HomeMy WebLinkAboutFile Documents.ASPEN MOUNTAIN RD.0023.2018 (4).ACBK06/04/2018
denismJSK
• Comment No. 4, Lighting: Very limited lighting, very limited occupancy. The fixtures (2 each) are
a LED T8 vapor tight fixture manufactured by MaxLite. The time & cost of further analysis does
not seem necessary.
• Comment No. 5, Ceiling Material: Ceiling material is FRP, just like the interior wall finish. We can
certainly make sure that note is added to a Construction Set.
• Comment No. 6, Air Blower Test: The pump manufacture requires a 2515 CFM outlet exhaust
fan with a corresponding inlet damper on the opposite side of the space, these two openings
are power -to -open, spring -to -close. Given this functional requirement, and the low heat
requirement, we are not sure of the viability (or pass -ability) of a blower test as this will be an
enormous weak point in the overall building envelope. Note 26 of the Project Notes describes
caulking procedures.
Thank you for your agention and consideration.
Best
Seth Hmielowski
Principal
Z -Group Architects, PC
■s
■N Z -Group Architects. P.C. • 41 1 East Main Street. Aspen, CO. 8161 1 • Telephone: 970-925-1832 • Fax: 970-925-1371