HomeMy WebLinkAboutFile Documents.535 E Hyman Ave.0080.2018 (2).ACBK Construction Management Plan 535 E. Hyman Ave. Units 103 1. Project Introduction 1.1. Unit 108 located on the 1st floor of the Core building located at 535 E. Hyman Ave. will have a floor system framed up to street level. This space is 749SF of floor area. Material staging will be located on the south side of the building with in the alley access and long term storage will be in the space itself. 1.2. Vicinity Map: 1.3. The property contains a mixed use building located in downtown Aspen on the SW corner of Hyman and Hunter Ave. There is an existing occupied tenant space in the basement of this building. The scope of this remodel will be completed in 1 phase. We anticipate starting the project in the beginning of October with the expectation of total project buildout taking no more than four weeks. This building is serviced by public utilities. There are no plans for upgrading any of the utility services. 2. Project Documentation 2.1. Adjacent properties will be notified of work and provided contact information via the posting of the project sign the immediate neighbor will be notified of this construction and informed on an as need basis of possible construction impacts. This sign will include a brief scope of work and list contractor’s contact information. Because impacts beyond the licensed ROW area are not anticipated, specific notification and on-site meeting should not be necessary. 2.2. A project sign will be posted on the entry door of the building with the 07/23/2018 contractor's contact information. 2.3. Contact List: Owner: Mocking Bird Interests, LLC General Contractor: G.F.Woods Construction, Greg Woods (970) 544-1833 / (970) 948-6483 Site Supervisor: Chris Dykes (970) 379-1282 Safety Officer: Chris Dykes (970) 379-1282 Traffic Officer: Chris Dykes (970) 379-1282 3. Project Implementation 3.1. Dates of Construction: Construction is expected to last 9 weeks (September 10,2017 – November, 2018) and will only occur on approved dates Monday through Saturday. 3.2. Hours of Construction: Construction activity will only occur during the allowed hours of 7:30AM and 5:30PM Mon - Friday and 9AM to 5PM on Saturdays. 3.3. Excavation will not occur or encroach within 5’ of the property line. 3.4. Project is all interior scope so no job site fencing will be installed. 3.5. Project shall uphold utmost respect for public health and welfare. 4. Project Management 4.1. Parking for subcontractors and GF Woods Construction employees will be limited to street parking. Temporary material staging will be located on the south side of the building in the alley as well. 4.2. Parking at the site is limited and is all metered. Carpooling and public transit will be encouraged and utilized to the greatest extent practicable. 4.3. Map of Construction Management Plan is attached as Exhibit A. 5. Traffic Control 5.1. Traffic Control Supervisor will manage operations, if and when necessary. 5.2. Designated haul routes will be followed. Exhibit B 5.3. Maximum vehicle weight shall not exceed 10,000lbs. 5.4. Any traffic control required for deliveries will be coordinated with the City of Aspen Engineering Department. Deliveries will not be scheduled outside of the approved hours of construction. No more than one delivery truck can be accommodated at any time. Deliveries will be unloaded via the entry doors on the Hyman Ave in early morning hours or through the alleyway to the south of the building. 5.5. A Traffic Control Plan is not included as road blockages or traffic stoppages are not scheduled or anticipated due to the limited scope and nature of the project. 6. Pedestrian Protection 6.1. Pedestrian safety will be maintained per City Code Section 21.04.060, MUTCD Chapter 6D, the Americans with Disability Act, and IBC Chapter 33. 7. Sediment and Erosion Control – NA 8. Fugitive Dust Control – N/A. 9. Emissions – All construction vehicles will be maintained and in good running order. 10. Noise Suppression 10.1. Construction noise will be limited to 80 decibels at the property line whenever possible. And are not expected to be a concern with all construction activity contained indoors. 10.2. Loud or obtrusive work will be completed during the approved hours of 9AM to 5PM (Monday through Friday only). Neighbors will be notified 3 days advance. 07/23/2018