Loading...
HomeMy WebLinkAboutFile Documents.555 E Durant Ave.0120.2017 (6).ARBKDoug Throm Construction, Inc 617 W. Main Street Aspen, CO 970 920-1719 Zarnegin Residence North of Nell, Unit 2I Aspen, Co 81611 City of Aspen Construction Management Plan June 7, 2017 2.0 Project Introduction 2.1 Disturbance Area: None: Interior renovation 2.2 Location: 120 E Hyman Ave Aspen, CO 81611 2.3 Description: An interior renovation of an existing 3 bedroom/ 3 bath condominium unit. Entire unit gutted (asbestos mitigation). New gas boiler and new electrical. All new interior finishes. NO Exterior fenestration modification 3.0 Project Documentation 3.1 Permits: A City of Aspen permit has been applied for on June 8th, 2018 3.2 Public Notification: North of Nell Management has been informed and will notify all other tenants in the building before the start of construction complying with City of Aspen requirements. 3.3 Project Sign A project sign, complying with City of Aspen specifications, will be erected before the start of construction. 3.4 Contact List Owner: Robert Zarnegin Contractor: Doug Throm Construction, Inc Supervisor: Mike McKie Safety Officer: Mike Mckie Traffic Officer: Mike Mckie Erosion Control representative: N/A Received 6/13/17 Doug Throm Construction, Inc 617 W. Main Street Aspen, CO 970 920-1719 4.0 Project Implementation 4.1 Dates of Construction: September 1st 2017- December 15, 2017 4.2 Hours of Construction: Per City of Aspen regulations: Monday – Friday 7:30 am to 5:30 pm Saturday 9:00 am to 5:00 pm 4.3 Construction Schedule: 5.0 Parking Management 5.1 Parking Management Form 5.2 Emergency Vehicle Access and Ordinance 35 Emergency vehicle access will remain open at all times 5.4 Staging Areas See Exhibit “A” CMP site plan 5.5 Construction Trailer, materials storage and Waste Management See Exhibit “A” CMP site plan 6.0 Traffic Control Not Applicable to this permit 6.5 Traffic Control Plan Not Applicable to this permit 8.0 Sediment and Erosion Control Not Applicable to this permit 9.0 Fugitive Dust Control Not Applicable to this permit 10.0 Emissions Not Applicable to this permit 11.0 Noise Suppression 11.1 General Compliance with the 70-decibel noise limit will be insured from June 1st through Labor Day. Compliance of the 80-decibel noise limit will be insured from Labor Day through May 31st. 11.2 Noise Suppression Plan Exhibit”C” is the signed copy of the City of Aspen Construction Noise Suppression Plan. 11.3 Requirements for Activities Exceeding 80 Decibels All applicable rules & regulations will be complied with. Written notification to surrounding neighbors within 300 feet of the project will be distributed as necessary. Received 6/13/17