Loading...
HomeMy WebLinkAboutFile Documents.950 Cemetery Ln.0152.2019.ARBK0152-2019-arbk_building comments_1 Subject: PlanCheck Page Label: 1 Page Index: 1 Author: tonyf Date: 7/24/2019 3:07:44 PM File Name: Change Order Narrative.pdf Please clarify Change Order Narrative.pdf (2) Subject: PlanCheck Page Label: 1 Page Index: 1 Author: tonyf Date: 7/24/2019 2:58:44 PM File Name: Change Order Narrative.pdf Please clarify status of entry roof: is it being extended? If so, what structurals will be used? Subject: PlanCheck Page Label: A 4.0 SECTIONS -PROPOSED Page Index: 8 Author: tonyf Date: 7/24/2019 9:09:15 AM File Name: Costanza Submittal Set 061219.pdf Provide structurals showing how this space will be enclosed Costanza Submittal Set 061219.pdf (3) Subject: PlanCheck Page Label: A3.2 Southeast Elevation Page Index: 5 Author: tonyf Date: 7/24/2019 2:25:48 PM File Name: Costanza Submittal Set 061219.pdf Please clarify the status of the flat roof over entry: has it been eliminated, as per roof plan, or is it to be built, in which case it needs structural plans and must be shown on the plan view sheets. Subject: PlanCheck Page Label: A3.3 Northeast Elevation (rear) Page Index: 6 Author: tonyf Date: 7/24/2019 3:13:15 PM File Name: Costanza Submittal Set 061219.pdf Please clarify: where and how is deck expanded? Sheet A 3.2 Exterior Elevations Proposed A New enclosed Water Tank/Storage room with insulated door (Max U-value .28) B Existing Entry roof to remain. Disregard original proposed design. Extend entry roof over garage roof as shown. New cement board rainscreen paneling at garage and entry. C Same. Existing Entry roof to remain. Also existing chimney to remain. New cement board rainscreen paneling at garage, entry and chimney. D Elimination and change in windows on this wall. E New rainscreen system detail. Sheet A 3.3 Exterior Elevations Proposed A Existing Entry roofs to remain. Disregard original proposed design. New cement board rainscreen paneling added to garage, entry and chimney. B Elevation of this area revised to indicate existing roof to be tied into. C Proposed entry roof removed. Existing chimney to be clad with rainscreen. D New enclosed Water Tank/Storage room. Please clarify will be added. Two-4’ electric heaters will be installed in the space. Also within this cloud we have indicated the window well that serves the egress windows from Bedroom 1. B The Shower and Closet of Bath 2 have been rearranged. C The existing bathtub remains in Bath 2 Sheet A 1.4 Main Level Plan A The existing wood burning fireplace will be replaced with a Majestic two-sided gas appliance. See attached Fireplace Registration Form and cut sheets. B Window removed from shower C Windows removed along this wall Sheet A 1.7 Roof Plan A Roof over existing roofs reconfigured to simplify design and reduce cost. Sheet A 3.2 Exterior Elevations Proposed A New enclosed Water Tank/Storage room with insulated door (Max U-value .28) B Existing Entry roof to remain. Disregard original proposed design. Extend entry roof over garage roof as shown. New cement board rainscreen paneling at garage and entry. C Same. Existing Entry roof to remain. Also existing chimney to remain. New cement board rainscreen paneling at garage, entry and chimney. D Elimination and change in windows on this wall. E New rainscreen system detail. Sheet A 3.3 Exterior Elevations Proposed A Existing Entry roofs to remain. Disregard original proposed design. New cement board rainscreen paneling added to garage, entry and chimney. B Elevation of this area revised to indicate existing roof to be tied into. C Proposed entry roof removed. Existing chimney to be clad with rainscreen. D New enclosed Water Tank/Storage room. Please clarify status of entry roof: is it being extended? If so, what structurals will be used?5'-6"LIVING KITCHEN WATER TANK/STORAGE BEDROOM 2OMCLOS 2 BA4.0 Provide structurals showing how this space will be enclosed 1 2 3 4 22'-4 1/4"7'-9 1/2"15'-5" EXISTING CHIMNEY TOREMAIN. WRAP INCEMENT BOARD RAINSCREEN REMOVE VENEER FROM CARPORT, ADDCEMENT BOARD RAINSCREEN W22 NEW DOOR TO GARAGE, U-VALUE 0.27 DG1 EXISTING ANDPROPOSED GRADE NEW FLAT ROOFEXTENSION OVER ENTRYAND STAIRALIGN PANELS WITH WINDOW HEADERAND ENTRY DOOR. UNIT 2 SHOWN FOR REFERENCE 7,379'-3 1/4' = ARCH 114'-2 1/8" ENTRY LEVEL7,860.22' = ARCH 95'-1 1/2" MAIN LEVEL7,865'- 1 1/8" = ARCH 100'-0 LOWER LEVEL7,856'-1 1/8' = ARCH 91'-0" T.O.WALL7,879'-3 1/4' = ARCH 114'-2 1/8" 7,854'-9" = ARCH 89'-8"PROPOSED NEW LOWER SLAB CA3.2 1 SCALE: 1/4" = 1'-0"2 SOUTHEAST ELEVATION Please clarify the status of the flat roofover entry: has it been eliminated, as perroof plan, or is it to be built, in which caseit needs structural plans and must beshown on the plan view sheets. EXISTING DECK TOREMAIN; EXPANDEDDECK TO BE BUILTWITHIN SETBACK NEW DOORS ANDWINDOWS, TYP. NEW BEAM, SEE STRUCT. W24 W29W29 EXISTING DECK TOREMAIN; EXPANDEDDECK TO BE BUILTWITHIN SETBACK CO 1 Please clarify: where and how is deck expanded?