HomeMy WebLinkAboutMaster Permit.975 Chatfield Rd.0224.2017.ARBK COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
MASTER PERMIT: ______________________DATE:___________
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
__________________________________________________________________________________
____________________________________________________________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
PERMIT NUMBER: __________________________
Commerical
Multi-Family
Single Family
Use of Building Class of Work
New
Addition
AlterationRepair
________
Yes
No
Will there be
any roof/wall
penetrations?
NOTICE: This permit becomes null and
void if work or construction authorized
is not commenced within 180 days, or
if construction or work is suspended or
abandoned for a period of 180 days at
any time after work is commenced.
__________________
_________________
__________________
____________________
________________
_________________
__________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
SQ FT OF LAND-SCAPE WORK
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use
IFFR
Tenant FinishDemolition
Change Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Energy Code REMP School Ded.
Zoning (50%)Plan Check
(Hourly)
TDM Impact
Engineering Review Zoning (Hourly)Ped. Amenity
CMP (50%)Engineering
(Hourly)
Housing Cash in Lieu
Parks Review Zoning (50%)Stormwater
Utility Review CMP (50%)City Use Tax
Other Electrical County Use Tax
Plumbing GIS
Mechanical Sanitation
SUBMITTAL FEES ISSUANCE FEES
__________________PLANS LOCATION
_________Lot Area
_________Zone District
_________Deed Restricted
_________Census Code
_________# of Dwellings
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets
____Bathtub
____Lavatory (Wash Basin)
____Shower
____Kitchen Sink (+Disposal)
____Dishwasher
____Laundry Bar, Utility Sink
____Clothes Washer
____Floor Sink
____Floor Drain
____Shower
____Water Heater (Pan Req)
____# Gas Outlets
____Water Treatment
____Other_________
Fixture Counts
____Forced Air/Gravity Systems
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew
____Appliance Vents
____Heat, Refrig, Cooling, or
Absorption Unit
____Boilers (includes vent)
____Air Handling Unit
____Cooling Systems
____Ventilation Fans
____Range Hood
____# of Gas System Outlets
____Snowmelt System Sq Ft_________
Equipment Checklist
Zoning
HPC
Building
Fire
Engineering
CMP
Utilities
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
ReviewRequired Date ApprovedReviewingDepartmentReviewerInitials
Call Assessor (970-920-5160) to verify
NEW SQ FT
Details Term Definitions
Project Valuation: Cost of project as defined in Valuation Affadavit.
Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.
Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.
Lot Size: Total surveyed square footage of property.
Sq Ft of Landscape Work: Square footage of disturbed exterior area.
New Sq Ft: Total added square footage for additions to net livable or net leasble space.
Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
August 2017
0224.2017.ARBK
975 Chatfield Road 2735 0240 2001
7 West Aspen Subdivision
Remodel of interior spaces. New Kitchen bathroom cabinets/countertops Reuse Appliances.
