Loading...
HomeMy WebLinkAboutFile Documents.287 McSkimming Rd.0044.2018.ARBK287 McSkimming Rd Building Markup Summary Round 1.1 7-18-2017 Page: 8 Page Index: 8 Checkmark: Checked Author: bonniem Date: 7/1/2017 3:20:03 PM File Name: _Architectural HB 05.01.2017.pdf In order for spa to be exempt from RREMP, it must be a package portable spa certified by either CEC or APSP-14 provide a cutsheet showing the certification or include the square footage on the REMP worksheet. _Architectural HB 05.01.2017.pdf (13) Page: 12 Page Index: 12 Checkmark: Checked Author: bonniem Date: 7/1/2017 3:29:56 PM File Name: _Architectural HB 05.01.2017.pdf Show crawl space access per R408.4 Page: 13 Page Index: 13 Checkmark: Checked Author: bonniem Date: 7/1/2017 2:49:51 PM File Name: _Architectural HB 05.01.2017.pdf Handrail required - four or more risers R311.7.8 Page: 13 Page Index: 13 Checkmark: Checked Author: bonniem Date: 7/1/2017 2:53:14 PM File Name: _Architectural HB 05.01.2017.pdf Handrail required - four or more risers R311.7.8 Page: 13 Page Index: 13 Checkmark: Checked Author: bonniem Date: 7/1/2017 2:52:44 PM File Name: _Architectural HB 05.01.2017.pdf Handrail required - four or more risers R311.7.8 SPA WALKABLE SKYLIGHT TER GUEST PATIO FP 3A201 1A202 STANDING SEAM METAL ROOF ROOF 1301 ROOF 2 302 1 2 3 4 5 6 DBUILDING ENVELOPE BELOW +8131.75 0'-10.5" +8140.5 In order for spa to be exempt from RREMP, it must be a package portable spa certified by either CEC or APSP-14 provide a cutsheet showing the certification or include the square footage on the REMP worksheet. 9 10 H1 A200 16'6'10'-72"CRAWL SPACE 2' ELECTRICAL PANEL ELECTRICAL SERVICE, SCD. GC TO COORDINATE SERVICELOCATION w/ MECH. EQUIP. DOMESTIC WATER SERVICE, SCD. Show crawl space access per R408.4 UPGEAR ROOM HALL 3 112 STUDY 111 112.1 111.1 11'-5"5'-9"W "10'-7" FLOOR SK DN 2A +8119.33 +8117.0 F2UPHandrail required - four or more risers R311.7.8 1 A301 2 A201 DNHandrail required - four or more risers R311.7.8 LOWER TERRACE 1 A301 3 A201 111.1 FLOOR SKYLIGHT UPPER TERRA DN Handrail required - four or more risers R311.7.8 1. 2. 3. 4. 5. The proposed custom spa has been included in an updated RREMP sheet. See RREMP Sheet pdf. Access Panel was added to plan. See A100 Basement Level Floor Plan Stair layout was updated See A101 Main Level Floor Plan Stair layout was updated See A101 Main Level Floor Plan Stair layout was updated See A101 Main Level Floor Plan 09/26/2017 Page: 13 Page Index: 13 Checkmark: Checked Author: bonniem Date: 7/12/2017 11:23:16 AM File Name: _Architectural HB 05.01.2017.pdf Provide details with an installation plan for the floor skylight. It must be shown to meet the 40 psf live load requirement. R301.5 Page: 15 Page Index: 15 Checkmark: Checked Author: bonniem Date: 7/17/2017 3:41:14 PM File Name: _Architectural HB 05.01.2017.pdf Show locations for snow stops on the roof plan and elevations. They are required anywhere a roof could shed ice and snow onto potentially occupied areas such as a walkway, stairway, alley, deck, pedestrian and vehicular exit from buildings (Ordinance 40, 2016) R903.6 Snow shed design. Page: 19 Page Index: 19 Checkmark: Checked Author: bonniem Date: 7/1/2017 3:35:50 PM File Name: _Architectural HB 05.01.2017.pdf Elevations should show location for gas meter that complies with utility requirements for distance from openings, and other hazards. Page: 27 Page Index: 27 Checkmark: Checked Author: bonniem Date: 7/17/2017 3:36:42 PM File Name: _Architectural HB 05.01.2017.pdf A continuous air barrier is required in the building envelope. Update wall sections and/or provide additional intersection details to illustrate the continuity of the air barrier. 