HomeMy WebLinkAboutFile Documents.971 Ute Ave.0247.2017 (17).ARBK2. Approval of fabricator. Approval shall be based upon review of the fabricator's written
procedme and quality control manuals and periodic auditing of fabrication practices by
an approved special inspection agency.
3. Completion of fabrication. Upon completion of fabricefion, the approved fabricator
shalt submit artifices ofcomplianoe to the building official seating that the work was
performed in accordance with the approved earear ctioo documents.
G. Building Deparrou nt Responsibilities
1. Approve speciaFinepaction program. The building dePazlment shall approve all
special inspectors and special -inspection requirements.
2. Enforce special inspection. Work meaning special inspection and the building
Mpectar shall monimr the performance of special inspectors. HislHec approval, in
addition to that of the special inspector, must be obtained prior to placement of concrete,
covering of mucture steel, or other similar materials.
3. Review inspection reports. The building official should review special -inspection
progress and final reports.
4. Perform final inspection. The building official should Perform the final inspection and
approval for a project [IBC Sec. 109.3.11 after the final special -inspection report has been
reviewed and approved
Permit Number.
ACKNOWLEDGMENTS
I have read and agree to comply with the conditions of this agreement
I
/ /
Sp is[ echo m `Igoatwe. eine: Dale: r a� �l
Owner: ignature: ams Date
Engineer/Architect: Signature: Printed Name: Dole:
Contmcmr: Signature: Printed N. Data:
Brian Well EEZ
Approved Fabricator. Signature: Printed Name: Data:
Inspected Fabricemr. e: —��
5f AS
(circle ane) d ` Prmtedblama: Dee -
HN
PITKIN COUNTY: