HomeMy WebLinkAboutFile Documents.535 E Hyman Ave.0068.2018 (5).ACBKCOMcheck Software Version 4.0.8.1
Mechanical Compliance Certificate
Project Title:
2015 IECC
Project Type:Alteration
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
535 E. Hyman Ave. Unit 201
Aspen, CO 81611
Owner/Agent:
Aspen Core - Unit 201
535 E. Hyman Ave. Unit 201
Aspen, CO 81611
Designer/Contractor:
BG Buildingworks
251 Linden St. #200
Fort Collins, CO 80524
970.221.5691
Project Information
Energy Code:
Aspen Core - Unit 201
Mechanical Systems List
Quantity System Type & Description
Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 65 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Hydronic Coil, Capacity = 45 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: FCU-1 -- Compliance (Motor nameplate HP method) : Passes
Fans:
SA Supply, Single-Zone VAV, 2340 CFM, 1.0 motor nameplate hp, 0.0 fan efficiency grade
5 FCU-1 (Single Zone):
Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 27 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Hydronic Coil, Capacity = 21 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: FCU-2 -- Compliance (Motor nameplate HP method) : Passes
Fans:
SA Supply, Single-Zone VAV, 1170 CFM, 0.5 motor nameplate hp, 0.0 fan efficiency grade
1 FCU-2 (Single Zone):
Electric Storage Water Heater, Capacity: 19 gallons w/ Circulation Pump
No minimum efficiency requirement applies
1 EWH-1:
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
Aspen Core - Unit 201
S:\BGProjects\9203.08 Aspen Core - Second Floor Unit 201\Engineering\Comcheck\9203.08 Aspen
Core Unit 201 Comcheck.cck
05/10/18Report date:
111 ofPage
Erin Pasold, Project Manager 05.10.18
05/23/2018
06/15/2018
justinh
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.0.8.1
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR2]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C103.2
[PR3]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Core - Unit 201
S:\BGProjects\9203.08 Aspen Core - Second Floor Unit 201\Engineering\Comcheck\9203.08 Aspen
Core Unit 201 Comcheck.cck
05/10/18Report date:
112 ofPage05/23/2018
06/15/2018
justinh
Section
#
& Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
C403.2.4.
5,
C403.2.4.
6
[FO9]3
Snow/ice melting system sensors for
future connection to controls. Freeze
protection systems have automatic
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Core - Unit 201
S:\BGProjects\9203.08 Aspen Core - Second Floor Unit 201\Engineering\Comcheck\9203.08 Aspen
Core Unit 201 Comcheck.cck
05/10/18Report date:
113 ofPage05/23/2018
06/15/2018
justinh
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.6.1,
C404.6.2
[PL3]1
Automatic time switches installed to
automatically switch off the
recirculating hot-water system or heat
trace.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Core - Unit 201
S:\BGProjects\9203.08 Aspen Core - Second Floor Unit 201\Engineering\Comcheck\9203.08 Aspen
Core Unit 201 Comcheck.cck
05/10/18Report date:
114 ofPage05/23/2018
06/15/2018
justinh
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Core - Unit 201
S:\BGProjects\9203.08 Aspen Core - Second Floor Unit 201\Engineering\Comcheck\9203.08 Aspen
Core Unit 201 Comcheck.cck
05/10/18Report date:
115 ofPage05/23/2018
06/15/2018
justinh
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C402.2.6
[ME41]3
Thermally ineffective panel surfaces of
sensible heating panels have
insulation >= R-3.5.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.13
[ME71]2
Unenclosed spaces that are heated
use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.3
[ME55]2
HVAC equipment efficiency verified.Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.2.6.
1
[ME59]1
Demand control ventilation provided
for spaces >500 ft2 and >25
people/1000 ft2 occupant density and
served by systems with air side
economizer, auto modulating outside
air damper control, or design airflow
>3,000 cfm.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.6.
2
[ME115]3
Enclosed parking garage ventilation
has automatic contaminant detection
and capacity to stage or modulate
fans to 50% or less of design capacity.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.7
[ME57]1
Exhaust air energy recovery on
systems meeting Table C403.2.7(1)
and C403.2.7(2).
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.8
[ME116]3
Kitchen exhaust systems comply with
replacement air and conditioned
supply air limitations, and satisfy hood
rating requirements and maximum
exhaust rate criteria.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.9
[ME60]2
HVAC ducts and plenums insulated.
Where ducts or plenums are installed
in or under a slab, verification may
need to occur during Foundation
Inspection.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.9
[ME10]2
Ducts and plenums sealed based on
static pressure and location.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.9.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.9.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.2.
1
[ME50]2
Three-pipe hydronic systems using a
common return for hot and chilled
water are not used.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Core - Unit 201
S:\BGProjects\9203.08 Aspen Core - Second Floor Unit 201\Engineering\Comcheck\9203.08 Aspen
Core Unit 201 Comcheck.cck
05/10/18Report date:
116 ofPage05/23/2018
06/15/2018
justinh
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C403.4.2.
