This is a submission for a change order for 287 McSkimming Road
(Permit# 0073.2017.ARBK) Changes are clouded on the drawings and indicated with revision
symbol 1. Relevant drawing sheets to review are the following:
Z006 - Zoning Summary
Z007 - Floor Area Calculation: Basement Level
Z008 - Floor Area Calculation: Main Level & Upper Level
A100 - Basement Level Floor Plan
A101 - Main Level Floor Plan
S100 - Basement Level Floor Plan
S101 - Main Level Framing Plan
S102 - Upper Level Framing Plan & Roof Plan
S103 - Roof Framing Plan
Below is a summary of changes. If you have any questions about the proposed changes, please
don't hesitate to contact us.
Kind regards,
Julianna Morais
Henrybuilt
CHANGE ORDER SUMMARY
BASEMENT/FOUNDATION LEVEL
Please refer to A100, S100 and Z007
1.1 Shift foundation wall @ Grid Line 9 between Line A & D to the West by 7". This adjustment
is done to accommodate the exterior columns that have shifted to the west by 7" and to
accommodate the depth of the sliding door system at the dining room.
1.2 Shift foundation wall @ Grid Line D between Line 7 & 9 to the North by 5". This adjustment
is done to accommodate the depth of the sliding door system above at the living room.
1.3 Convert the area [122 SF] underneath the walkable skylight from a light well to habitable
space by lowering the slab.
1.4 Include (5) pilasters at foundation wall Grid Line D between Grid line 1 and 4. to support
exterior columns above that have shifted to the north by 7".
02/26/201802/26/2018
1.5 Changes 1.1 through 1.4 increase in floor area at basement level. The area is indicated with
a red hatch on A100. Please refer to Z007 for updated floor area calculations that show that the
SF still meets zoning regulation requirements for FAR
1.6 Include foundation wall layout for landscape elements and spa in structural drawings. The
size of the spa remains the same as was previously indicated in the Main Level Floor plans and
landscape plans.
1.7 West of Grid Line 5: Lowered slab on grade and footing elevation by 2.
1.8 @ Grid Line H & 4: Lowered footing elevations to accommodate the sewage ejector.
MAIN LEVEL
Please refer to A101, S101 and Z008
1.9 @ Grid Line 9 between Line A & D : Exterior columns shift to the west by 7". The line of
enclosure at the window remains the same. Therefore the area that counts towards floor area
calculations remains the same.
1.10 @ Grid Line D between Line 7 & 9 to the North by 5”.
1.11 @ Grid Line D between Grid line 1 and 4: Exterior columns shift to the North by 7".
1.12 @ Grid Line 12: Exterior patios added to structural drawings.
UPPER LEVEL
Please refer Z008, S102
1.13 @ Grids D & 9: Minor roof changes made to accommodate window/door openings.
1.14 @ Grid 4 between Grid I & Grid H: Steel beam size changed.
1.15 @ Grid 9 between Grid G & Grid D: Steel beam size changed.
Roof Level
Please refer to S103
1.16 Section detail numbers updated.