Loading...
HomeMy WebLinkAboutFile Documents.ASPEN MOUNTAIN RD.0023.2018 (4).ACBK06/04/2018 denismJSK • Comment No. 4, Lighting: Very limited lighting, very limited occupancy. The fixtures (2 each) are a LED T8 vapor tight fixture manufactured by MaxLite. The time & cost of further analysis does not seem necessary. • Comment No. 5, Ceiling Material: Ceiling material is FRP, just like the interior wall finish. We can certainly make sure that note is added to a Construction Set. • Comment No. 6, Air Blower Test: The pump manufacture requires a 2515 CFM outlet exhaust fan with a corresponding inlet damper on the opposite side of the space, these two openings are power -to -open, spring -to -close. Given this functional requirement, and the low heat requirement, we are not sure of the viability (or pass -ability) of a blower test as this will be an enormous weak point in the overall building envelope. Note 26 of the Project Notes describes caulking procedures. Thank you for your agention and consideration. Best Seth Hmielowski Principal Z -Group Architects, PC ■s ■N Z -Group Architects. P.C. • 41 1 East Main Street. Aspen, CO. 8161 1 • Telephone: 970-925-1832 • Fax: 970-925-1371