New flooring/carpet/tile. Remove some walls. Add 3 new windows. Replace existing windows same size
John Walker 970-379-7598 JWalk22401@aol.com
KRB Real Estate Assoc LLC 215-351-1500 Barry Bernsten <BBRRI@aol.com>
1.5 million
61
n 8
n
n 411
0
4876
5294 (fire area)
16827 110
0
594.38
0
1
2
2
0
2
204
3274104
0
x JP 12/19
18866.25 29025 x NT 1/12/18
4353.75 NT 1/12/18
487.50
x
x TK 9/26
2441.74
504.81 487.50
2441.74 14700
3750
DR 12/19x
DM 1/1
434
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
City
Mailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
IE^WCdIKE^͗ dŚe 'eneral ContraĐtor ŵust sĐŚeĚule insƉeĐtions online͘
Wlease visit ǁǁǁ͘asƉenƉitŬin͘ĐoŵͬeƉartŵentsͬCoŵŵunity-eveloƉŵent-&orŵsͬ to Ěo so͘
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
975 Chatfield Rd Aspen
Soraya Gallego Matter Interiors 847-712-0888 soraya@matterinteriors.com
John Walker 970-379-7598 JWalk22401@aol.comS
KRB Real Estate Assoc LLC 215-351-1500 215-917-1700
309 C S 2ND St Philadelphia PA 19106
Barry Bernsten <BBRRI@aol.com>
Barru Bernsten 215-351-1500 215-917-1700
309 C S 2ND ST Philadelphia PA 19106
Barry Bernsten <BBRRI@aol.com>
John Walker 970-379-7598 970-379-7598
PO BOX 10255 Aspen CO 81612
JWalk22401@aol.com
Matter Interiors 970-379-5401 970-379-5401
PO BOX 1045 Aspen CO 81612
noelle@matterinteriors.com
N/A
Albright Associates 970-927-4363 (970) 379-3244
402 Park Ave Unit A Basalt Co 81621
jack@albright-associates.com
John Walker Builder 970-379-7598 970-379-7598
PO BOX 10255 Aspen CO 81612
JWalk22401@aol.com
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
If you check any of the boxes below, please consult with the Planner of the Day (plannerofthedayΛgmail.com) before submiƫng your
permit application.
Does your permit involve any of the following?
LAND USE QUESTIONS
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
Part of an approved COA Land Use Review
Work affects net leasable, net livable, or
non-unit space
Work involves lot spliƫng or combining a lot
Work involves exterior of structure
Changing the number of residential units
Changes to number or location of
onsite parking
Work involves Landmark Parcel or Historic District
Located in 100-year Ňood plain or within 100͛ of high
water mark
Work involves changes in occupancy to structure
Changes to elevator or stair configuration
Changes to the use of existing structure or space
Does your permit involve any of the following?
ADDITIONAL SCOPE OF WORK QUESTIONS
Exterior lighting added or changed
Work involves roof penetrations
Work adds, removes, or changes
plumbing fixtures
Disturbs 1,000 sq ft or more of soil within
1Ϯ months
Work occurs in public right of way
Work affects trees or occurs within the
dripline of a tree
Work involves exterior wall penetrations
Work involves digging or excavation
Work involves restaurant or food service
Affects parking spaces/meters, loading zones, or alleys
Adding structures or systems over utility lines
Work within City Mall boundaries
August 2017
975 Chatfield Rd Aspen
n
n
n
n
n
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 1ϯ0 S. GALENA ST ͮ ASPEN, CO 81ϲ11
BUILDING CODE INFORMATION
Ϯ01ϱ IRC
Existing?NFPA 1ϯ NFPA 1ϯ R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# ϯ/ϰ Baths ______ # 1/Ϯ Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 1ϯ D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviwed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
Ϯnd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
ϯrd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport Is there an ADU?
# Living Rooms_____
# Kitchens _____
# Full Baths _____
# ϯ/ϰ Baths _____
# 1/Ϯ Baths _____
# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
Yes
No
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
__________________________
__________________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing н New)
A__B
B (A фϱ0)
F__
H__
I __
E R__
S__
U
M
I
R
C
I
B
C
Ϯ01ϱ IBC
(As Adopted and Amended)
Yes
No Required?Yes
No Type
August 2017
975 Chatfield Rd Aspen
n
n nn
n n
n n n
n
0 0 0
n
3 1
2 0 n
4 1 3
3 1
1 0
1 1
2 Floors Down from Main Level- l -Mechanical room. 3/4 bathroom.
TV Room. Closet
Kitchen. Breakfast Room, Living Room, Dining Room, Powder Room, Guest Bedroom
Guest Bath, Master Bathroom, Master Bedroom, Master Closet (2)
Lower Level 1 Floor down from Main- Sitting Room, Laundry Rm, Small Mechanical
Bedroom, Bathroom
Entry Level Floor- -Guest Coat Closet, Entry Hall
Garage, Guest Bedroom, Guest Bathroom
Note House is on a hill. Not one of these levels is below grade.
They are all on grade as they go down the hill.
