Loading...
HomeMy WebLinkAboutFile Documents.555 E Durant Ave.0120.2017 (11).ARBK• • Home Pemit Nom • I • • �011• ,All applications for a building permit within the City of Aspen are required to include a certification o compliance with applicable covenants and homeowner association policies. The oertification must be he followinq certification 10 I, the ro erty ofy aso k one)�M, • •❑ proposed in this building Dermit do nM. require approval by the homeowners association or covenant beneficiary4M 40 400 RIOTMT"R"" tR h meowners association or private covenant and the improvemen s proposed in this buildin permit have been approved b the homeowners association or covenant beneficiary f� 1 un erstan a City o seenoes not interpret, enforce, or manage t e applicability, meaning or effect of private covers o iation 61 t; Vyl I W and that this document is a public document. can O er s gna ure: I a e.�// 74L ' Permit No. • • •ing compliar� • Verification Palicy • iof.SAM � •010 Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completioneWhen required by the Citys Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance •through submission of a survey report. • • • 11011 •• Lne'rwisexem�p%T�l oommercia, mu i -army, o ging, an mxe -us—T r�"J�e 'projecs Jin roposed within one foot of the maximum permissible height or www onA f�ot of a lowabl etbacks shall verify zoninsa com�throu h this method. addition, the Zoning Officer may require this method be used to verify zoning compliance for ngle-family/duplex development or other projects where compliance may be in question. dependent of this policy, ah projects must comply with all applicable zoningit�jons. ThtZorvng Off�r Will inform the applicant during building ,rmit revi� if ri••fication'E6ill go ,irequired. However, circumstances may require zoning compliance verification of a roject which s already underway. • • • • • • • •• • JIming: �'eyuiglt vencca• n shouild be • mplis• at•po* olamno rucTio• en enough r- _._ •structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to I qJ r�q�meryts. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms" to n_nete p Survey Report:&A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approvedbuilding permit plan set. The Citys Zoning Officer can assist in determining which elements of the structure should be measured and If natural or finished rashould be used. •���r�•• - •�■r owA DneTcover e�er r i 1e"iiu�ldin a num er, nameeof epi 'pro7jG, SPUR owner @�aand general contractor, with a written descri tion of the measurement method g �date(s) of measurement. , For location verification: A plan drawing showing property boundaries, permitted setbacks wilding envelope (if applicable), location of foundation walls, location of the outermost WhMerior of each structure (inclusive of all exterior veneer or other exterior treatment e location and dimension of each observed measurement. E for he-verifElevation drawings show ingt e natura or ws a grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding 1811 exterior surface treatments such as shakes, singles, or other veneer treatments or ornamentation), and the location and dimension of each observed measurement. Addition I roof plans showing location of measurements may be neoessaryM � • in Plans and elevations must include height or setback exemption items unique to the building* such as stair/elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other 0 Re report snail inclucie a written aescription or drawing notes of Ine benchmarks or con ro points used to establish property b�¢dgn s, s tbac s, biding location, it ing hhih i mn and grades for each measureet. ❑All drawings must correlate with the building locetioati�s, and �ading/drainage representations in the approved building permit set. �� •• W ❑ eThe report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements are -- `` accurately represented. "ielland Acceptance of Report. The Zoning Offigr shall review the Mport(s) Mid eithp confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine Owhich elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey raHnngs othehy repo mus corre a e wi representations in a approve3TiuTr in! permit set for acceptIVce. ModQcations to field cc ions or arVnirents�t uillling permdp maybe required. W •e• 40 IDA determination of non-compliance shall result in the issuance of a correction notice and possible, work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practy Il tt� r n pro ass t�minimi% WWtion to th�nstructio dule. J * � _ Joe* ent: I (contractor name) *114A NOW dis po cy. I agree a this project will comply with thA zoning limitations affecting this parcel and the representation made on the zoning sheets oft a approved building permit plans. I understand that a Certi icatew u�cyot be�ssug u l this projt cora* 1i $ applicable zo g limitations elie Dale: •