ZONING COMPLIANCE VERIFICATION POLICY
ADDRESS; 975 Chatheld Rd Aspen 81611
4 -Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5 -The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
&All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7 -The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
I (contractor name) John Walker understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. l understand that a Certificate of Occupancy will not be issued until this
project complies with all apgfrgablgzoning limd4pns.