HomeMy WebLinkAboutFile Documents.222 Cleveland St.0292.2017.ARBKBuildingComment2 Subject: PlanCheck Page Label: 4 Author: justinh File Name: Change Order #2 - 2017-09-18.pdf Provide a full floor plan for this level to demonstrate that the window wells are not required for emergency escape egress and can be removed. The existing plans in your master permit showed windows in these locations so I need to verify that the requirements of IRC section 310 are still being met. Change Order #2 - 2017-09-18.pdf (4) Subject: PlanCheck Page Label: 6 Author: justinh File Name: Change Order #2 - 2017-09-18.pdf Remove all bubbling from the master permit's response to comments rounds on all applicable sheets. Bubbling should only be used for changes specific to this change order. Keeping previous bubbling on your sheets makes it difficult to tell what changes are actually being proposed. Changes/revisions made in response to comments should not be bubbled. Subject: PlanCheck Page Label: 6 Author: justinh File Name: Change Order #2 - 2017-09-18.pdf Revise this note to specify scupper at 2" above finish floor at roof drain, not minimum 2" above finish floor. That elevation is specific as to not allow water to build up, the scupper should not be installed any higher than 2" above the low point of the roof. Subject: PlanCheck Page Label: 12 Author: justinh File Name: Change Order #2 - 2017-09-18.pdf Was this meant to be new 3" drain line as that is the size referenced in the next note below? Provide a full floor plan for this level to demonstrate that the window wells are not required for emergency escape egress and can be removed. The existing plans in your master permit showed windows in these locations so I need to verify that the requirements of IRC section 310 are still being met. Remove all bubbling from the master permit'sresponse to comments rounds on all applicable sheets. Bubbling should only be used forchanges specific to this change order. Keepingprevious bubbling on your sheets makes itdifficult to tell what changes are actually being proposed. Changes/revisions made in responseto comments should not be bubbled. Revise this note to specify scupper at 2" above finish floor at roof drain, not minimum 2" above finish floor. That elevation is specific as to not allow water to build up, the scupper should not be installed any higher than 2" above the low point of the roof. Was this meant to be new 3" drain line as that is the size referenced in the next note below? Floor plans have been updated to show existing conditions. The windows we are removing are not required for egress. See plan A104 Bubbles have all been changed to Change Order #2. Previous bubbles for building comments and Change Order #1 have been deleted. Bubbles were included for changes related to the current Change order #2 and comments only. Note now reads 4"x6" roof scupper at new parapet wall. 2" above F.F. at roof drain. The vertical drain lines are 2" dia. based on the manufacturer. They tie into a larger 3" dia. horizontal line. 12/14/2017