2015 IECC Table R402.4.1.1 Page: 27 Page Index: 27 Checkmark: Checked Author: bonniem Date: 7/1/2017 3:44:38 PM File Name: _Architectural HB 05.01.2017.pdf Basement walls required to have full insulation value down to 10 feet below grade or to the basement floor, whichever is less. 2015 IECC 402.2.9 LOWER TERRACE UP1 A301 3 A201 A201 OM STUDY 111 HALL 2 109 LIVING 101 POWDER 110 111.1 110A 101.1 11'-5" 7'-5"6'-6"8'-0"5'-9"W 2'-1"FLOOR SKYLIGHT UPPER TERRACE DN 2B2B2A2B 2A F2 D +8117.0 +8117.0 DNF2UP Provide details with an installation plan for the floor skylight. It must be shown to meet the 40 psf live load requirement. R301.5 Show locations for snow stops on the roof plan and elevations. They are required anywhere a roof could shed ice and snow onto potentially occupied areas such as a walkway, stairway, alley, deck, pedestrian and vehicular exit from buildings (Ordinance 40, 2016) R903.6 Snow shed design. EXISTING GRADE @ GRID LINE 12 102.1 PROPOSED GRADE ELECTRICAL METER Elevations should show location for gas meter that complies with utility requirements for distance from openings, and other hazards. PT UPPER RAFTER 16" O.C. 3/4" PLYWD ICE + WATER SHEILD STANDING SEAM ROOF " CLOSED CELL SPRAYINSULATION + FIBERGLASS INSULATION 1" CEILING BOARD 5"X9" GLULAM 4'-0" O.C.RCHITECTURAL GRADE BOVE FINISHED FLOOR - 0" 4" LINEAR SUPPLY GRILLE,SMD ALIGNHENRYBUILT TALL UNIT CEDAR BOARD FASCIA ROOF EAVE BEYOND CONTINUOUS RIGIDINSULATION VH DININ MAIN TERRACE F2 KITCHEN NISHED FLOOR117 0'-6" COVE LIGHTING FLASHING VAPOR BARRIER 2" RIGIDINSULATIONEXTENDEDDOWN 5' - 0" 4B A continuous airbarrier is required inthe building envelope.Update wall sectionsand/or provide additional intersectiondetails to illustrate thecontinuity of the airbarrier. 2015 IECCTable R402.4.1.1 VAPOR BARRIER 2" RIGID INSULATION EXTENDED DOWN 5' - 0" Basement walls required to have full insulation value down to 10 feet below grade or to the basement floor, whichever is less. 2015 IECC 402.2.9 6. 7. 8. 9. 10. Included Glass Flooring System's detail and load chart for walkable terrace skylight See Window schedule,1&2/A430, and 2/A302 Roof plan has been updated to include Drexel snow stops. See A103 Roof Plan East ext. elev. has been updated to show gas meter. West ext. elev.has been updated to show electric meter. See A200's A400:Exterior Wall Type 4B indicates that continuous vapor barrier and 1" rigid insulation is continous where wall intersects with roof A410: Wall Sections also indicate a continuous vapor barrier and insulation detail too Wall Section is updated to show continuous 2" Rigid insulations extending down to the T.O. foundation footing(R10) See A410 09/26/2017 Page: 27 Page Index: 27 Checkmark: Checked Author: bonniem Date: 7/1/2017 3:49:30 PM File Name: _Architectural HB 05.01.2017.pdf Class A assembly is required by Ordinance 40, 2016. Provide documentation that your assembly is listed as a Class A assembly. Page: 28 Page Index: 28 Checkmark: Checked Author: bonniem Date: 7/13/2017 9:36:19 AM File Name: _Architectural HB 05.01.2017.pdf Provide information on the material of the skylight (must be laminated glass not less than .03 inches thick unless a screen is provided)R308.6.2 Page: 28 Page Index: 28 Checkmark: Checked Author: bonniem Date: 7/1/2017 3:59:52 PM File Name: _Architectural HB 05.01.2017.pdf Window schedule (or another location on the plans) should identify which windows are to be safety glazed per R308.4 Page: 1 Page Index: 1 Checkmark: Checked Author: bonniem Date: 7/18/2017 10:42:15 AM File Name: _Mechanical 17009-Permit STAMPED-050117.pdf Winter and summer design temperatures need to match what has been adopted by the City of Aspen (Ordinance 40, 2016). Winter Design temp = -15 deg F. Summer design temp = 82 deg F. _Mechanical 17009-Permit STAMPED-050117.pdf (1) Page: 1 Page Index: 1 Checkmark: Checked Author: bonniem Date: 7/17/2017 3:30:06 PM File Name: 07_17009-Rescheck Report-050117.pdf Many of the windows and doors appear to be custom mulled storefront types. Either verify that these are factory assembled and will have NFRC labels on them stating U-factor or provide a CMA certificate or ASHRAE calculations demonstrating the U-factor. 