NT 1/12/18
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or Authorized Agent representing the property owner. The following certification shall accompany the
application for a permit.
___________________________________ _________ ___________________________
I, the property owner, certify as follows: (pick one)
This property is not subject to a homeowner͛s association or other form of private covenant.
This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of
private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature ____________________________ Date _________________
Owner Printed Name ________________________
OR
Authorized Agent Signature ___________________________ Date _________________
Authorized Agent Printed Name _______________________
ADDRESS UNIT #PARCEL ID #
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
975 Chatfield Rd Aspen 273502402001
xx
KRB Real Estate Assoc LLC
Barry Bernsten
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. ϰ0, Series of Ϯ01ϲ adopts the Ϯ01ϱ International Residential Code (IRC) and
International Building Code (IBC) with certain amendments. These codes define building valuation as follows:
Z10ϴ͘ϯ uilĚing Ɖerŵit valuations͘ Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109͘ϯ uilĚing Ɖerŵit valuations͘ The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
tŚe oƉinion of tŚe ďuilĚing oĸĐial͕ tŚe valuation is unĚerestiŵateĚ on tŚe aƉƉliĐation͕ tŚe Ɖerŵit sŚall ďe
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City ƉoliĐy inĚiĐates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, Ňoor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
AFFIDAVIT POLICY
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: _________________________ Date:___________
Owner Printed Name: _________________________
or,
Authorized Agent Signature: _________________________ Date:___________
Authorized Agent Printed Name: _________________________
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
KRB Real Estate Assoc LLC
Barry Bernsten
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
Asbestos is a known human carcinogen and is an airborne hazard. Once airborne, asbestos fibers can stay suspended in the air for days,
weeks, or even months before settling out of the air. The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future, long after the renovation activity occurred. The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989 “ban” on asbestos-containing materials is commonly misunderstood. In fact, in 1ϵϵ1 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called ͞Asbestos Ban and Phaseout Rule͟ and remanded it to the EPA. Thus, much of the original 1ϵ8ϵ EPA ban
on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was
set aside and DID NOT TAKE EFFECT. Therefore, ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS INFORMATION
Yes No
Residential: Will you be removing more than ϯϮ sq ft, ϱ0 linear feet (e.g., pipe insulation), or the volume
equivalent of a ϱϱ-gallon drum of any material besides concrete, wood, bricks, or steel ʹ examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
Yes No
Commercial: Will you be removing more than 1ϲ0 sq ft, Ϯϲ0 linear feet (e.g., pipe insulation), or the volume
equivalent of a ϱϱ-gallon drum of any material besides concrete, wood, bricks, or steel ʹ examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/
or Ěeŵolition Ɖerŵit͘ zou ǁill also neeĚ to ƉroviĚe Ɖlans inĚiĐating areas to ďe ĚeŵolisŚeĚ anĚ Ěeterŵine if a
CK state Ěeŵolition liĐense is reƋuireĚ͘ A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Division
stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a
permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.co.us/ap/
asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current
state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
ASBESTOS CHECKLIST
I Śereďy Đertify tŚat tŚe aďove inforŵation is true anĚ ĐoŵƉlete͘
Owner______________________________ Phone #___________________________
Applicant (print name)_________________________________ Phone #___________________
Applicant Signature ___________________________________ Date ______________________
Please call the City of Aspen Environmental Health Department at ϵϮ0-ϱ0ϯϵ at any time if you have questions
about asbestos, interpreting your test results, or other matters.
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
n
KRB Real Estate Assoc LLC
Barry Bernsten 215-351-1500
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
Applicability: All development projects must comply with the City͛s zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City͛s Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City͛s Zoning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
Ϯ-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
ϯ-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary.
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
975 Chatfield Rd Aspen
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
ϰ-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
ϱ-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
ϲ-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
ϳ-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
I (contractor name) ______________________________ understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable zoning limitations.
Contractor Signature: ___________________________________________
Date: ________________________________________________________
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
975 Chatfield Rd Aspen 81611
John Walker