of Nell Condominium, Unit 2I CDPHE Technician ID: 2930
Aspen, Colorado
Abatement Contractor: Prestige Environmental Services, Aurora, Colorado
Description of Work: Abatement of ACM ceiling texture, floor tile and sheet
Vinyl flooring prior to interior renovation.
SAMPLE SAMPLE DESCRIPTION AIR VOLUME fibers/fields
ID f /nn
01
Final Clearance Sample -
446 L
5.0/100
Unit Interior Enclosure
<0.008 f/cc
02
Final Clearance Sample -
446 L
6.0/100
Unit Interior Enclosure
<0.008 F/CC
03
Final Clearance Sample -
446 L
6.5/100
Unit Interior Enclosure
<0.008 F/CC
04
Final Clearance Sample -
446 L
5.0/100
Unit Interior Enclosure
<0.008 F/CC
05
Final Clearance Sample -
446 L
6.0/100
Unit Interior Enclosure
<0.008 F/CC
06
Blank
-----
NONE
DETECTED
07
Blank
-----
NONE
DETECTED
* Colorado State Clearance Level is 0.010 f/cc of air
Technician/Analyst:
2160 Peregrine court.
Grand junction, Co 8-',07
Rif, JO: 0--200--3341 oce,: ons5.�l ants kq estoffice.nef
Certificates
Phase Con Environmental Consultants, LLC
2166 Peregrine Court
Grand Junction, CO 81507
(970) 260-3341
pceconsultants@qwestoffice.net
BILL TO
North of Nell Condominium
Association
555 E. Durant Street
Aspen, CO 81611
Please detach top portion and return with your payment.
OWNerrucoraur+um
INVOICE # 7567
DATE 05/29/2017
DUE DATE 05/29/2017
TERMS Due on receipt
ACTIVITY AMOUNT
Asbestos Air Monitoring 500.00
Asbestos Final Clearance Air Monitoring Services - North of Nell Condominium, Unit 21, Aspen, Colorado
- 5/25/17:
Mileage 140.00
Mileage: 250 Miles @ $0.56/Mile:
----------- ---------------------------------- ------------------ ------------------------------ ----------- ----------- -..-..-.
TAX ID#: 26-2007377. This BILL is due upon receipt. BALANCE DUE $640.00
Thank you.
THIS BILL IS DUE
TO BE PAID WHEN
RECEIVED