Loading...
HomeMy WebLinkAboutFile Documents.950 Cemetery Ln.0152.2019 (3).ARBK KIM RAYMOND ARCHITECTS AND INTERIORS 418 East Cooper Ave., Ste 201, Aspen, CO 81611 (970) 925-2252 Aspen Building Department 130 South Galena Street Aspen, CO 81611 June 5, 2019 RE: Change Order to 950 Cemetery Lane (Permit # 0072.2018.ARBK) Dear Plan Checker, This letter serves as a narrative to the various changes we are making to the above referenced permit to 950 Cemetery Lane. The descriptions are organized by the sheets submitted and the clouded changes on each sheet for your reference. Sheet A 1.3 Lower Level Plan A The area below the Kitchen has been closed in to allow for a water tank for the sprinkler system. A concrete slab will be poured less than 5’-6” below the kitchen floor joists so no additional FAR will be added. Two-4’ electric heaters will be installed in the space. Also within this cloud we have indicated the window well that serves the egress windows from Bedroom 1. B The Shower and Closet of Bath 2 have been rearranged. C The existing bathtub remains in Bath 2 Sheet A 1.4 Main Level Plan A The existing wood burning fireplace will be replaced with a Majestic two-sided gas appliance. See attached Fireplace Registration Form and cut sheets. B Window removed from shower C Windows removed along this wall Sheet A 1.7 Roof Plan A Roof over existing roofs reconfigured to simplify design and reduce cost. Sheet A 3.2 Exterior Elevations Proposed A New enclosed Water Tank/Storage room with insulated door (Max U-value .28) B Existing Entry roof to remain. Disregard original proposed design. Extend entry roof over garage roof as shown. New cement board rainscreen paneling at garage and entry. C Same. Existing Entry roof to remain. Also existing chimney to remain. New cement board rainscreen paneling at garage, entry and chimney. D Elimination and change in windows on this wall. E New rainscreen system detail. Sheet A 3.3 Exterior Elevations Proposed A Existing Entry roofs to remain. Disregard original proposed design. New cement board rainscreen paneling added to garage, entry and chimney. B Elevation of this area revised to indicate existing roof to be tied into. C Proposed entry roof removed. Existing chimney to be clad with rainscreen. D New enclosed Water Tank/Storage room. 06/20/2019 Sheet A 3.4 Exterior Elevations Proposed Hidden A Clarification in notations regarding hot tub. B Existing Entry roof to remain. Also existing chimney to remain. C Elimination and change in windows on this wall. D The Shower and Closet of Bath 2 have been rearranged. E The existing wood burning fireplace will be replaced with a Majestic two-sided gas appliance. See attached Fireplace Registration Form and cut sheets. Also new cement board panel rainscreen below entry roof and chimney. F The Shower and Closet of Bath 2 have been rearranged. Sheet A 4.0 Sections Proposed A Chimney to remain B New Water Tank/Storage room. If there are any questions with these revisions please don’t hesitate to call for clarification. Respectfully, Charlie Eckart 06/20/2019