Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.971 Ute Ave.0247.2017 (2).ARBK
6/29/2014 Page 1 of 2 ASPEN BUILDING PERMIT APPLICATION CHECKLIST IRC: Single Family, Duplex & Townhome For Building and Permit Information, please refer to our website at: www.aspenpitkin.com JOB ADDRESS___________________________________ PARCEL I.D. NUMBER________________ OWNER__________________________________________________________ DATE_____________ The following are requirements for various types of projects. Permits must include ALL of the items on this checklist or they will not be accepted. Incomplete permits will be turned away. Refer to the Single Family & Duplex Building Submittal Guide and guides from other referral departments for clarifications and descriptions on each item. □ Be prepared to pay submittal fees at permit submittal. Contact a permit coordinator for a fee estimate. □ Submit a flash drive or disc with a copy of all documents and drawings in pdf format. 8 ½” x 11” Documents (see submittal guide for number of copies) Submittal Requirements New Construction Addition Alteration/ Remodel Interior only Alteration Demo partial or complete Repair Planning Approvals √ □ √ □ √ □ √ □ √ □ √ □ Permit Application Form & Contact Sheet √ □ √ □ √ □ √ □ √ □ √ □ Valuation Adjustment Affidavit & Construction Bid √ □ √ □ √ □ √ □ HOA Certification √ □ √ □ √ □ √ □ √ □ √ □ IRC Building Description Form √ □ √ □ √ □ √ □ √ □ Asbestos Questionnaire √ □ √ □ √ □ √ □ √ □ Asbestos test and clearance reports √ □ √ □ √ □ √ □ √ □ State Asbestos Demolition Approval Notice √ □ Fireplace Registration Form & Manufacturer’s installation instructions √ □ √ □ √ □ √ □ Energy Code Compliance √ □ √ □ √ □ √ □ Non-Vented Roof Assembly Calcs √ □ √ □ √ □ √ □ U-Factor Fenestration Docs √ □ √ □ √ □ PERMIT#:___________________ 971 UTE AVENUE 2273718295029 MERRILL A. CHOZEN 04/02/2017 N/A N/A N/A City of Aspen Received 5/11/17 Building Department 6/29/2014 Page 2 of 2 Submittal Requirements New Construction Addition Alteration/ Remodel Interior only Alteration Demo partial or complete Repair RREMP documents √ □ √ □ √ □ Line Grade Verification Form √ □ √ □ Verification of Structural Integrity √ □ √ □ √ □ √ □ Soils Report √ □ √ □ Smuggler Superfund Soil Removal Permit √ □ √ □ √ □ Signed Special Inspection and Testing Agreement √ □ √ □ √ □ √ □ √ □ Mechanical Docs √ □ √ □ √ □ √ □ Photos √ □ √ □ √ □ √ □ Unit/Building relationship √ □ √ □ √ □ √ □ √ □ 24”x36” (2 COPIES) & 11”x17” (1 COPY) Plans Sheets must be in the following order. Existing plans required for all additions & alterations Submittal Requirements New Construction Addition Alteration/ Remodel Interior only Alteration Demo partial or complete Repair Cover Sheet √ □ √ □ √ □ √ □ Survey √ □ √ □ √ □ Excavation/ Earth Retention Plans √ □ √ □ Site Plan √ □ √ □ √ □ √ □ √ □ RREMP Plan √ □ √ □ √ □ √ □ Area Sheet √ □ √ □ √ □ √ □ Floor Plans √ □ √ □ √ □ √ □ √ □ √ □ Roof Plan √ □ √ □ √ □ Elevations √ □ √ □ √ □ √ □ Sections √ □ √ □ √ □ √ □ Details √ □ √ □ √ □ √ □ √ □ Fireplace Details √ □ √ □ √ □ √ □ Schedules √ □ √ □ √ □ √ □ Reflected Ceiling Plans √ □ √ □ √ □ √ □ Lighting Plans √ □ √ □ √ □ √ □ Mechanical Plans √ □ Structural Plans √ □ √ □ √ □ √ □ √ □ Radon Plan √ □ √ □ N/A N/A N/A N/A City of Aspen Received 5/11/17 Building Department