HomeMy WebLinkAboutMaster Permit.975 Chatfield Rd.0224.2017 (5).ARBKPERMIT NUMBER:
ADDRESS:
COMMUNITY DEVELOPMENT DEPARTMENT I�
VALUATION AFFADAVIT
AFFIDAVIT POLICY
All applications for a building permit within the City at Aspen are required to include a certification 01
compliance with building permit valuation regwremems. The certification must be signed by the property
owner or authorized representative. The following certification snan accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 1016 adopts the 7015 Intemahonal Residential Code (IRC) and
International Budding Code (IBC) with certain amendments. These codes define budding valuation as follows:
R105.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment. and other permanent systems,
including materials and labor.
109.3 Building permit valuations, t he applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall Include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas. mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official, the valuation is underestimated on the application, the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the stnlcture and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and MVAC controls are included in the total as are expenses directly related to construction
swh as equipment rental and contractor fees. Finish matenals such as paint, Floor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation feces, trash removal, and cleaning are not mckwed.
I Cernty that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: Date:yq/�tA1%
Owner Printed Name: KRB I Estate Assoc LLC
or,
Authonzed Agent Signature: >-4::011 Date.
Authorized Agent Printed Name: Barry Bemsten
!'ITY (1F ACDFhI. 1'x(1 C a A I Phi CT 1 ACDFAI rn 5711