Loading...
HomeMy WebLinkAboutFile Documents.535 E Hyman Ave.0040.2019.ACBK MEMORANDUM 600 East Hopkins Avenue, Suite 303 Aspen, Colorado 81611 PH / FX 970 925 1125 daverybak.com TO: Justin Hahn, City of Aspen, Plan Examiner FROM: Dave Rybak DATE: May 7, 2019 RE: 535 E. Hyman Avenue, Unit 105 – Permit #0020.2019.ACBK Please accept these revised drawings filed as Change Order #1 for the Alice + Olivia Tenant Improvement. Scope of the Change Order: SHEET A-000 Revised Drawings Index; removal of Mechanical drawings from set. SHEET A-020 UNIT 105 – ALICE + OLIVIA BULDING CODE PLAN 1. Door from Back of House to Retail area swings into the Back of House Space. Per I.B.C. 1010.1.2.1., occupancy of area is less than 50. SHEET A-205 UNIT 105 FLOOR PLAN – ALICE + OLIVIA 1. Door from Back of House to Retail area swings into the Back of House Space. Per I.B.C. 1010.1.2.1., occupancy of area is less than 50. 2. Existing Back of House wall – Remove GPDW, install PWD and Wood Finish 3. Mirror applied to Retail faces of Changing Rooms 2 & 3 North Walls FINISH SCHEDULE – Revised DOOR SCHEDULE – Door 105, wood applique UNIT 105 RCP – ALICE + OLIVIA – REVISED 1. Eliminate GPDW Ceiling 2. Install PWD Cloud Ceiling 3. Relocate existing Track Lighting DETAIL 2 – UNIT 105 WALL EXTENSTION 1. Walls stay at existing height – no extension 2. Modify wall, remove GPDW, install Fire Treated plywood, apply wood accent panels. DETAIL 3 – UNIT 105 – CLOUD CEILING DETAIL – New detail DETAIL 4 – UNIT 105 DOOR JAMB – Revised for wood applique 05/09/2019 535 E. Hyman Ave., Unit 105 Change Order #1 May 7, 2019 2 SHEET A-805 Revise interior elevations per plan adjustments SHEETS M-00 & M-100 Removed from set. Open Ceiling requires no change to existing Mechanical system. SHEET E-000 No revisions, included as part of the stamped electrical set SHEET E-001 1. Luminaire Schedule deleted. No new fixtures, existing to be reused, or relocated. 2. Revised COMMCheck SHEET E-100 1. Revised Demolition Notes 2. Revised Electrical Floor Plan – reuse of existing track fixtures. Attachments: Sheet A-000 GENERAL REFERENCE Sheet A-020 FIRST FLOOR CODE ANALYSIS Sheet A-205 FLOOR PLAN AND RCP Sheet A-805 INTERIOR ELEVATIONS Sheets E-000, E-001 & E-100 Updated 05/09/2019