Loading...
HomeMy WebLinkAboutFile Documents.975 Chatfield Rd.0224.2017 (62).ARBKPERMIT MUNITY D PMENT DEPARTM ZONING COMPLIANCE VERIFICATION POLICY ADDRESS; 975 Chatheld Rd Aspen 81611 4 -Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5 -The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. &All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7 -The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) John Walker understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. l understand that a Certificate of Occupancy will not be issued until this project complies with all apgfrgablgzoning limd4pns. Contractor Signature: t ///1///la Date: Y—Ut —// r'ITv rll= ACDGN.__.,_ — 12f1 C C:AI LrIA CT I ACPLKI fY1 R1K11