HomeMy WebLinkAboutFile Documents.287 McSkimming Rd.0044.2018.ARBK287 McSkimming Rd Building Markup Summary Round 1.1 7-18-2017
Page: 8
Page Index: 8
Checkmark: Checked
Author: bonniem
Date: 7/1/2017 3:20:03 PM
File Name: _Architectural HB 05.01.2017.pdf
In order for spa to be exempt
from RREMP, it must be a
package portable spa certified
by either CEC or APSP-14
provide a cutsheet showing the
certification or include the
square footage on the REMP
worksheet.
_Architectural HB 05.01.2017.pdf (13)
Page: 12
Page Index: 12
Checkmark: Checked
Author: bonniem
Date: 7/1/2017 3:29:56 PM
File Name: _Architectural HB 05.01.2017.pdf
Show crawl space access per
R408.4
Page: 13
Page Index: 13
Checkmark: Checked
Author: bonniem
Date: 7/1/2017 2:49:51 PM
File Name: _Architectural HB 05.01.2017.pdf
Handrail required - four or more
risers R311.7.8
Page: 13
Page Index: 13
Checkmark: Checked
Author: bonniem
Date: 7/1/2017 2:53:14 PM
File Name: _Architectural HB 05.01.2017.pdf
Handrail required - four or more
risers R311.7.8
Page: 13
Page Index: 13
Checkmark: Checked
Author: bonniem
Date: 7/1/2017 2:52:44 PM
File Name: _Architectural HB 05.01.2017.pdf
Handrail required - four or more
risers R311.7.8
SPA
WALKABLE SKYLIGHT
TER
GUEST
PATIO
FP
3A201
1A202
STANDING SEAM METAL ROOF
ROOF 1301
ROOF 2
302
1 2 3 4 5 6
DBUILDING ENVELOPE BELOW
+8131.75
0'-10.5"
+8140.5
In order for spa to be
exempt from RREMP, it
must be a package
portable spa certified by
either CEC or APSP-14
provide a cutsheet showing
the certification or include
the square footage on the
REMP worksheet.
9 10
H1
A200
16'6'10'-72"CRAWL SPACE 2'
ELECTRICAL PANEL
ELECTRICAL SERVICE, SCD.
GC TO COORDINATE SERVICELOCATION w/ MECH. EQUIP.
DOMESTIC WATER SERVICE, SCD.
Show crawl space
access per R408.4
UPGEAR ROOM
HALL 3
112
STUDY
111
112.1
111.1
11'-5"5'-9"W
"10'-7"
FLOOR SK
DN
2A
+8119.33 +8117.0
F2UPHandrail required -
four or more risers
R311.7.8
1
A301
2
A201
DNHandrail required -
four or more risers
R311.7.8
LOWER TERRACE
1
A301
3
A201
111.1
FLOOR SKYLIGHT UPPER TERRA
DN
Handrail required -
four or more risers
R311.7.8
1.
2.
3.
4.
5.
The proposed custom spa has been
included in an updated RREMP sheet.
See RREMP Sheet pdf.
Access Panel was added to plan.
See A100 Basement Level Floor Plan
Stair layout was updated
See A101 Main Level Floor Plan
Stair layout was updated
See A101 Main Level Floor Plan
Stair layout was updated
See A101 Main Level Floor Plan
09/26/2017
Page: 13
Page Index: 13
Checkmark: Checked
Author: bonniem
Date: 7/12/2017 11:23:16 AM
File Name: _Architectural HB 05.01.2017.pdf
Provide details with an
installation plan for the floor
skylight. It must be shown to
meet the 40 psf live load
requirement. R301.5
Page: 15
Page Index: 15
Checkmark: Checked
Author: bonniem
Date: 7/17/2017 3:41:14 PM
File Name: _Architectural HB 05.01.2017.pdf
Show locations for snow stops
on the roof plan and elevations.
They are required anywhere a
roof could shed ice and snow
onto potentially occupied areas
such as a walkway, stairway,
alley, deck, pedestrian and
vehicular exit from buildings
(Ordinance 40, 2016) R903.6
Snow shed design.
Page: 19
Page Index: 19
Checkmark: Checked
Author: bonniem
Date: 7/1/2017 3:35:50 PM
File Name: _Architectural HB 05.01.2017.pdf
Elevations should show location
for gas meter that complies with
utility requirements for distance
from openings, and other
hazards.
Page: 27
Page Index: 27
Checkmark: Checked
Author: bonniem
Date: 7/17/2017 3:36:42 PM
File Name: _Architectural HB 05.01.2017.pdf
A continuous air barrier is
required in the building
envelope. Update wall sections
and/or provide additional
intersection details to illustrate
the continuity of the air barrier.