07_17009-Rescheck Report-050117.pdf (1) ROOF ASSEMBLY ·STANDING SEAM METAL ROOF w/ Class A assembly is required by Ordinance 40, 2016. Provide documentation that your assembly is listed as a Class A assembly. Provide information on the material of the skylight (must be laminated glass not less than .03 inches thick unless a screen is provided)R308.6.2 Window schedule (or another location on the plans) should identify which windows are to be safety glazed per R308.4 Winter and summer design temperaturesneed to match what has been adopted by the City of Aspen (Ordinance 40, 2016). Winter Design temp =-15 deg F. Summer design temp = 82 deg F. d Owner/Agent: Good Property Co.1065B Cemetery LaneAspen, CO 81611 212-993-6442josh@goodpropertycompany.com Designer/Contractor: Vivian HsuHenry Built Corporation4632 Ohio S. Drive Seattle, WA 98132646-798-3866vivian@henrybuilt.com using UA trade-off er Than Code Maximum UA:1138 Your UA:984 ode Index reflects how close to compliance the house is based on code trade-off rules.ate of energy use or cost relative to a minimum-code home. emblies Assembly Gross AreaorPerimeter CavityR-Value Cont.R-Value U-Factor UA Ceiling or Scissor Truss 492 50.2 0.0 0.026 12 :Double Pane with Low-E 29 0.400 12 Ceiling or Scissor Truss 2,461 50.2 0.0 0.026 64 Ceiling or Scissor Truss 998 48.8 0.0 0.026 26 ade): Wood Frame, 16" o.c.1,664 26.0 5.0 0.039 30 Frame:Double Pane with Low-E 478 0.280 134 ass 412 0.280 115 de): Wood Frame, 16" o.c.1,278 26.0 5.0 0.039 42 Frame:Double Pane with Low-E 145 0.280 41 s 65 0.280 18 ade): Wood Frame, 16" o.c.1,690 26.0 5.0 0.039 62 Frame:Double Pane with Low-E 35 0.280 10 id 64 0.300 19 ade): Wood Frame, 16" o.c.1,220 26.0 5.0 0.039 28 Frame:Double Pane with Low-E 209 0.280 59 ming Residence s\2017 - Jobs\17009.00 - 287 McSkimmingulations\Rescheck\17009-Rescheck.rck Page 1 of10 04/20/17Report date:Received 5/02/2017 12:40:38 PM Many of the windows and doors appear to be custom mulled storefront types. Either verify that these are factory assembled and will have NFRC labels on them stating U-factor or provide a CMA certificate or ASHRAE calculations demonstrating the U-factor. 11. 12. 13. 14. 15. Roof Assembly updated to comply See 1/A410 and Drexel Roof Spec pdf Window Schedule is noted to include laminated glass. Window Manufacturer is still TBD WIndow Schedule has been updated to include glass specifcation. All glass is safety glass unless otherwise noted See Mechanical Drawings and Rescheck pdf. See Updated window Schedule. Includes window manufacturer's information and glass specifications See Reshceck 09/26/2017 Page: 1 Page Index: 1 Checkmark: Checked Author: bonniem Date: 7/1/2017 3:16:57 PM File Name: 10_17009-2009 IECC REMP Calculations - SIGNED.pdf Provide additional information on the proposed PV system. Drawings should include tilt and aspect from true South. Provide spec on solar panels showing dimensions, and kW/panel. Also provide the PV worksheet from the tab on the REMP worksheet which can be found here: http://www.aspenpitkin.com/Port als/0/docs/businessnav/BuildorR emodel/2015%20IECC%20REM P%20Calcuations.xls 10_17009-2009 IECC REMP Calculations - SIGNED.pdf (1) R 5/02 Provide additional information on the proposed PV system. Drawings should include tilt and aspect from true South. Provide spec on solar panels showing dimensions, and kW/panel. Also provide the PV worksheet from the tab on the REMP worksheet which can be found here: http://www.aspenpitkin .com/Portals/0/docs/b usinessnav/BuildorRe model/2015%20IECC %20REMP%20Calcua tions.xls 16. Solar PV system specification provided on E002. Also see updated PV worksheet. pdf 09/26/2017