1
[ME50]2
Three-pipe hydronic systems using a
common return for hot and chilled
water are not used.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.4.2.
6
[ME26]3
Chilled water plants with multiple
chillers have capability to reduce flow
automatically through the chiller plant
when a chiller is shut down. Boiler
plants with multiple boilers have the
capability to reduce flow automatically
through the boiler plant when a boiler
is shut down.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.4.2.
6
[ME26]3
Chilled water plants with multiple
chillers have capability to reduce flow
automatically through the chiller plant
when a chiller is shut down. Boiler
plants with multiple boilers have the
capability to reduce flow automatically
through the boiler plant when a boiler
is shut down.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.4.4.
6
[ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
See the Mechanical Systems list for values.
C403.4.4.
6
[ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
See the Mechanical Systems list for values.
C403.4.5
[ME31]3
Condenser heat recovery system that
can heat water to 85 ºF or provide
60% of peak heat rejection is installed
for preheating of service hot water.
Complies
Does Not
Not Observable
Not Applicable
Exception: Facility operates 24/7.
C403.4.5
[ME31]3
Condenser heat recovery system that
can heat water to 85 ºF or provide
60% of peak heat rejection is installed
for preheating of service hot water.
Complies
Does Not
Not Observable
Not Applicable
Exception: Facility operates 24/7.
C408.2.2.
1
[ME53]3
Air outlets and zone terminal devices
have means for air balancing.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.2.
2
[ME54]3
HVAC hydronic heating and cooling
coils have means to balance and have
pressure test connections.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.2.
2
[ME54]3
HVAC hydronic heating and cooling
coils have means to balance and have
pressure test connections.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.5,
C403.5.1,
C403.5.2
[ME123]3
Refrigerated display cases, walk-in
coolers or walk-in freezers served by
remote compressors and remote
condensers not located in a
condensing unit, have fan-powered
condensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5.2..
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Core - Unit 201
S:\BGProjects\9203.08 Aspen Core - Second Floor Unit 201\Engineering\Comcheck\9203.08 Aspen
Core Unit 201 Comcheck.cck
05/10/18Report date:
117 ofPage05/23/2018
06/15/2018
justinh
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Core - Unit 201
S:\BGProjects\9203.08 Aspen Core - Second Floor Unit 201\Engineering\Comcheck\9203.08 Aspen
Core Unit 201 Comcheck.cck
05/10/18Report date:
118 ofPage05/23/2018
06/15/2018
justinh
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C303.3,
C408.2.5.
3
[FI8]3
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.2
[FI27]3
HVAC systems and equipment
capacity does not exceed calculated
loads.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1.2
[FI38]3
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1.3
[FI20]3
Temperature controls have setpoint
overlap restrictions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
2
[FI39]3
Each zone equipped with setback
controls using automatic time clock or
programmable control system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
2.1,
C403.2.4.
2.2
[FI40]3
Automatic Controls: Setback to 55°F
(heat) and 85°F (cool); 7-day clock, 2-
hour occupant override, 10-hour
backup
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
2.3
[FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
2.3
[FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.3
[FI11]3
Heat traps installed on supply and
discharge piping of non-circulating
systems.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C404.4
[FI25]2
All piping insulated in accordance with
section details and Table C403.2.10.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Core - Unit 201
S:\BGProjects\9203.08 Aspen Core - Second Floor Unit 201\Engineering\Comcheck\9203.08 Aspen
Core Unit 201 Comcheck.cck
05/10/18Report date:
119 ofPage05/23/2018
06/15/2018
justinh
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C404.6.1
[FI12]3
Controls are installed that limit the
operation of a recirculation pump
installed to maintain temperature of a
storage tank. System return pipe is a
dedicated return pipe or a cold water
supply pipe.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C408.2.1
[FI28]1
Commissioning plan developed by
registered design professional or
approved agency.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.3.
1
[FI31]1
HVAC equipment has been tested to
ensure proper operation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.3.
2
[FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.4
[FI29]1
Preliminary commissioning report
completed and certified by registered
design professional or approved
agency.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.5.
1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.5.
3
[FI43]1
An air and/or hydronic system
balancing report is provided for HVAC
systems.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.5.
4
[FI30]1
Final commissioning report due to
building owner within 90 days of
receipt of certificate of occupancy.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Aspen Core - Unit 201
S:\BGProjects\9203.08 Aspen Core - Second Floor Unit 201\Engineering\Comcheck\9203.08 Aspen
Core Unit 201 Comcheck.cck
05/10/18Report date:
1110 ofPage05/23/2018
06/15/2018
justinh
Project Title:
Data filename:
Aspen Core - Unit 201
S:\BGProjects\9203.08 Aspen Core - Second Floor Unit 201\Engineering\Comcheck\9203.08 Aspen
Core Unit 201 Comcheck.cck
05/10/18Report date:
1111 ofPage05/23/2018
06/15/2018
justinh