2015 IECC Table R402.4.1.1
Page: 27
Page Index: 27
Checkmark: Checked
Author: bonniem
Date: 7/1/2017 3:44:38 PM
File Name: _Architectural HB 05.01.2017.pdf
Basement walls required to have
full insulation value down to 10
feet below grade or to the
basement floor, whichever is
less. 2015 IECC 402.2.9
LOWER TERRACE
UP1
A301
3
A201
A201
OM
STUDY
111
HALL 2
109
LIVING
101
POWDER
110
111.1
110A
101.1
11'-5"
7'-5"6'-6"8'-0"5'-9"W
2'-1"FLOOR SKYLIGHT UPPER TERRACE
DN
2B2B2A2B
2A
F2
D
+8117.0
+8117.0 DNF2UP Provide details with an
installation plan for the
floor skylight. It must
be shown to meet the
40 psf live load
requirement. R301.5
Show locations for snow stops on the
roof plan and elevations. They are
required anywhere a roof could shed
ice and snow onto potentially occupied
areas such as a walkway, stairway,
alley, deck, pedestrian and vehicular
exit from buildings (Ordinance 40,
2016) R903.6 Snow shed design.
EXISTING GRADE @
GRID LINE 12
102.1
PROPOSED GRADE
ELECTRICAL METER
Elevations should
show location for gas
meter that complies
with utility
requirements for
distance from
openings, and other
hazards.
PT
UPPER RAFTER 16" O.C.
3/4" PLYWD
ICE + WATER SHEILD
STANDING SEAM ROOF
" CLOSED CELL SPRAYINSULATION + FIBERGLASS INSULATION
1" CEILING BOARD
5"X9" GLULAM 4'-0" O.C.RCHITECTURAL GRADE
BOVE FINISHED FLOOR - 0"
4" LINEAR SUPPLY GRILLE,SMD ALIGNHENRYBUILT TALL UNIT
CEDAR BOARD FASCIA
ROOF EAVE BEYOND
CONTINUOUS RIGIDINSULATION
VH
DININ MAIN TERRACE
F2
KITCHEN
NISHED FLOOR117
0'-6"
COVE LIGHTING
FLASHING
VAPOR BARRIER
2" RIGIDINSULATIONEXTENDEDDOWN 5' - 0"
4B
A continuous airbarrier is required inthe building envelope.Update wall sectionsand/or provide
additional intersectiondetails to illustrate thecontinuity of the airbarrier. 2015 IECCTable R402.4.1.1
VAPOR BARRIER
2" RIGID
INSULATION
EXTENDED
DOWN 5' - 0"
Basement walls
required to have full
insulation value down
to 10 feet below grade
or to the basement
floor, whichever is
less. 2015 IECC
402.2.9
6.
7.
8.
9.
10.
Included Glass Flooring System's detail and load
chart for walkable terrace skylight
See Window schedule,1&2/A430, and 2/A302
Roof plan has been updated to include
Drexel snow stops.
See A103 Roof Plan
East ext. elev. has been updated to show gas
meter. West ext. elev.has been updated to
show electric meter.
See A200's
A400:Exterior Wall Type 4B indicates that continuous vapor barrier and
1" rigid insulation is continous where wall intersects with roof
A410: Wall Sections also indicate a continuous vapor barrier and
insulation detail too
Wall Section is updated to show continuous 2"
Rigid insulations extending down to the T.O.
foundation footing(R10)
See A410
09/26/2017
Page: 27
Page Index: 27
Checkmark: Checked
Author: bonniem
Date: 7/1/2017 3:49:30 PM
File Name: _Architectural HB 05.01.2017.pdf
Class A assembly is required by
Ordinance 40, 2016. Provide
documentation that your
assembly is listed as a Class A
assembly.
Page: 28
Page Index: 28
Checkmark: Checked
Author: bonniem
Date: 7/13/2017 9:36:19 AM
File Name: _Architectural HB 05.01.2017.pdf
Provide information on the
material of the skylight (must be
laminated glass not less than .03
inches thick unless a screen is
provided)R308.6.2
Page: 28
Page Index: 28
Checkmark: Checked
Author: bonniem
Date: 7/1/2017 3:59:52 PM
File Name: _Architectural HB 05.01.2017.pdf
Window schedule (or another
location on the plans) should
identify which windows are to be
safety glazed per R308.4
Page: 1
Page Index: 1
Checkmark: Checked
Author: bonniem
Date: 7/18/2017 10:42:15 AM
File Name: _Mechanical 17009-Permit STAMPED-050117.pdf
Winter and summer design
temperatures need to match
what has been adopted by the
City of Aspen (Ordinance 40,
2016). Winter Design temp = -15
deg F. Summer design temp =
82 deg F.
