HomeMy WebLinkAboutFile Documents.950 Cemetery Ln.0152.2019.ARBK0152-2019-arbk_building comments_1
Subject: PlanCheck
Page Label: 1
Page Index: 1
Author: tonyf
Date: 7/24/2019 3:07:44 PM
File Name: Change Order Narrative.pdf
Please clarify
Change Order Narrative.pdf (2)
Subject: PlanCheck
Page Label: 1
Page Index: 1
Author: tonyf
Date: 7/24/2019 2:58:44 PM
File Name: Change Order Narrative.pdf
Please clarify status of entry
roof: is it being extended? If so,
what structurals will be used?
Subject: PlanCheck
Page Label: A 4.0 SECTIONS -PROPOSED
Page Index: 8
Author: tonyf
Date: 7/24/2019 9:09:15 AM
File Name: Costanza Submittal Set 061219.pdf
Provide structurals showing how
this space will be enclosed
Costanza Submittal Set 061219.pdf (3)
Subject: PlanCheck
Page Label: A3.2 Southeast Elevation
Page Index: 5
Author: tonyf
Date: 7/24/2019 2:25:48 PM
File Name: Costanza Submittal Set 061219.pdf
Please clarify the status of the
flat roof over entry: has it been
eliminated, as per roof plan, or is
it to be built, in which case it
needs structural plans and must
be shown on the plan view
sheets.
Subject: PlanCheck
Page Label: A3.3 Northeast Elevation (rear)
Page Index: 6
Author: tonyf
Date: 7/24/2019 3:13:15 PM
File Name: Costanza Submittal Set 061219.pdf
Please clarify: where and how is
deck expanded?
Sheet A 3.2 Exterior Elevations Proposed A New enclosed Water Tank/Storage room with insulated door (Max U-value .28)
B Existing Entry roof to remain. Disregard original proposed design. Extend entry roof over garage
roof as shown. New cement board rainscreen paneling at garage and entry. C Same. Existing Entry roof to remain. Also existing chimney to remain. New cement board rainscreen paneling at garage, entry and chimney.
D Elimination and change in windows on this wall.
E New rainscreen system detail. Sheet A 3.3 Exterior Elevations Proposed
A Existing Entry roofs to remain. Disregard original proposed design. New cement board rainscreen paneling added to garage, entry and chimney. B Elevation of this area revised to indicate existing roof to be tied into.
C Proposed entry roof removed. Existing chimney to be clad with rainscreen.
D New enclosed Water Tank/Storage room.
Please clarify
will be added. Two-4’ electric heaters will be installed in the space. Also within this cloud we have indicated the window well that serves the egress windows from Bedroom 1. B The Shower and Closet of Bath 2 have been rearranged. C The existing bathtub remains in Bath 2 Sheet A 1.4 Main Level Plan A The existing wood burning fireplace will be replaced with a Majestic two-sided gas appliance. See attached Fireplace Registration Form and cut sheets. B Window removed from shower C Windows removed along this wall Sheet A 1.7 Roof Plan A Roof over existing roofs reconfigured to simplify design and reduce cost. Sheet A 3.2 Exterior Elevations Proposed A New enclosed Water Tank/Storage room with insulated door (Max U-value .28) B Existing Entry roof to remain. Disregard original proposed design. Extend entry roof over garage roof as shown. New cement board rainscreen paneling at garage and entry.
C Same. Existing Entry roof to remain. Also existing chimney to remain. New cement board rainscreen paneling at garage, entry and chimney.
D Elimination and change in windows on this wall. E New rainscreen system detail.
Sheet A 3.3 Exterior Elevations Proposed
A Existing Entry roofs to remain. Disregard original proposed design. New cement board rainscreen paneling added to garage, entry and chimney. B Elevation of this area revised to indicate existing roof to be tied into. C Proposed entry roof removed. Existing chimney to be clad with rainscreen.
D New enclosed Water Tank/Storage room.
Please clarify status of entry roof: is it
being extended? If so, what structurals
will be used?5'-6"LIVING KITCHEN
WATER TANK/STORAGE
BEDROOM 2OMCLOS 2
BA4.0
Provide structurals
showing how this
space will be enclosed
1 2 3 4
22'-4 1/4"7'-9 1/2"15'-5"
EXISTING CHIMNEY TOREMAIN. WRAP INCEMENT BOARD RAINSCREEN
REMOVE VENEER FROM CARPORT, ADDCEMENT BOARD RAINSCREEN
W22
NEW DOOR TO GARAGE, U-VALUE 0.27
DG1
EXISTING ANDPROPOSED GRADE
NEW FLAT ROOFEXTENSION OVER ENTRYAND STAIRALIGN PANELS WITH WINDOW HEADERAND ENTRY DOOR.
UNIT 2 SHOWN FOR REFERENCE
7,379'-3 1/4' = ARCH 114'-2 1/8"
ENTRY LEVEL7,860.22' = ARCH 95'-1 1/2"
MAIN LEVEL7,865'- 1 1/8" = ARCH 100'-0
LOWER LEVEL7,856'-1 1/8' = ARCH 91'-0"
T.O.WALL7,879'-3 1/4' = ARCH 114'-2 1/8"
7,854'-9" = ARCH 89'-8"PROPOSED NEW LOWER SLAB
CA3.2
1
SCALE: 1/4" = 1'-0"2 SOUTHEAST ELEVATION
Please clarify the status of the flat roofover entry: has it been eliminated, as perroof plan, or is it to be built, in which caseit needs structural plans and must beshown on the plan view sheets.
EXISTING DECK TOREMAIN; EXPANDEDDECK TO BE BUILTWITHIN SETBACK
NEW DOORS ANDWINDOWS, TYP.
NEW BEAM, SEE STRUCT.
W24
W29W29
EXISTING DECK TOREMAIN; EXPANDEDDECK TO BE BUILTWITHIN SETBACK
CO 1
Please clarify: where
and how is deck
expanded?