Provide a full floor plan for this
level to demonstrate that the
window wells are not required for
emergency escape egress and
can be removed. The existing
plans in your master permit
showed windows in these
locations so I need to verify that
the requirements of IRC section
310 are still being met.
Change Order #2 - 2017-09-18.pdf (4)
Subject: PlanCheck
Page Label: 6
Author: justinh
File Name: Change Order #2 - 2017-09-18.pdf
Remove all bubbling from the
master permit's response to
comments rounds on all
applicable sheets. Bubbling
should only be used for changes
specific to this change order.
Keeping previous bubbling on
your sheets makes it difficult to
tell what changes are actually
being proposed.
Changes/revisions made in
response to comments should
not be bubbled.
Subject: PlanCheck
Page Label: 6
Author: justinh
File Name: Change Order #2 - 2017-09-18.pdf
Revise this note to specify
scupper at 2" above finish floor
at roof drain, not minimum 2"
above finish floor. That
elevation is specific as to not
allow water to build up, the
scupper should not be installed
any higher than 2" above the low
point of the roof.
Subject: PlanCheck
Page Label: 12
Author: justinh
File Name: Change Order #2 - 2017-09-18.pdf
Was this meant to be new 3"
drain line as that is the size
referenced in the next note
below?
Provide a full floor plan for this level to demonstrate that the window
wells are not required for emergency escape egress and can be
removed. The existing plans in your master permit showed windows
in these locations so I need to verify that the requirements of IRC
section 310 are still being met.
Remove all bubbling from the master permit'sresponse to comments rounds on all applicable
sheets. Bubbling should only be used forchanges specific to this change order. Keepingprevious bubbling on your sheets makes itdifficult to tell what changes are actually being
proposed. Changes/revisions made in responseto comments should not be bubbled.
Revise this note to
specify scupper at 2"
above finish floor at
roof drain, not
minimum 2" above
finish floor. That
elevation is specific as
to not allow water to
build up, the scupper
should not be installed
any higher than 2"
above the low point of
the roof.
Was this meant to be
new 3" drain line as
that is the size
referenced in the next
note below?
Floor plans have been updated to show existing
conditions. The windows we are removing are not
required for egress. See plan A104
Bubbles have all been changed to Change Order #2.
Previous bubbles for building comments and Change
Order #1 have been deleted. Bubbles were included
for changes related to the current Change order #2
and comments only.
Note now reads 4"x6" roof scupper at new parapet
wall. 2" above F.F. at roof drain.
The vertical drain lines are 2" dia. based on the
manufacturer. They tie into a larger 3" dia.
horizontal line.