_Mechanical 17009-Permit STAMPED-050117.pdf (1)
Page: 1
Page Index: 1
Checkmark: Checked
Author: bonniem
Date: 7/17/2017 3:30:06 PM
File Name: 07_17009-Rescheck Report-050117.pdf
Many of the windows and doors
appear to be custom mulled
storefront types. Either verify
that these are factory assembled
and will have NFRC labels on
them stating U-factor or provide
a CMA certificate or ASHRAE
calculations demonstrating the
U-factor.
07_17009-Rescheck Report-050117.pdf (1)
ROOF ASSEMBLY
·STANDING SEAM METAL ROOF w/
Class A assembly is
required by Ordinance
40, 2016. Provide
documentation that
your assembly is listed
as a Class A
assembly.
Provide information on
the material of the
skylight (must be
laminated glass not
less than .03 inches
thick unless a screen
is provided)R308.6.2
Window schedule (or
another location on the
plans) should identify
which windows are to
be safety glazed per
R308.4
Winter and summer
design temperaturesneed to match what
has been adopted by
the City of Aspen
(Ordinance 40, 2016).
Winter Design temp =-15 deg F. Summer
design temp = 82 deg
F.
d
Owner/Agent:
Good Property Co.1065B Cemetery LaneAspen, CO 81611
212-993-6442josh@goodpropertycompany.com
Designer/Contractor:
Vivian HsuHenry Built Corporation4632 Ohio S. Drive
Seattle, WA 98132646-798-3866vivian@henrybuilt.com
using UA trade-off
er Than Code Maximum UA:1138 Your UA:984
ode Index reflects how close to compliance the house is based on code trade-off rules.ate of energy use or cost relative to a minimum-code home.
emblies
Assembly Gross AreaorPerimeter
CavityR-Value Cont.R-Value U-Factor UA
Ceiling or Scissor Truss 492 50.2 0.0 0.026 12
:Double Pane with Low-E 29 0.400 12
Ceiling or Scissor Truss 2,461 50.2 0.0 0.026 64
Ceiling or Scissor Truss 998 48.8 0.0 0.026 26
ade): Wood Frame, 16" o.c.1,664 26.0 5.0 0.039 30
Frame:Double Pane with Low-E 478 0.280 134
ass 412 0.280 115
de): Wood Frame, 16" o.c.1,278 26.0 5.0 0.039 42
Frame:Double Pane with Low-E 145 0.280 41
s 65 0.280 18
ade): Wood Frame, 16" o.c.1,690 26.0 5.0 0.039 62
Frame:Double Pane with Low-E 35 0.280 10
id 64 0.300 19
ade): Wood Frame, 16" o.c.1,220 26.0 5.0 0.039 28
Frame:Double Pane with Low-E 209 0.280 59
ming Residence
s\2017 - Jobs\17009.00 - 287 McSkimmingulations\Rescheck\17009-Rescheck.rck Page 1 of10
04/20/17Report date:Received
5/02/2017 12:40:38 PM
Many of the windows and doors
appear to be custom mulled
storefront types. Either verify that
these are factory assembled and
will have NFRC labels on them
stating U-factor or provide a CMA
certificate or ASHRAE calculations
demonstrating the U-factor.
11.
12.
13.
14.
15.
Roof Assembly updated to comply
See 1/A410 and Drexel Roof Spec pdf
Window Schedule is noted to include laminated
glass. Window Manufacturer is still TBD
WIndow Schedule has been updated to include
glass specifcation. All glass is safety glass
unless otherwise noted
See Mechanical Drawings and Rescheck
pdf.
See Updated window Schedule. Includes
window manufacturer's information and glass
specifications
See Reshceck
09/26/2017
Page: 1
Page Index: 1
Checkmark: Checked
Author: bonniem
Date: 7/1/2017 3:16:57 PM
File Name: 10_17009-2009 IECC REMP Calculations -
SIGNED.pdf
Provide additional information on
the proposed PV system.
Drawings should include tilt and
aspect from true South. Provide
spec on solar panels showing
dimensions, and kW/panel. Also
provide the PV worksheet from
the tab on the REMP worksheet
which can be found here:
http://www.aspenpitkin.com/Port
als/0/docs/businessnav/BuildorR
emodel/2015%20IECC%20REM
P%20Calcuations.xls
10_17009-2009 IECC REMP Calculations - SIGNED.pdf (1)
R
5/02
Provide additional
information on the
proposed PV system.
Drawings should
include tilt and aspect
from true South.
Provide spec on solar
panels showing
dimensions, and
kW/panel. Also
provide the PV
worksheet from the
tab on the REMP
worksheet which can
be found here:
http://www.aspenpitkin
.com/Portals/0/docs/b
usinessnav/BuildorRe
model/2015%20IECC
%20REMP%20Calcua
tions.xls
16.
Solar PV system specification provided on
E002.
Also see updated PV worksheet. pdf