Subject: PlanCheck
Page: 8
File Name: 2017-02-01 Structural.pdf
Verify that this area has been
structurally designed to support
the proposed hot tub.
2017-02-01 Structural.pdf (1)
Subject: PlanCheck
Page: 4
File Name: Plans.pdf
Two REMP worksheets were
submitted, one calling out 121
SF of new snowmelt, and
another that shows 145 SF of
additional snowmelt. Please
clarify and identify which REMP
worksheet is correct. Sheet
A002 shows the deck addition
as 145 SF, please clarify what
the correct amount is and make
sure it is consistantly shown
throughout the plan set.
Plans.pdf (7)
Subject: PlanCheck
Page: 10
File Name: Plans.pdf
Please note the max 15lbs
opening force requirement (COA
sec 8.16.020aa) on your plans.
Subject: PlanCheck
Page: 11
File Name: Plans.pdf
Provide sizing information on the
scupper, IRC 903.4.1 requires it
to be sized at 3 times the size of
the roof drain and have a
minimum opening dimension of
4 inches. Call out elevation of
scupper's flow line to ensure it is
below the floor level at the
sliding doors.
Subject: PlanCheck
Page: 11
File Name: Plans.pdf
Provide a cutsheet on the fire
table that shows it is approved to
be placed on a combustible
support.
Verify that this area
has been structurally
designed to support
the proposed hot tub.
Two REMP worksheets were submitted, onecalling out 121 SF of new snowmelt, and another
that shows 145 SF of additional snowmelt.
Please clarify and identify which REMP
worksheet is correct. Sheet A002 shows the
deck addition as 145 SF, please clarify what the
correct amount is and make sure it is
consistantly shown throughout the plan set.
Please note the max
15lbs opening force
requirement (COA sec
8.16.020aa) on your
plans.
Provide sizing information on the
scupper, IRC 903.4.1 requires it to
be sized at 3 times the size of the
roof drain and have a minimum
opening dimension of 4 inches.
Call out elevation of scupper's
flow line to ensure it is below the
floor level at the sliding doors.
Provide a cutsheet on the fire table
that shows it is approved to be
placed on a combustible support.
The structural engineer has provided a note, on sheet
S2.7, confirming that the area where the Hot tub is to
be located is designed to support the that Hot Tub.
The Hot Tub specifications are also attached.
The REMP worksheet with 121 SF is the correct one.
Sheet A002 has been corrected and is consistent with
the rest of the drawings.
Sheet A105 has been noted.
The Fire Table has been deleted on sht. A106. It is not
part of the construction of the project.
Sizing information, per IRC 903.4.1, has been
provided on sht. A302 & details 3 &4 on sht. A403.
Scupper elevation is noted and is below floor level at
sliding doors.
Subject: PlanCheck
Page: 11
File Name: Plans.pdf
What type of fireplace is this
(wood burning, gas log, or gas
appliance)? If it is a gas log or
wood burning fireplace please
provide a detail on the new
proposed changes to the hearth
that comply with IRC 1001.9 &
1001.10. From this plan it
doesn't appear that your hearth
meets the requirements if it is a
wood burning fireplace or gas
log set. Provide the fireplace
opening size as this will
determine the size of the hearth
extension. If it is a direct vent
appliance provide the installation
manual and a detail showing that
all required clearances from
combustibles is being
maintained.
Subject: PlanCheck
Page: 11
File Name: Plans.pdf
Where was this hot tub existing
previously? I don't see in on any
existing plans or the site plan.
Provide a spec on this spa that
shows it meets the exemptions
from REMP (must be self
contained, 64 sf or less and be
certified by the CEC or
APSP-14) and a cutsheet on a
cover that complies with ASTM
F 1346 and has a min R12
insulation value. Per City policy
the guard along the hot tub must
either extend 18" above the
height of the spa edge or have a
horizontal distance of 18"
between the guard and the hot
tub. Provide an elevation or
detail that shows compliance
with this.
Subject: PlanCheck
Page: 19
File Name: Plans.pdf
Demonstrate compliant roof
ventilation per IRC 806.
Subject: PlanCheck
Page: 3
File Name: Special Inspection & Testing Agreement -
Signed.pdf
Provided a signature from either
an approved fabricator or the
inspected fabricator.
Special Inspection & Testing Agreement - Signed.pdf (1)
What type of fireplace is this (wood
burning, gas log, or gas
appliance)? If it is a gas log or
wood burning fireplace please
provide a detail on the new
proposed changes to the hearth
that comply with IRC 1001.9 &
1001.10. From this plan it doesn't
appear that your hearth meets the
requirements if it is a wood burning
fireplace or gas log set. Provide
the fireplace opening size as thiswill determine the size of the hearthextension. If it is a direct vent
appliance provide the installation
manual and a detail showing that
all required clearances from
combustibles is being maintained.
Where was this hot tub existing previously? I don't
see in on any existing plans or the site plan.
Provide a spec on this spa that shows it meets the
exemptions from REMP (must be self contained,
64 sf or less and be certified by the CEC or
APSP-14) and a cutsheet on a cover that complies
with ASTM F 1346 and has a min R12 insulation
value. Per City policy the guard along the hot tubmust either extend 18" above the height of the spa
edge or have a horizontal distance of 18" between
the guard and the hot tub. Provide an elevation ordetail that shows compliance with this.
Demonstratecompliant roofventilation per IRC806.
Provided a signature
from either an
approved fabricator or
the inspected
fabricator.
The existing fireplace is a Lennox Rhapsody 42N
gas appliance. The Specifications are attached and
highlighted; a hearth extension is not required;
minimum clearance to unprotected side wall has
been maintained per Figure 6 in the specifications.
The hot tub current location is now shown on the
existing & demo plan and the new proposed location,
18" from the parapet/guardrail, is shown on sht. A106.
The hot tub spec is attached and meets the
exemptions from REMP. The Owner's Manual for the
hot tub is attached with the statement, highlighted on
the second sheet and page 28, that the cover meets
the required ASTM standards.
Inspected Fabricator signature has been provided on
the Special Inspection & Testing Agreement attached.
Details 1/A403 & 8/A401 have been revised to be
insulated with spray foam having an R-49.